IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.

Slides:



Advertisements
Similar presentations
RF-Gun cavity for high charge electron generation Takuya Natsui.
Advertisements

Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
1HG may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
Low Emittance RF Gun Developments for PAL-XFEL
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Analysis of TBTS high-gradient testing and breakdown kick measurements Overview of on-going studies Preliminary results 2012 Feb. 291 RF structure development.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
The CLIC decelerator Instrumentation issues – a first look E. Adli, CERN AB/ABP / UiO October 17, 2007.
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
RF break-down studies in the CTF3 TBTS Accurate measurements on TBTS RF Break-Down Studies in the CTF3 TBTS 29 Jan Wilfrid Farabolini 1.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
F. Peauger19th June #3-CTF3 Committee1 CALIFES STATUS CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
What did we learn from TTF1 FEL? P. Castro (DESY).
X-band Based FEL proposal
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
XB-10 1st December 2010TBTS Status- Wilfrid Farabolini1 Status of the CLIC Two-Beam Test Stand 1.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CALIFES A proposed electron beam test facility at CERN
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
First Year of Operation at the Two-beam Test Stand
Status and progress of the CTF3 probe beam
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Sara Thorin, MAX IV Laboratory
CLEX* Status and Plans CTF3 complex CLEX
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
Have a chance to operate your own beam at CERN
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
WG2 Summary: Diagnostics, measurements, and commissioning
The Cornell High Brightness Injector
Injector: What is needed to improve the beam quality?
Advanced Research Electron Accelerator Laboratory
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
CLIC Feasibility Demonstration at CTF3
First results of micro-bunching and COTR experiments at FLASH
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
Experience with photoinjector at ATF
Presentation transcript:

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini22 What is CALIFES ? ParametersSpecifiedTested Energy 200 MeV185 MeV Norm. rms emittance < 20  mm.mrad8  mm.mrad Energy spread< ± 2 % ± 0.5 % Bunch charge0.6 nC0.65 nC Bunch spacing0.667 ns Number of bunches from 1 to 300 rms. bunch length< 0.75 ps1.4 ps TBL decelerator TL2’ Two-Beam Test Stand CALIFES

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini3 CALIFES layout 3 Based on: Photo-injector (LAL Orsay) Laser line (using the same laser as for PHIN) 3 former LIL accelerating structures A single klystron 45 MW, RF distributed to the structures and the gun through WG, splitters, phase- shifter and attenuator. A complete set of diagnostics CALIFES Layout CALIFES in the CLEX Newly installed 3GHz power phase shifter (Franck Peauger and al. IRFU Saclay)

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini44 Laser, bunch charge and QE CsTe photo-cathode quantum efficiency was measured around 1% only during few days after regeneration one year ago. Now it varies between 0.2 and 0.6 % (depending on laser spot position). Laser beam needs to be shaped by a hard aperture thus limiting energy per pulse around 250 nC. In order to achieve reliably the requested bunch charge (0.6 nC) a dedicated laser system with a short beam transport line and capable to deliver 1  J per pulse is under development Photo-injector developed by LAL CsTe photo-cathode QE, bunch charge and laser energy 3 months record [see next talk by Marta] Shaped laser profile on virtual cathode 0.12 nC

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini5 Laser and beam stability Strong correlation between laser energy and beam charge fluctuations Beam position and size jitters Laser energy and beam charge fluctuate accordingly around 4 % rms. Beam position at gun output also fluctuates by 0.1 mm (1  ) Again a dedicated laser with a short beam transport will help to fix the problem. [Marta’s talk ]

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini66 Energy Energy measured with CALIFES and with TBTS spectrometer lines Energy measured with beam deviation by correctors Discrepancy between energy values provided by the 2 spectrometers lines:  E = 10.3 MeV, (5.6 %) Correctors beam displacements vs. current agree with the TBTS one. Max energy is obtained with buncher on crest acceleration but at the expense of bunch length

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini7 Expected energy Compressed pulse (1.2  s) : 138 MW peak (from 45 MW 5.5  s klystron) RF network loss : 1.5 dB Considering the energy gain theoretically provided by the LIL structure E [MeV] = (P [MW] ) 1/ I [A] The maximum energy expected should be 215 MeV not 185 MeV The reason of this discrepancy is still under investigation (phase shift due to the pulse compression ?) In addition buncher phase/energy scans do not fit with a sinus law (bunch drift in the buncher at low  ?) Forward power levels from RF couplers Energy as function of buncher phase shifter position

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini8 Energy spread Energy spread around 1% FWHM Settings with large energy spread separating various bunches Energy spread can easily be lower than ± 0.5 % by tuning accurately RF phases in gun and structures. Settings with very low energy spread

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini99 Emittance Horizontal / vertical quadrupole scan fit and derived beam parameters Emittance was sometimes measured below 20 mm.mrad, other times much higher (> 40 mm.mrad). Quad scan data are difficult to obtain due to the small waist size (<0.1mm) and require the use of the OTR screen with a high optical magnification. Settings to minimize the emittance are not straightforward to obtain Control screen during quad scan

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini10 Bunch length 10 Compression Accélération Laser pulse length measured with a streak camera Deflecting cavity Velocity bunching scheme Thanks to A. Dabrowski and M. Csatari Bunches produces by the photo-injector need to be shorten using the first LIL structure on the raising slope. To measure bunch length, a deflecting cavity is used at zero crossing that allows to enlarge the vertical beam size as function of bunch length. Cavity OFF  y = 0.24 mm Cavity ON  y = 1.47 mm 3 GHz Phase calibration gives 0.94 mm per degree (333 ps for 360 deg) Vert. beam size due to the deflecting cavity: 1.45mm -> Bunch length 1.42 ps at 1  or 3.34 ps FWHM

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini11 Bunch length measurement with ACS ACS 12GHz OFFACS 12GHz On at zero crossing The 12 GHz accelerating structure can be used to measure the bunch length, even more efficiently than the 3 GHz deflecting cavity. Measures done for various phases of the buncher give pulse length scaling from 1.46 ps to 5.6 ps. zero crossing: no energy variation But energy spread increase

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini12 Cameras degradation due to radiations Camera close to the dump at the installation The same camera after 2 months Despite the thick lead shield (5 to 10 cm), cameras close to the TBTS dumps have suffered from radiations: high noise on CA.MTV0790 and no more signal from the CM.MTV0590. But the degradation is now stabilized, so it probably happened during a severe drive beam loss operation. Pattern included in the screen 0.2 mm 0.1 mm 0.05 mm MTV0790 showing the lead shielding and the LED lighting

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini13 Probe beam operational for TBTS studies Good beam transport through TBTS Capability to change the probe beam phase vs. drive beam User friendly control panels (Martin Nybo EN / ICE) Energy gain and energy spread vs. phase 180 deg : OK 130 deg : Pb in phase shifter

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini14 CALIFES foreseen improvements A dedicate laser system Accurate calibrations of the spectrum line, phase shifters, RF couplers… Extensive use of the BPMs (presently displacements are not calibrated) Installation of an RF pick-up to monitor the bunch length Installation of a moving slot in front of the first screen to measure gun emittance Development of a beam dynamic model type “flying simulator” Possible construction of a instrumentation test beam line (ITB) parallel to the TBTS (manifestations of interest are welcomed)

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini15 The Instrumentation Test Beam project 8 m 1.0 m CLIC Module footprint 1.45 x 2.1 m 2.0 m Beam dump to be removed CLIC Module transport 2.0 m 1.0 m 8.0 m 0.7 m 0.43 m 35 deg 20 deg First step: record the potential users for this line with their requirements in terms of performances and ancillaries. (Anne’s talks about CTF3 instrumentation, opportunities and limitation, WG6). Not necessary the actual CALIFES performances: thanks to the chicane pulse length as short as 20  m could be obtained (Volker’s study Short Pulse Capabilities of the Instrumentation Beam Line, Uppsala University 6 may 2010). Feasibility, beam dynamic, drawings, equipments collections, construction…

IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini16 Conclusions CALIFES probe beam is now routinely used for the TBTS operations and provides useful and trusty data about ACS behaviour. Good beam parameters are reasonably easy to obtain and then are stable in time. The operations suggest improvements in some characteristics that will be developed this year. Many thanks to so many people from CERN and from the collaborations who have continuously shown their supports and encouragements.