CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.

Slides:



Advertisements
Similar presentations
Orthogonal Projection
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Optical Manufacturing Solutions 1 Probe Assembly.
James Richmond09/09/20101 CLIC Permanent Magnet Quadrupole - Proposed Mechanism Prepared by James Richmond Presented by Norbert Collomb STFC Daresbury.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Chapter 27: Workholding Devices for Machine Tools
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
CLIC Permanent Magnet Quadrupole Engineering Development Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 2/07/2010.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Industrial Challenges of Compact Magnet Production N. Collomb 27/11/ Norbert Collomb, STFC J. Clarke, B. Shepherd, N. Marks, STFC-ASTeC M. Modena,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
MICE Radiation Shield Installation 1 18 th October2012 Summary of initial test N. Collomb.
Bridge Modules BKK and BKR
MICE – Moving Platform Engineering solution –A proposal 16/02/2011Norbert Collomb1.
MICE Target Mechanical Design l Jason Tarrant – STFC »Working on upgrade of Target Mechanics l Contents »Main features of upgrade design »Progress & schedule.
LINEAR MEASUREMENT.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Nelson Research, Inc – N. 88 th St. Seattle, WA USA aol.com Design Concept for a Transducer Holding System Suitable.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 13/09/2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Assembly Modeling Constraints ENGR 1182 SolidWorks 05.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Drive Beam Quadrupoles Jim Clarke, Norbert Collomb, Ben Shepherd, Graham Stokes STFC Daresbury Laboratory, UK Antonio Bartalesi, Michele Modena, and Mike.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
CLIC Permanent Magnet Dipole Feasibility Proposal
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
STEP 1: ASSEMBLE ANGLE PLATES
Fits and Tolerances: Linear and Geometry.
George Mahler, Steven Trabocchi, J. Tuozzolo, Stephen Brooks
Guide Right™ Surgical Guide System
Steering Systems Topics covered in this presentation:
TEST MODULE WG Cradles for CLIC module supporting system
Mechanical Design Review February 25, 2008 Université de Montréal
LARP Phase II Secondary Collimator RC1
F.E.T.S. Mechanical Engineering Update
Assembly Modeling Constraints
Alex Bainbridge1, Ben shepherd1, Jim Clarke1,
CLIC PMQ High-strength prototype
STEP 1: ASSEMBLE ANGLE PLATES
10th Feb 2017, CLIC Implementation Meeting
Assembly Modeling Constraints
McMaster linear bearing #6709K180 with guide rail suppressed
Cryomodule Assembly Plan
Presentation transcript:

CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1

Presentation Topics Integration issues from previous iteration Design revision and envelope check Development comparison and dimensional changes Assembly Sequence considerations Future plans Corrector Feature N. Collomb2

Integration issues N. Collomb3 Motor posed an issue

Integration issues N. Collomb4 Mechanism clash with Flange and Vessel Interference clash with girder Gearbox bracket interfering with vacuum pump

Integration issues CAD-QA showed clashes in integration model –Motor and Flange –Mechanism and vacuum vessel –Gearbox bracket and vacuum pump –Mechanism brackets on ‘front’ and girder –Height and girder interface Magnet aperture was larger than specified BPM coupled to magnet Shimmed vacuum vessel prevented correction in vertical and horizontal plane. N. Collomb5

Revision of mechanical design Reduction in width to prevent clashes Remodelling with respect to magnetic design update Correction of aperture Review of components due to forces change and clashes Assembly process instigation and design implications Interface with girder consideration Correction features N. Collomb6

Envelope check N. Collomb7 Placed box on girder. Box: 391x391x270mm No interference Interference No interference, just

Current Development N. Collomb8 Major changes: 1.Motor moved to top (vertical) 2.T-Gearbox different 3.Side-plate with rails continuous 4.Core – faceplate redesigned 5.Yoke Assembly redesigned 6.Cap – faceplate size reduction 7.Ball-screw nut bracket shallower and 1 piece Previous schematic

Dimensions (figures in brackets from previous schematic) N. Collomb mm (438.5) mm (368.5) 850 mm (654) 388 mm (385) 270 mm (262) 230 mm magnet Aperture Ø70 mm 260 mm Nosepole aperture: Ø28 mm

Assembly Sequence Initial strength calculations indicate feasibility of design is OK. Discussion with manufacturers about sub- assemblies in progress – influences assembly sequence. Design broken down into 5 key stages –Magnet core –Core –Linear motion system –Motor and Gearbox –Final Assembly N. Collomb10

Assembly Sequence – Magnet Core N. Collomb11 Supplier provides assembly: Permanent Magnet Magnetic steel plateAlu Strap: tensions Strap and supports PM Strap plate to prevent mechanical failure Magnetic steel centre

Assembly Sequence - Core N. Collomb12 Magnet Core (ref)Magnetic steel Yoke Alu Core support (doweled) Face - plates Core can be split into ‘Top’ and ‘Bottom’ halves. Face – plates maintain horizontal positioning, Core supports maintain vertical positioning to ensure inscribed nose-pole radius is accurate. Magnet Cores (top removed for clarity) serve as reference.

Assembly Sequence – Linear Motion System N. Collomb13 Ball-screw nut bracket Adjustable Ball-screw Support bearings Side Mounting Plate Ball-screw nut Linear Motion Rails Linear Motion Runners 22 mm Could reduce magnet overall- width by 20x2 mm at cost of backlash couplings.

Assembly Sequence – Motor & Gearbox N. Collomb14 T- Gearbox ratio 2:1 Brackets can be combined into one piece, still permitting alignment. 400 step/rev Stepper motor, 1.8° accuracy Right Angle Gearbox ratio 25:1 Backlash coupling

Assembly Sequence – Top Level N. Collomb15 Core Magnet Assembly and Core brought together in controlled manner in jig. Dowelled and secured. Step1 is to fasten Side- plate Assembly to Centre Assembly. Secured only. Step 2 is to fasten Face- plates. Align and adjust as required. (D.o.F.) Dowelled and secured.

Assembly Sequence – Top Level N. Collomb16 Backlash Coupling and Gearbox bracket pre- assembly. Secured only Motor and Gearbox assembly lowered onto ball screw ends align and secure before pre-tensioning. Dowelling. Motor conditioning. Single gearbox assembly bracket in progress.

Assembly effects for manufacturing Outsourcing certain sub-assembly advantages are the expertise and infrastructure manufacturers possess. Collaboration with manufacturers has started (hypothetical mass production discussions). Some components can be eliminated by incorporating their function into one part. Splitting the magnet is still possible to insert the vacuum chamber during installation – however I propose to include the vacuum chamber during initial assembly. N. Collomb17

Revision of future plans Revise time of deliverables –FEA and optimisation (partially complete) – Jan11 –Design evaluation (in progress) - Dec 10 –Assembly plan (in progress) – Dec 10 –Integration (model send to Dimitry) – Nov 10 –Design and development of corrector – Jan 11 –Costing and procurement – Feb 11 –Prototyping – June/July 11 –Assembly/Testing – July/Aug 11 N. Collomb18

Corrector feature Integration illustrations indicate that this feature must be located on the side on the girder magnet interface. It MUST NOT add height other than what is required Aperture permits a ±1.4 mm vertical or horizontal movement (Magnet aperture Ø28 mm and Vacuum vessel O.D. 26 mm) Requirement for movement ±0.5 mm means we can reduce the magnet aperture to Ø27 mm (±0.7mm achievable). N. Collomb19

Corrector feature Interface between magnet and girder not designed yet. Design to commence once integration has cleared magnet envelope. Questions: –Can the girder be modified in terms of additional holes for instance? –Do other components occupy space below reference surface adjacent to magnet? –Is the girder hollow and if so can we mount items from underneath? –Can you supply a model of the girder (blank)? N. Collomb20

Summary We are closing in on a feasible design. Provided the integration shows the magnet can fit in the space allocated on the module, then a prototype can be started to be procured in February Manufacturers are keen and provide advice and guidance in terms of cost – functionality. Accuracy, repeatability and precision can be achieved to meet specification. Time plan has slipped slightly with prototypes still available for third quarter James Richmond continues on project as part of his University degree. N. Collomb21

Questions? N. Collomb22