NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.

Slides:



Advertisements
Similar presentations
The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Advertisements

Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
LINAC4 and 3 MeV test stand at CERN
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
ISIS Accelerator Division
Ion Source Development at RAL Dan Faircloth Including the work of: Scott Lawrie, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
Carbon Injector for FFAG
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Cooler Injector Synchrotron (CIS) at IUCF V.S. Morozov MEIC Collaboration Meeting March 30-31, 2015.
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Alexander Aleksandrov Oak Ridge National Laboratory
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
RFQ 3Dtree Space Charge Studies Simon Jolly 6 th June 2012.
Developments of the FETS Ion Source Scott Lawrie.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
RFQ GPT Input Beam Distributions Simon Jolly 22 nd August 2012.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
ESS Front End diagnostic
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
UK Neutrino Factory Conceptual Design
The RAL Front End Test Stand
The RAL Front End Test Stand
Laser-based Beam Diagnostics for the RAL Front End Test Stand
Progress in the Multi-Ion Injector Linac Design
Physics design on Injector-1 RFQ
Status of the Front End Test Stand April 2007.
1- Short pulse neutron source
Optimisation of the FETS RFQ
H- Ion Source Development
LINAC4 commissioning plans etc.
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
Considerations on Beam Diagnostics Physics
commissioning and measurements
Physics Design on Injector I
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial College London and Warwick University), to design and construct a test stand for demonstrating key technologies for the front end of next generation high power accelerators. The FETS team: Status of the Front End Test Stand at RAL J. Pozimski NuFACT August 2006 John Back (Warwick) Aaron Cheng (Imperial) Christoph Gabor (ISIS/ASTeC) Mike Clarke-Gayther (ISIS) Dan Faircloth (ISIS) Simon Jolly (Imperial) Ajit Kurup (Imperial) David Lee (Imperial) Alan Letchford (ISIS) Ciprian Plostinar (ASTeC) Jürgen Pozimski (Imperial/CCLRC) Peter Savage (Imperial) Chris Thomas (ISIS)…..

NuFACT06, Irvine 27. August 2006 Motivation : Beam loss after injection into rings Some of the beam is not trapped by the RF. Untrapped beam leads to loss, and activation limits beam power. Chopping the linac beam gives little or no beam in the gap and can lead to near 100% trapping efficiency. => Demonstrate the production and clear chopping of a beam as required for high power proton accelerators of the MW range.

NuFACT06, Irvine 27. August 2006 The linac macro pulse is composed of beam bunches at the linac RF frequency – typically 100s MHz. Few ns Unchopped beam Chopper pulse Chopped beam Partially chopped bunches lead to loss in the linac Chopper pulse must rise between linac bunches To achieve perfect chopping a very high speed (<2 ns) chopper is required

NuFACT06, Irvine 27. August 2006 A frequency of 324 MHz has been chosen for FETS, as a suitable high power pulsed klystron is available off-the-shelf from Toshiba - E3740A, 3 MW peak power. A klystron has been ordered for delivery in the 4 th quarter of 2006.

NuFACT06, Irvine 27. August 2006 FETS main components: RFQ, 324 MHz, 3 MeV MEBT, chopper Ion source 70 mA, 2 ms, 10 % dc 3 Soleniod LEBT

NuFACT06, Irvine 27. August 2006 Ion source development Penning H- ion source Surface Plasma Source 35 mA through 0.6  10 mm aperture (  600mA/cm2)  s, 50 Hz  1% duty cycle 0.17  mm mrad 665 keV, 35 mA) Double output current : 35mA → 70mA  Increase pulse length : 200μs → 2 ms  Improve emittance Maximize lifetime Parameters of the ISIS source: Development goals : D. Faircloth 70mA, 1.2 ms

NuFACT06, Irvine 27. August 2006 Initial particle distribution – source emittance D. Faircloth S. Jolly J. Back Measurement – pepper pot scanner Artificial distribution based on slit scanner Measurement – slit scanner MAFIA simulation (  x,rms =0.81  mmmrad;  y,rms =0.97  mmmrad) (  x,rms =0.25  mmmrad;  y,rms =0.25  mmmrad)

NuFACT06, Irvine 27. August 2006 Magnetic LEBT John Back Optimisation of the magnetic design is nearing completion. A 3 solenoid magnetic LEBT is being designed, based on the successful ISIS RFQ injector. An electrostatic LEBT has been rejected due to the close proximity of the caesiated ion source.

NuFACT06, Irvine 27. August 2006 An initial beam optics design has been completed. Further optimisation will be carried out based on the results of the pepper-pot measurements. John Back Simon Jolly Beam trajectory plot and transverse phase space distribution at the RFQ entrance for an artificial input distribution based on slit scanner results. Transverse phase space distribution at the RFQ entrance based on the results of a pepper pot measurement. (  x,rms =1.21  mmmrad;  y,rms =0.93  mmmrad) (  x,rms =0.33  mmmrad;  y,rms =0.33  mmmrad)

NuFACT06, Irvine 27. August MHz RFQ – cold model production A 0.5 m, 324 MHz 4-vane RFQ cold model design is done. Machining and brazing tests have been successfully completed. The cold model contains all the significant features of the final 4 m long design and is nearly finished. 2 copper “quadrants” of the cold model waiting for brazing. Aaron Cheng Ajit Kurup Alan Letchford Peter Savage Juergen Pozimski Design of the 4 vane Cold model Aluminium machining model

NuFACT06, Irvine 27. August 2006 Aaron Cheng Design of the beat pull measurement system. Set up of the beat pull measurements system at Imperial College. 324 MHz RFQ – RF properties measurements A computer controlled bead pull system is currently tested with a pillbox cavity and will be used to perform cavity field measurements on the cold models. Next measurements: September – old ISIS 4 rod RFQ cold model. October – new FETS 4 vane RFQ cold model. Comparison between measured and simulated field distribution using a pillbox cavity. TM 010 Frequency (MHz) unloaded Q, Q 0 Predicted Measured

NuFACT06, Irvine 27. August 2006 An initial beam dynamics design has been completed for the FETS RFQ Alan Letchford The RFQ was optimized for a Waterbag input distribution (0.25  mmmrad, 60 mA) and showed negligible emittance growth and 94% transmission. For the generated data transported through the LEBT the transmission drops to ~83%. (  x,rms =0.35  mmmrad;  y,rms =0.35  mmmrad;  z,rms =0.19  degMeV) For the measured data transported through the LEBT the transmission drops further to ~47%. (  x,rms =0.62  mmmrad;  y,rms =0.62  mmmrad  z,rms =0.21  degMeV)

NuFACT06, Irvine 27. August 2006 High speed beam chopper A novel tandem chopper technique has been developed at RAL to overcome the conflicting requirements of fast rise time (< 2ns) and long flat-top (up to 100  s). Mike Clarke-Gayther Ciprian Plostinar A ‘fast’ chopper creates a short, clean gap in which a ‘slow’ chopper can switch on. The fast pulser is limited in flat-top but can switch between bunches. The slow pulser cannot switch between pulses but can generate the required flat-top. Chopper 1 (fast transition) Chopper 2 / Beam dump (slower transition) BEAM Fast and slow chopper modules

NuFACT06, Irvine 27. August 2006 Three chopper line optics designs are under investigation. A short line keeps the emittance growth low but makes chopping harder and requires some challenging technology. A long line is ‘easier’ but controlling the emittance is more challenging. The short ‘ESS’ solution will require novel, compact, high gradient quadrupoles and DTL- like cavities. Hybrid permanent and electromagnetic quads are being investigated. Mike Clarke-Gayther Ciprian Plostinar

NuFACT06, Irvine 27. August 2006 Diagnostics David Lee Jürgen Pozimski Christoph Gabor Accurate diagnostics are essential for FETS to be successful. In addition to more usual diagnostic devices, non-destructive laser stripping techniques will be employed. Photo detachment Detection of distribution Charge separation                    “no” momentum transfer I(t,y,x)-> 2 D profile, transv.  magnetic dipole I(t,y)-> profile, long.  (TOF)

NuFACT06, Irvine 27. August 2006 Beam is not cylindrically symmetric –So need tomography Measure profiles from different angles –Only 180° coverage required (symmetry) Transverse beam particle distribution will be determined by the use of a laser wire profile measurement device. David Lee Jürgen Pozimski Christoph Gabor Multiple profile measurements under different angles allow investigation of the spatial beam ion density distribution After deflection of the detached electrons from the beam a FDC is used as integral detector. Design of the Laser beam path

NuFACT06, Irvine 27. August 2006 IAP Frankfurt laser transverse emittance measurement system will be adapted to the FETS requirements. Christoph Gabor Jürgen Pozimski Schematic drawing of the set up to determine non destructively the transversal beam emittance, using laser detachment technique. Distribution of the neutralized ions on the scintillating screen.

NuFACT06, Irvine 27. August 2006 Conclusion – Time table Substantial progress has been made on all sub tasks ! Ion source LEBT DIAGNOSTICS RFQ CHOPPER MEBT Construction & Commissioning Design