1 Martin Zralý: COST CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University in Prague.

Slides:



Advertisements
Similar presentations
1 Martin Zralý: COST CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University in Prague.
Advertisements

1 Martin Zralý: ENTERPRISE MANAGEMENT CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University.
Accounting 6310 Chapter 6 – Budgeting.
How Do I Stay on Track? Monitoring and Control Requires: Identifying factors critical to success Measuring performance Defining standards of expected.
Management Control Systems and Responsibility Accounting
24 Performance Evaluation for Decentralized Operations Accounting 26e
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Strategic Business Planning for Commercial Producers
Chapter 9 BUDGETING A budget is a formal written statement of management’s plans for a specified future time period, expressed in financial terms Control.
Time and Cost Estimation
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
13 Management Control Systems, The Balanced Scorecard, and Responsibility Accounting.
Cost Control Measures for Food Service Operations
Budgets. On completing this chapter, we will be able to: Understand why financial planning is important. Analyse the advantage of setting budgets- or.
Financial performance measures and transfer pricing
LECTURE ESSENCE AND STRUCTURE OF BUSINESS PLAN. 1.The concept of business – plan 2.Contents (parts) of business plan.
The Master Budget and Flexible Budgeting
9 - 1 ©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 9 Management Control Systems.
Chapter 20 The Budgeting Process.
© The Delos Partnership 2007 page 1 Creating the visibility to manage the crisis Developing a proper Demand Planning and Management process.
Project Planning and Capital Budgeting
Full Costs and Their Uses
Controlling Preview Steps in the Control Process Three types of Control Characteristics of Effective Control Systems Financial Controls a. Financial Ratios.
22 Budgeting Accounting 26e C H A P T E R Warren Reeve Duchac
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
1 Profit and Cost Center Performance Evaluation CHAPTER 10 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in.
Budgetary Control and Responsibility Accounting
Chapter 2 Introduction to Cost Management Systems.
IE 475 Advanced Manufacturing Costing Techniques
1 Mgmt 371 Chapter Twenty Basic Elements of Control Much of the slide content was created by Dr, Charlie Cook, Houghton Mifflin, Co.©
BUDGETING Reference – Mgmt Accounting –Reddy and Sharma.
W. BentzEMBA 8021 Agenda for October 27, 1999 Comments on Copeland Wellesley Paint Co. Case On measuring capacity Standards for Toledo Tool.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
1 Martin Zralý: ENTERPRISE MANAGEMENT CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury.
MSE608C – Engineering and Financial Cost Analysis Managerial Accounting.
Chapter 17 Pricing and product mix decisions. Major influences on pricing decisions §Customer demand and reactions §Competitor behaviour §Costs l price.
JOB EVALUATION MAGNETIC CONTACTORS.
Market Research & Product Management.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Chapter 25: Reporting and Evaluation McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Slide content created by Charlie Cook, The University of West Alabama Copyright © Houghton Mifflin Company. All rights reserved. Chapter Twenty Basic Elements.
Slide content created by Charlie Cook, The University of West Alabama Copyright © Houghton Mifflin Company. All rights reserved. Chapter Twenty Basic Elements.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Management Accounting: Chapter 1. Management Accounting: Basic Framework.
Part One: Introduction to Management and Cost Accounting
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Value 4 Golf is formed by a group of professionals who have been all their life linked to the world of golf, and actively participating.
Budgeting Unit 4 Further aspects of management accounting Mr. BarryA-level Accounting Year 13.
9 - 1 Chapter 9 Management Control Systems and Responsibility Accounting.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
Review.
© 2010 South-Western, Cengage Learning, Inc. All rights reserved.
Procurement- Lecture 3 Customer service and logistics
INTRODUCTION For effectively control the organizational activities, a large number of controlling techniques are available. They help to produce right.
INTRODUCTION OF COST ACCOUNTING
Basic Cost Management Concepts
Cost Accounting and Reporting Systems
PLANNING TOOLS AND TECHNIQUES
Management Functions Administration
Decentralization and Performance Evaluation
MANAGEMENT Part Six: The Controlling Process
PowerPoint presentation
Comparison of Planned and Real State of Building Order
The Master Budget and Flexible Budgeting
Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n „Innovation of Subject Financing of Building.
Presentation transcript:

1 Martin Zralý: COST CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University in Prague Prague 11/2011

2 What is it about ? What is it about ?  Subjects of Cost Control  Information areas linked with Cost Control  Budgeting - principal notes + relationships  Costing - principal notes + relationships + recent development  Hour Cost Tariffs (HCT) Method principal notes + applications  Example: Application of Contribution Margin + HCT-Method in Costing structure  Final Conclusions to Cost Control

3 Subjects of Cost Control What are the basic subjects (entities), to which the costs are linked?  Products (incl. services) (set of products, product’s group)  Processes: productive + supportive  Activities (= as parts of processes or autonomous ones)  Projects  Resources:  Human  Tangible and Intangible  Finance  Departments (Centres)  All of then join technical and financial features in mutual interaction

4 Information areas (agenda) directly linked with Cost  Budgeting, namely Operating budgeting  Costing  Accounting, namely Internal Accounting (on entities)  Financial and Investment Calculations  Operative recording (non-financial measures): time, capacity utilization, quantity, …

5 Basic practical principles of the Oper-budget application Basic practical principles of the Oper-budget application 1/2 Budget is primarily about Activities and Processes !!: Figures of Costs + Revenues are only the consequence (BUT important!) of the decision which Activities to do and in which way Activities (processes) to do (BUT important!) of the decision which Activities to do and in which way Activities (processes) to do  Budget = a trivial matter ??  It is about, what I (= manager) do. Do I know it? YES?  Then: No problem to create the budget !  Then: No problem to create the budget !  The budget creating put the questions, which are useful (needed) for deeper understanding of Activities within the department or process:  Do I know, what is the utility of it ?  Revenues (Incomes)  Do I know, how much does it cost ?  Costs (Expenditures) + Summary the ANSWERS.

6 2/2  Budget = complex matter. It concerns on:  Content and providing of Activities and Processes and their measurement (indicators has to be determined)  Needed resources: Workers (staff), machines, equipment, software, …  Costs and Revenues  Future (half a year, one year, two or more years), Close future = rest of the period (Expected Actual) and Actual  Budget = Important element of Enterprise control  see previous point  Budget is also about to establish positive and stable conditions for activities (rules, standards, agreements, …)  Budget is also about to searching of the most suitable way, how to provide activities (worker’s skill + training + equipment, activities outsourcing or license, …)

7 Costs and Revenues are only Consequences of Activities and Processes applied  After the targets are given and the set of activities is quite obvious, Costs + Revenues (C + R) can be determined  Also on the contrary: According to targeted size of C + R the changes (or alternatives) of the activities are made (searched)  Feedback (feedback cycle)  C + R are the consequence of the decision-making about the way of activities providing: Purchase, by own means, outsourcing, way of financing, …and other agreements conditions  C + R are the significant result of Activities selection – they link technical and economic process point of view !!! (Do we fix C + R ?? WE has to try it again and again) (see also: Manager’s responsibility)

8 Oper-Budget and Activity Based Management (ABM) Oper-Budget and Activity Based Management (ABM) 1/2 ABM = natural conclusion to managerial philosophy based on Activity as principal building item in Management Control: ABM = natural conclusion to managerial philosophy based on Activity as principal building item in Management Control:  To two basic lines of Enterprise control (Products + Departments) is added the third: = Activities  Activities are, what produce (or support producing) products (and revenues), what is done in the departments and what consume costs  That's why: ACTIVITIES (PROCESSES) has to be controlled  Problem: By detailed decomposition into Activities, they are hundreds, but rather thousands  Laboriousness (to plan, to record, to evaluate them!!)  How effective the result is?  Recommendation: To apply Methodology Activities Set for Product Sets (AS/PS)

9 :  The Entities priority in Enterprise Control is changing : 2/2  Products are primary  Towards Products the Processes, resp. Activities are considered:  Towards Products the Processes, resp. Activities are considered:  ? Which Activities (A) (Processes (P)) are needed (necessary) ?  ? In which scope ? ? How to do them (own or purchased)? etc.  Departments (org. structure) has to be tailored to both previous it tends to flexible org. structure, to flexible modification to A + P  Departments (org. structure) has to be tailored to both previous  it tends to flexible org. structure, to flexible modification to A + P The Role of Activities in Entities:  The Role of Activities in Enterprise Control Entities:  Activities: mostly a part of other Entity (process, dptm., functional area) BUT also an autonomous entity  Processes = relevant and chronological sequence of activities, mostly targeted to some partial or final product  Products: are developed due to activities (processes)  Set of Activities = targeted grouping of Activities for specific Set of Products  Departments = organizational systemization (arrangement) of Resources and Activities  Functional areas (product development, production, purchase, etc.): are realized by Activities

10 Oper-budget creation Oper-budget creation 1/2  Budget is about Activities and Processes  then it has to be of a different form in each Enterprise and created in an different way (and evaluated in another way)  Budget creation: Long-term and multi-circle process. WHY?  Is linked to the Strategy (e.g. by BSC), particularly to the perspective of Internal processes  Objectives + Targets + Process conditions  In large companies: 1. version of annual budget is get ready at the end of 3/201x  Creation is an continuous process: The essential factors are respected  Systematic, no one step process  To respect essential budgetary factors needs time for balancing and argued  It offers time to ensure external partnerships (services, parts, …)  Importance of existence the plan in technical units (pcs, hours, m 3, GJ)  The starting point for budget creationannual business plan  The starting point for budget creation is mostly the agreed annual business plan

11 2/2  Consensus on Budget is required  Cooperation of all staff is necessary  Preparation of agreements on services, deliveries, …is a part of budget creation process. It is necessary for credibility and stability of the budget  Budget 1.step: Balancing of internal services + tariffs  Budget = Basic part of Enterprise motivation system  To set up correctly the consolidation rules  Breakdown into months is necessary (it affect to higher accuracy, it is needed due to monthly evaluation, relationships to Cash-Flow, Costing, …)  Necessity of budget creation procedure description (steps, time schedule, responsibility, …)

12 Oper-budget Evaluation  Regularly and a consistently (monthly) -  Regularly and a consistently (monthly) - in advanced stated date  Managers monitors the budget size continuously during the whole month  Superior manager has to take a part in evaluation (  Decisions are made immediately)  The values of current period and cumulated values are evaluated  Application of Expected Actual Value (EAV) (forecast)  Necessity: To have on disposal supportive recordings (time, capacity, …consumption) and other information  Expected future difficulties are considered, too  Result of evaluation:  Budget confirmation or decisions making about changes (in activities, figures)  EAV

13 Expected Actual Values and Hour Cost Tariffs  Expected Actual Values  = Tool for updating budget (fitting it to contemporary situation)  = Actual value up to this time point + (possibly) update for the rest of period (year)  Rules has to be accepted for EAV application (Budget updating)  Purpose: To control under real (not fictive) conditions and targets  Cost Tariffs (of the centres, activities, …)  They appreciates cost level of activities, processes, …  The link the cost to capacity !!!  The significance is growing, because the price of resources capacity is growing (of equipment, staff, …)  Application for activities evaluation and appreciation (motivation)  Hour Cost Tariffs (HCT) Method  The controlling evaluation of decisive factors influence is on disposal

14 Why the Head Manager has to be responsible for the Budget ?  Because the Budget is about Activities and Processes  :  Who else should be responsible for Activities and Processes and their development ?  Budget is linked with the resources utilization, i.e. with: Staff (workers) (number of them, their activities, skills, salaries) Staff (workers) (number of them, their activities, skills, salaries) Equipment (machines, tools, …) Equipment (machines, tools, …) Process conditions Process conditions Consumed services Consumed services Cooperation internal + external Cooperation internal + external  Because the Budget is about Technical and Financial aspects (Costs + Returns) of processes (activities)

15 Decalogue of budgeting practice 1/2  Budget is firstly about Activities and Processes and then subsequently about C + R  Budget is something like the Company Law  Budget is the control tool of primary importance for all levels of enterprise control hierarchy (from top to down)  Enterprise (master) budget = linked set of budgets  Budget creation = define contents and conditions of activities for the next period  Budget creation = Long-term and multi-circle process: Enough time is necessary for carefully budget preparation

16 2/2  Budget evaluation: Regularly and a consistently  Required: To apply the Expected Actual Values technique  Close relationships to the other information sets in enterprise (Accounting, Costing, Technical recordings (mostly to hour-recordings (!!)), Investment and Financial calculations, and to other control tools (BSC, ABM, Process control, Target costing, …)  Required: Existence and a regular updating of standards linked with budget procedures (budget standards)

17 Costing 1/4  Costing = To allocate in an acceptable way the cost to the cost driver in:  production process  sales process  development process  ……  in an acceptable way ??  accurate is not achievable, BUT mostly it can be done in an acceptable way (accurate: only for direct cost !!) acceptable = trustworthy for managerial use  cost driver ??  one piece or multiplying of pieces  production order  particular activity  business case (order)  … …

18 Costing 2/4  Costing - what are key factors?  cost (cost identification, type of cost: direct, indirect, fixed, variable, …)  cost drivers (identification, which one or which structure of them is used)  allocation / no allocation to cost drivers     or partial allocation  Absorption Costing x Variable costing  capacity (of process, resources, …) utilization  revenues (expected, planned) as starting point for calculation (variable costing)  revenues (expected, planned) as starting point for calculation (  variable costing)  What kind of Costing - (time point of view)?  planned (pre-costing)  operational costing  actual (final) costing  proposal costing (for submit an offer for order)  Target Costing

19 Costing 3/4  Costing - approaches:  Absorption Costing  Variable Costing  Costing - methods and techniques:  Hour cost tariff (HCT) method  Surcharge Costing (= additional cost charges according selected cost driver)  Standard Costing  Activity Based Costing  ….. In practice: combination of different methods and techniques

20 Costing 4/4  Planned Costing (pre-costing): WHY?  For each product or even a its innovation or changes has to be calculated its costs in advance and make comparison with potential price  resp. To design product in such a way, that its total costs will be lower then in advance given COST TARGET (Target Costing), i.e. product will bring required size of CM, resp. size of profit  If TARGET is not kept, the product has to be redesigned with respect to the COST TARGET (cost limit). Otherwise not start the production!  Final (actual) Costing: WHY?  It normally do not influence the agreed price, BUT it is necessarily for:  Assessment of size and METHODOLOGY of planned (PL) Costing (learning)  Reward/not reward due to keeping/not keeping PL-Costing.

21  HCT-Method: Cost-Capacity assessment of the entity Product costing (incl. services) Motivation rewards  Entity (subject) on which the HCT can be applied:  Department or center  Workplace  Machine or Equipment  Activity (  Activity Based Management)  Process (  Process Control)  Worker (research, technician, office, manual, …)   Indirect cost: IC HCT =  i=1..n (HCT i  t i )  Total product cost: TC = DC + IC HCT Hour Cost Tariffs (HCT, HOT) Method Hour Cost Tariffs (HCT, HOT) Method 1/4

22 (1) Basic: (centre, workplace, activity, process, …)  HCT (one value) for entity (subject)(centre, workplace, activity, process, …) Items: (2) Items:  HCT is itemized into more partial Cost-items  Examples:  Depreciations (leasing-payments), Personal-costs, Material-costs, Costs of maintenance, Space-costs, Costs of energy, Other costs To gain information about the size and development of the partial cost items  Purpose of the itemizing: To gain information about the size and development of the partial cost items Vertical (hierarchical): (3) Vertical (hierarchical):  HCT is itemized according to vertical enterprise structure Example: Workplace (machine) - Centre Controlling: (4) Controlling:  The factors causes difference HCT AC - HCT PL are determined  Purpose: To trace the influence of factors on the HCT difference HCT Method - Method’s Alternatives HCT Method - Method’s Alternatives 2/4

23  WHY to apply??  It includes TIME (capacity in time expression, time consumed by …)  It links budgets of IC + Capacity plan (in mutual interaction)  Reasonably stated hour cost of resources (machines, workers) for expected capacity utilization  Indirect Cost (IC), which are mostly time costs, allocate to product according to the cost consumption (NOT according to the Direct Cost!!!)  Easy and trustworthy cost calculation /product by changes of parameters of product or process (e.g.: purchase of new machine)  Easy alternative planned calculations for different capacity utilization  For motivation reward executives + staff  Direct link with Activities (  Activity Based Management) E.g.: Offer very accurate calculation for insourcing or outsourcing of Activities, for cooperation calculations  Direct link with Processes (  Process management)  It is simple, it works with commonly used data  + ……... HCT Method - purpose and application HCT Method - purpose and application 3/4

24 HCT Method - application areas HCT Method - application areas 4/4  HCT-Method applications are in particular contributive in areas as:  All kind of services  Technical activities and dptms. (Development, Project, Pre-production, Programming, etc.)  Production activities and dptms. (if more expensive even for workplaces)  Post-production activities and dptms. (Packaging, dispatching, etc.)  Assessment of cooperation and make / buy projects assessment.  Reason: It interrelated time costs with time expression of resources capacity!! + see Integrative ability and integrative consequences of HCT-Method

Example: Application of Contribution Margin + HCT-Method in Costing structure: Price simulation + Target Costing application (TC) + Price (Revenues)  (utility features, brand, competitive situation,...) - Profit - Sales margin - CM / (for) common overhead (exec., admin., marketing, IT network, …) = Production + Pre-production + Post-production Costs (Direct + Indirect) - CM / product development (HCT) (contribution margin to dptm-cost) - CM / techn. preparation of production, incl. tools, prototypes, … (HCT) - CM / guarantee reparation (part. HCT) - CM / …. …. according to specific situation in enterprise - CM / launching to market (to cover product mktg. costs) = Production + other costs - Another Direct pre-production, production, post-production (e.g. packing) costs = Indirect production costs (HCT) By application of TC, the minimizing of time/unit consumption + maximizing of capacity utilization. Conclusion: By application of TC, the minimizing of time/unit consumption + maximizing of capacity utilization.

26 Final Conclusions to Cost Control  If you want to effect Costs, you has to effect on Activities  the Cost Control = requires to control Activities  (1)Which Activities (lean point of view) are really needed to be applied to produce PRODUCTS + necessary to support key processes needed for producing products (2)Activities:  In which way to realize the Activities which kind of Activities (to substitute ACT with other kind of ACT?) which kind of Activities (to substitute ACT with other kind of ACT?) make or buy make or buy or in cooperation (mix of make + buy) or in cooperation (mix of make + buy)  Under which conditions  In which scope  ABC = Activity Based Costing (!!! but what does it mean actually?)