Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013 Enterprise Operations Overview.

Slides:



Advertisements
Similar presentations
Unit 17 - Rules -. July 2007© SAP AG and The Rushmore Group, LLC Business Process Integration Rules SD.
Advertisements

M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 8 - ERP Modules Ir. Ekananta Manalif, MM, MKom (D2664)
Production and Planning Master Data SAP Implementation
Enterprise Operations Overview EGN 5622 Enterprise Systems Integration Spring, 2015 Enterprise Operations Overview EGN 5622 Enterprise Systems Integration.
Introduction to SAP R/3.
Enterprise Systems Configuration Production Planning Master Data EGN 5620 Enterprise Systems Configuration Spring, 2012.
Intro to Enterprise Systems & Operations EGN 5620 Enterprise Systems Configuration Spring, 2014 Intro to Enterprise Systems & Operations EGN 5620 Enterprise.
Production Planning Processes Theories & Concepts
Material Management (MM) Master Data & Records EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
Pen Inc Introduction to Your Company
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Customer Service (CS) SAP University Alliances Authors Tim Böttcher
Controlling Management EGN Enterprise Systems Integration Spring, 2015
Intro to SAP Enterprise Systems Configuration EGN 5620 Enterprise Systems Configuration Fall, 2012.
Clients (and the interface level) Application Server (and the application level) Database Server (and the Database level)
Intro to Enterprise Systems & Operations EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013 Intro to Enterprise Systems & Operations.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Fall, 2015.
The Enterprise Systems Track Professional MSEM Fall, 2012 The Enterprise Systems Track Professional MSEM Fall, 2012.
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2012.
Business ByDesign EGN 5622 Enterprise Systems Integration Spring, 2012.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration Spring, 2013 High-Level OP Planning and Demand Management EGN 5622.
The Enterprise Systems Track Engineering Management Spring, 2013 The Enterprise Systems Track Engineering Management Spring, 2013.
Enterprise Assets Management EGN 5622 Enterprise Systems Integration Fall, 2015.
Controlling Management EGN Enterprise Systems Integration Fall, 2015
Introduction to Financial Accounting Management EGN 5622 Enterprise Systems Integration Fall, 2015 Introduction to Financial Accounting Management EGN.
Intro to SAP Enterprise Systems Configuration EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Spring, 2015.
Introduction to SAP Tom Wilder, Department of Accounting and MIS California State University, Chico.
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Professional (MSEM) Fall, 2012.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration Spring, 2014 Enterprise Operations Overview & Strategic Planning.
Assets Management Concepts & Theories
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Fall, 2011.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1 Slides used in class may be different from slides in student pack Managerial Briefing 13 Enterprise Resource Planning Systems  Enterprise Resource Planning.
Intro to Enterprise Systems & Operations EGN 5620 Enterprise Systems Configuration Fall, 2013 Intro to Enterprise Systems & Operations EGN 5620 Enterprise.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration Fall, 2015 High-Level OP Planning and Demand Management EGN 5622 Enterprise.
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration Spring, 2013 Enterprise Operations Overview & Strategic Planning.
Enterprise Operations Overview EGN 5622 Enterprise Systems Integration Fall, 2015 Enterprise Operations Overview EGN 5622 Enterprise Systems Integration.
Production Planning Master Data EGN 5620 Enterprise Systems Configuration Fall, 2015.
Contact us: Call: Mail: Visit:
Materials Management (MM) Organizational Structure EGS 5620 Enterprise Systems Configuration Spring, 2016.
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
Financial Reports EGN 5622 Enterprise Systems Integration Fall, 2015 Financial Reports EGN 5622 Enterprise Systems Integration Fall, 2015.
Enterprise Systems Architectures EGN 5620 Enterprise Systems Integration Professional MSEM Fall, 2012.
1 - Organizational Structures -. Organizational Data  A hierarchy in which the organizational units in an enterprise are arranged according to tasks.
PP/MM Module User Training SAP 教材. Overview Organization and Business Process.
ERPsim Overview EGN 5621 Enterprise Systems Collaboration MSEM, Professional Fall, 2013.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration Fall, 2015 High-Level OP Planning and Demand Management EGN 5622 Enterprise.
Production Planning & Execution
Production Planning & Execution
Materials & Logistics Management
High-Level OP Planning
Enterprise Systems Integration Spring, 2012
Intro to Enterprise Systems Architectures EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
High-Level OP Planning
Global E-Business: How Businesses Use Information Systems
Actual Postings Financial accounting Materials mgmt Controlling
ERPsim Overview EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
Enterprise Operations Overview
Production Planning Master Data EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2011.
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2012.
Production Planning & Execution
Production Planning Processes SAP Implementation EGN Enterprise Systems Configuration
Enterprise Operations & Strategic Planning Overview EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2011.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013.
High-Level OP Planning
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Spring, 2014.
Presentation transcript:

Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013 Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013

Enterprise Operations Overview EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013

January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC All rights reserved.3 Enterprise Operations Planning OP Execution Execution Detailed OP Planning High-Level OP Planning Forecasting Sales and Operations Planning Demand Management MPSMRP Sales Information System CO/PA Manufacturing Execution Sales Process Procurement Process Strategy Planning - Vision - Goals & Objectives - Strategy - Product Portfolio and Roadmap Warehouse Management

Enterprise Strategy Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013

Enterprise Planning Process Business Process platform

Enterprise Planning stages and Levels Source: Freyburger Planning Levels Top Management Division Cost Center Planning Stages Vision, Goals, & Milestones Actions & Quantities (cost, time, & peformance) Approval & Rejection Budget Finance Approval Controlling

Factors which impacts Business Planning

Business Planning Process

Planning Areas ◦Finance ◦ Cost center planning ◦ Assets planning ◦ Profitability planning ◦ Liquidity & investiment planning ◦Demand and Production ◦Marketing & Sales ◦Maintenance ◦Human Resources ◦Etc.

Linking the Component Plans Source: Gluchowski, Gabriel, Dittmar Revenue Plan Sales Plan Production Plan price trend bill explosion Financial Plan Investment Plan Capacity Plan Personnel Plan Procurement Plan Cost Projection Overhead Costs Planned Profit interest amortization machine hourly rate personnel costs costs of supply work shedule rate of turnover

Planning Example of Global Company

Intra-Enterprise Systems Integration Vertical Integration Corporate Planning Accounting Supplier Management, Production Planning, Cost Planning, … Supplier Accounting PurchasingProd.SalesPersonnel Warehouse Accounting Customer Invoices Employee Salary Administration II: Amount-Oriented Processing Administration I: Value-Oriented Processing Disposition and Planning Analysis and Controlling Strategic Enterprise Management Horizontal Integration Source: Mertens, P., Meier, M.: Integrierte Informationsverarbeitung (2009), 1. Top Management Middle Management Lower Management

Enterprise Strategy Pyramid

Enterprise Strategic Planning SAP Implementation EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013 Enterprise Strategic Planning SAP Implementation EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013

R/3 SAP Module View Integrated Solution Client / Server Open Systems Financial Accounting Controlling Fixed Assets Mgmt. Project System Workflow Industry Solutions Production Planning Sales & Distribution Materials Mgmt. Plant Management Quality Maintenance Human Resources

SAP Access Navigation

SAP BPI Client, Userid, Password SAP R/3 Exercises Client: 615 Application server: madrid.cob.csuchico.edu System number: 01 System ID: MDR Userid: bpi-025 to bpi-047 Initial password:

Enterprise Structure Plant (P0_ _) Client (615) Chart of Accounts (C0_ _) Company Code (0 _ _) Fiscal Year Variant (K1) Credit Control Area (C0_ _) Purchasing Org. (P0 _ _) Purchasing Group (0_ _) Shipping Point (S0_ _) Sales Org. (S0 _ _) Distribution Channel (RE/WH) Division (01) Sales Area Controlling Area (C0 _ _) SL10SL20 SL30 Work center (WC0 _ _) Cost centers

Check Company Code/Chart Account:

Check company code/Fiscal Year Variant

Check Credit Control Area

Check Plant

Check Storage Locations

Check Purchasing Organization

Check Financial Accounts

Check Vendor List

Check Standard Hierarchy of Cost Center

Exercises: 1.Suppose you purchase raw materials from your vendor Pen Parts. Please list required quantities and total costs of raw materials for making 10,000 of EPN0_ _. 2.What is your work center? - Number of individuals - Capacity utilization rate - Total capacity of your work center 3.How many hours are required to make 10,000 pieces of EPEN0_ _? What is the difference if the efficiency level is 85%? (Hint: for setup time, you only need to count it when you start to do the first EPN0 _ _. 4.If the setup and labor cost is $20/hour. What is the total manufacturing cost for making 10,000 pieces of EPEN0_ _. (Hint: Mfg cost = raw materials cost + lab cost)