Tutorial Ecomindmap. Goal Ecomindmap First step in each project phase  understand the system! Ecomindmap helps: Mapping the ecosystem, while considering.

Slides:



Advertisements
Similar presentations
1 Lessons learned – success factors for biodiversity projects Peter Tramberend Environment Agency Austria.
Advertisements

In Europe, When you ask the VET stakeholders : What does Quality Assurance mean for VET system? You can get the following answer: Quality is not an absolute.
Aajeevika Skills Visioning Workshop 24 th Feb 2014 Visioning Exercise Briefing.
TECHNOLOGY IN THE NEW ZEALAND CURRICULUM 2007 What does it all mean? 1.
TECHNOLOGY IN THE NEW ZEALAND CURRICULUM 2007 What does it all mean? 1.
“Participatory approaches towards water management: transboundary cooperation in the River Lielupe (Latvia/Lithuania) ” 9 June 2005, St. Petersburg,
Spatial planning in the marine environment Gillian Glegg and Jonathan Richards.
Communication on "Land as a Resource" Jacques DELSALLE Head of sector Land & Soil European Commission, DG Environment FoEE Conference "Putting resource.
Marcel Kok PBL Netherlands Environmental Assessment Agency
Understanding the Impact of Geographic Tools High School Tennessee Geographic Alliance One Day Geography Workshop Instructor Kristi Neuroth Ravenwood High.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
HR Business Impact Survey Introductory Slides can be adapted.
What is actor analysis? … a way to understand who is affected by and who has the power to influence water policy decisions and implementation, i.e. the.
Understanding Territorial Impacts: Tool for Territorial Impact Assessment Bernd Schuh (ÖIR) Karkow, Nov
Building Change Capability ‘To put in place the processes and people to support change within STFC’ Draft Blueprint Design v0.1 Project Manager: Steve.
Community agencies: partners in accession Cooperation with EMCDDA - Polish experience Boguslawa Bukowska, National Bureau for Drug Prevention ,
Final Conference June Maastricht, The Netherlands 1 Case Study: Kłodnica catchment, (Odra river basin) Poland Janusz Krupanek Institut for Ecology.
Slide 1 Final Conference Stratos Papadimitriou Cracow, September 2009 Work Package C A Quality Management Approach for Managing Mobility in Medium and.
ENERGY EFFICIENCY CENTRE GEORGIA  Support to renewable energy and energy efficiency utilization for sustainable development and as a result improve national.
How Are Marine Protected Areas Created? A Guide for the Lay Person.
Geert R. Teisman Scientific Director Innovation Program Living with Water Professor in Public Management Erasmus University Governance systems for flood.
AWARE: Stakeholder Analysis Udaya Sekhar Nagothu, Per Stålnacke, Bioforsk, Norway. AWARE kick-off meeting Rome, 3-5 June, 09.
Sustainability Metrics  Lecture 1-Weak Sustainability Metrics Dr Bernadette O’Regan  Lecture 2-Strong Sustainability Metrics Prof Richard Moles  Lecture.
1 CSA 6 - Chłapowski Landscape Park in Poland” Warsaw University of Life Sciences – SGGW Agata Malak-Rawlikowska, Edward Majewski.
1 The IMAGE project I ndicators for fisheries MA naGement in E urope A specific targeted research project under the European Commission 6 th framework.
Marine Biodiversity and Ecosystem Functioning EU Network of Excellence A key product of MarBEF will be a new generation of professional marine ecosystem.
Atlin/Taku Land Use Planning Update Presentation to Multiparty Workshop #3 March 6, 2009.
1 Cover Slide Company Name Company Contact info Tagline This template provides a basic outline for a short investor pitch. Focus on visuals, graphs, and.
Measuring Progress towards Green Growth through indicators OECD work UNCEEA Sixth meeting New York, June 2011.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
GEELONG REVISITED FROM ESD TO EBFM - future directions for fisheries management A COMMERCIAL INDUSTRY PERSPECTIVE ON THE ESD FRAMEWORK Neil MacDonald,
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
Supporting Development of Organisational Knowledge Management Strategy NHS Librarians Meeting 3 rd June 2010.
Planning and Sustainability Paul Farmer American Planning Association M6: Protecting the Urban Environment and Historical and Cultural Heritage.
1 NOAA Priorities for an Ecosystem Approach to Management A Presentation to the NOAA Science Advisory Board John H. Dunnigan NOAA Ecosystem Goal Team Lead.
1 Bringing Global Thinking to Local Sustainability Efforts: A Collaborative Project for the Boston Region James Goldstein Tellus Institute.
URBAN STREAM REHABILITATION. The URBEM Framework.
…empowering communities through modeling and adaptive management Adaptive Management Conservation Strategies for Restoring Ecosystems.
ECOSTAT WG2A meeting 7-8 October 2004 Eutrophication Activity Status report Presented by Ana Cristina Cardoso.
19 oktober 2010 Art 9 in NL and EU Past present and future (all in 10 minutes!) Rob van der Veeren Water service Cost recovery ProviderUser Recovery means.
Myanmar River Health Framework (MRHF) Ecosystem Services and River Livelihoods.
The Mission The company you work for is expanding to the countries to the north and south of the United States. As an important member of this company.
Well-governed fisheries sector Abundant fisheries resources Healthy environment and habitats Increased jobs, profits, and improved economy Improved human.
Decision analysis and risk management: Introduction to course Jouni Tuomisto, THL.
Environmental Progress in the EU Indicators: a communication tool.
Preparing for Climate Change: British Columbia’s Adaptation Strategy Thomas White Climate Action Secretariat 26 January 2010.
5. Impact assessment world café: Ecosystem services
Technical Leaders Group Update 16th September 2014
Ex post evaluation of ERDF and Cohesion Fund
Bridgnorth : Using Google Earth
Oceans and Society: Blue Planet
Overview of global initiatives and their relevance for the EU context
Update on economic and social analyses in the OSPAR area
Outcomes from consultation of pressures and threats list
The EU WATER POLICY.
AquaSpace Case Study Normandy and Cancale, France: Issues and Tools
URBAN STREAM REHABILITATION
Strategic Coordination Group Eutrophication Guidance
Progress of the preparations for a White Paper on Adaptation to Climate Change Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit.
Turloughs (1) Definition:
Presenter Name Affiliation Date
Revision of MSFD Decision 2010/477/EU - overview
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Preparation of the second RBMP in Romania
Agenda item 3.3 (d) Common monitoring framework
DG Environment, Unit D.2 Marine Environment and Water Industry
Towards a Water Scarcity & Drought Indicator System (WSDiS)
DG Environment, Unit D.2 Marine Environment and Water Industry
What does it mean to have a forest in a Natura 2000 area?
Presentation transcript:

Tutorial Ecomindmap

Goal Ecomindmap First step in each project phase  understand the system! Ecomindmap helps: Mapping the ecosystem, while considering the socio- economic and governance system, using ecosystem services Usage skills: Ecological knowledge and knowledge on the system at hand (ecosystem) Different people who have knowledge on the three systems (in workshop)

BwN interest Get an overview of the natural system and its links to the socio-economic and governance system in a limited amount of time Expand project-objective from technical to nature-inclusive, add value for nature and society Applicable in all phases of a project, level of detail differs

Framework Requirements: Mindmapping software, eg. Prezi, or a whiteboard Prezi Ecomindmap

Step 1 – Project objective and location Step 1: Define the project objective (the problem definition) and define the project location Who: Project team or project leader Example: The water in the Markermeer is characterized by a high turbidity. This causes threats to the nature quality and to several ecosystem services, such as fisheries and recreation. This project aims to contribute to solving the turbidity problem in the Markermeer

Step 2 – The ecosystem Step 2: Map the ecosystem using the 6S model in the Ecomindmap framework Who: Ecologist

Step 2 – The ecosystem For each component, fill in the characteristics that describe the ecosystem best these can be intact or degraded natural characteristics use only clear words or short sentences if possible insert pictures or graphs a zoom function – as in Prezi - can help focusing on more detailed characteristics of the system.

Step 2 – example Structures dikes prevent water to reach lake shores hard shore substrate change in time from clay substrate to fine silty substrate (water bed) 700 km2 surface area Substances change from salt water to fresh water high silt concentrations low light level in water decline in nutrients because of construction Houtribdijk

Step 3 – Ecosystem services The links between the ecosystem and the socio-economic system are the ecosystem services categorised as: Provisioning Regulating Cultural Supporting Click for explanation Who: Workshop with an environmental economist (trained in defining ecosystem services) an ecologist, a technically trained person and a person who knows the project site

Step 3 – Example Provisioning services fish water for agriculture, drinking water and cooling water transportation connection energy (wind) sand cultural services various forms of water recreation, eg. sailing, fishing, surfing, motor boats nature viewing aesthetics

Step 4 – Governance and Society Three categories of actors / interest groups are distinguished: Stakeholders: Organizations, networks and individuals that have an interest in the project (area) Legislators: The legislators set legislative boundaries relevant to the project Decision makers: The organizations or individuals who take the crucial decisions in the project (area) Who: Same workshop setting as in step 3, preferably added with someone with knowledge on local stakeholders and governance setting

Step 4 – Example Stakeholders people living nearby nature organizations interest groups fishermen companies Decision makers national government of the Netherlands local governments: provinces and municipalities water boards and Rijkswaterstaat (RWS) EU

Step 5 – Make connections Make connections between the different components draw only the arrows representing the most important connections the more arrows (beyond a certain minimum), the more unclear the Ecomindmap becomes a connector (arrow) can be accompanied by a brief explanatory text, or by a ‘+’ or ‘-‘ sign Who: In workshop as in step 4

Step 5 – Example

Step 6 – Discussing the outcome The resulting Ecomindmap gives an overview of the most important ecological characteristics linked to ecosystem services and socio-economic characteristics which ecological factors provide opportunities for the design; fragile ecological characteristics that can be strengthened or strong characteristics that can be used to drive natural processes supporting the project realisation The Ecomindmap shows opportunities to add objectives and values and indicates which organizations or individuals should be involved in the project. Moreover, it helps identifying important gaps in the system knowledge.

Prezi mindmap Markermeer

See for further information Ecomindmap tool on BwN wiki