Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Status and outlook of the Medipix3 TSV project
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
A.Nomerotski,2/3/ Layer0 Status Andrei Nomerotski 2/3/2005 Outline  Introduction  Module Production  Assembly of Layer0  Electronics  System.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
Dec
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Sensor design and procurement status Mathieu Benoit.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
QCG Report Francesco Forti University and INFN, Pisa.
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
Berkeley status Aug 10th, 2012.
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Equipment for Assembly – UK Experiences
Module/Ladder Assembly
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab

Silicon Meeting July 10, cm Gang Production Status  Tooling for 20cm Gang production u Prototype fixtures (2 sets) available for use now u First production batch (3 sets) received, QCed, Ni/Teflon coated s Being assembled by Lab B staff now u Final production batch (5 sets) in fabrication at MSU s Expect delivery this month, ready for use ~4-6 weeks later  Storage Boxes u Gangs will be stored in L2-5 module burn-in boxes u We have 25 boxes assembled at Fermilab u Remaining 300 boxes being fabricated by Brown s Parts are fabricated and procured s Assembly process at Brown is being debugged now s Expect all boxes to be available by September  Procedures and QA/QC u Assembly procedures written and tested u Additional technical staff needs to be trained (scheduled to start 9/9) s Training in operation of Zeiss 500’s as well as sensor handling and gluing u OGP program written to inspect gangs u Need to verify that database is ready for gang production entries

Silicon Meeting July 10, 2003 L1-L5 Module Tooling Overview  5 flavors of fixture, all very similar u L1 (160mm finished module length) u 20cm gang & 10-10A, 10-10S (200mm modules) u 20-20A, 20-20S (400mm modules)  Alignment and Gluing  Precision alignment of sensor to sensor <5   Alignment of hybrid to sensors to ~50   Module flipping u Backside HV connection from hybrid u Kapton HV insulation to isolate sensor from structure (L1) u Ground contact from hybrid for support structure (L1)  Wirebonding u Axial and stereo can be bonded on same fixtures (3 types)  Reasonably flat (~50  ) vacuum chucks 160, 200 & 400mm long  All tooling used successfully with electrical prototype modules

Silicon Meeting July 10, 2003 L2-5 Module Fixture Status  Four fixtures used in module production u Hybrid alignment fixture: aligns hybrid to handle for next tool u Assembly fixture: aligns sensors (or gangs) and hybrid u Bonding fixture: used for module transfer and wire bonding u Flip fixture: used for making back-side HV connection  Prototype fixtures fabricated long ago u Initial prototypes worked very well u Small modifications implemented to ease module transfers s Second prototypes of these parts have been made and tested u Written procedures and CMM programs developed and tested  Production fixtures u axial fixtures are the 20cm gang fixtures u stereo require swapping one part on 20cm gang fixtures u axial and stereo are identical except one part u Production scheduled to start 2/4/04 s “Finalize design” dependent on final hybrid sign-off (11/03) s Probably possible to do production earlier –Mechanical aspects of hybrids should be stable earlier –Hybrid alignment tools are only ones awaiting approval of fabrication drawings

Silicon Meeting July 10, Axial Module Fixture

Silicon Meeting July 10, 2003 Status of L2-5 Electrical Modules  We have produced a total of 7 electrical modules u Axial #7, Amitron hybrid, Irradiated sensors (not for stave) u Axial #103, OK for stave u Stereo #1, OK for stave u Axial #8, Amitron hybrid, Electrical test module (not for stave) u Axial #108, 9 working chips, OK for first stave but not ideal u Stereo #2, Chips 1,2 bad, needs debugging u Stereo #12, Chips 6-10 re-bonded & poor hybrid alignment  Additional modules to be produced for electrical staves u Two modules need replacement in order to build 1 st stave s Waiting for ~10 sensors to build new modules u Need full compliment of electrical modules for 2 nd stave s Need an additional ~20 sensors for this

Silicon Meeting July 10, 2003 QA of L2-5 Electrical Modules  Electrical QA/QC (Cecilia) u Burn-in s Hybrid burn-in is up and running –Need to write procedures and train personnel s Module burn-in is almost there –Need to confirm cooling system operation –Need to complete software for running HV –Need to write procedures and train personnel s Personnel should be integrated to augment Gustavo’s efforts now u Debugging is essentially non-existent still u Need to define grading scheme for hybrids and modules (done?) u Need to define interface from QA/QC to database (done?)  Mechanical QA/QC (Jim) u Some OGP programs written u Need to certify programs for all module types u Need to write procedures, including file naming conventions etc. u Need to write scripts to prepare OGP output files for database

Silicon Meeting July 10, 2003 Fabrication of mechanical and electrical preproduction staves  Mechanical stave prototype u Modules on stave core 12/18/02, used for cooling studies u C-channels attached in June, 2003  Mechanical stave pre-production u Scheduled for completion 6/13/03 u Assembled in June/July with extensive QC (done 7/3/03) u Written assembly procedures followed throughout  Electrical grade pre-production staves u Assembly scheduled for 6/16-7/14 (schedule says 2 staves) s One core and set of C-channels are available –Additional cores will be available, using revised tooling, 8/1 –Additional C-channels will be available by 8/1 also u Module assembly and burn-in are delaying assembly now s Need minimum of 30 sensors to complete this task per schedule u Written procedures fleshed out with mechanical staves s Mechanical QC of modules on staves needs to be added to procedures u C-channel grounding out to Junction Cards needs to be finalized