08-11 Oct 200729th EWGLAM, Dubrovnik1 Activities & Plans 2007 Dijana Klaric Met service of Croatia RC LACE Project Leader.

Slides:



Advertisements
Similar presentations
ALARO-0 at ZAMG Experiences, verification, identified problems, ….
Advertisements

Assimilation of radar data - research plan
Documentation on ALARO Description of namelist variables and their meaning/tuning Content – very basic information on scheme – description of namelist.
Hirlam Physics Developments Sander Tijm Hirlam Project leader for physics.
GardeGarde Parameterization and physico-dynamical interface developments for the LAM ALADIN and CSRM AROME Jean-Marcel Piriou, Météo-France. EWGLAM / SRNWP.
28th EWGLAM meeting, Zurich, October 2006 ALARO Physics developments at LACE Neva Pristov LACE Working group for physisc.
1 October 26, th COPS Workshop, Cambridge, UK COPS (Convective and Orographically-induced Precipitation Study) Goal: Advance the quality of forecasts.
MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss.
Common HIRLAM and ALADIN-M/F physics plan (08/05) J-F Geleyn, B. Hansen-Sass, G. Hello & L. Rontu Oslo mini-workshop Mesoscale physics and diagnostic tools.
Activity of SMHI (Swedish Meteorological and Hydrological Institute) Presentation for CARPE DIEM kick-off meeting, DLR-GERMANY, January Contact.
LAMEPS Development and Plan of ALADIN-LACE Yong Wang et al. Speaker: Harald Seidl ZAMG, Austria Thanks: Météo France, LACE, NCEP.
Francesca Marcucci, Lucio Torrisi with the contribution of Valeria Montesarchio, ISMAR-CNR CNMCA, National Meteorological Center,Italy First experiments.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
GardeGarde Designing unified convection parameterizations: two proposals related to equation sets and entrainment. Jean-Marcel Piriou, Météo-France. GCSS.
SRNWP workshop - Bologne Short range ensemble forecasting at Météo-France status and plans J. Nicolau, Météo-France.
HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik,
NWP in Croatian Meteorological and Hydrological Service In the Croatian meteorological service ALADIN is operationally run twice a day, for 00 and 12 UTC.
Numerical simulations of the severe rainfall in Pula, Croatia, on 25 th September 2010 Antonio Stanešić, Stjepan Ivatek-Šahdan, Martina Tudor and Dunja.
Prague'03 / Physics & its interfacing Physics & its interfacing – the AROME case J.-F. Geleyn & L. Gérard I) Generalities II) Challenges & likely problems.
29th EWGLAM meeting, Dubrovnik, October 2007 ALARO Physics developments Neva Pristov LACE Working group for physics.
SMHI in the Arctic Lars Axell Oceanographic Research Unit Swedish Meteorological and Hydrological Institute.
18-21 Sept 20079th COSMO meeting, Athens1 Activities & Plans 2007 Dijana Klaric Met service of Croatia RC LACE Project Leader.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
Meso-γ 3D-Var Assimilation of Surface measurements : Impact on short-range high-resolution simulations Geneviève Jaubert, Ludovic Auger, Nathalie Colombon,
Data assimilation and observing systems strategies Pierre Gauthier Data Assimilation and Satellite Meteorology Division Meteorological Service of Canada.
ALADIN/AROME workshop Preliminary conclusions of the joint meeting of CSSI and LSMG April, 2003, Prague1 JOINT MEETING OF CSSI and LSMG JOINT MEETING.
ALADIN A transition year EWGLAM/SRNWP, Dubrovnik, 8/10/07.
29th EWGLAM Meeting HIRLAM-A Verification Xiaohua Yang with contributions from Kees Kok, Sami Niemela, Sander Tijm, Bent Sass, Niels W. Nilsen, Flemming.
Prague' 03 - Convergence1 Convergence between the ALADIN and AROME projects: opportunity and challenges I)Motivation II)Issues III)Partnerships IV)New.
Météo-France / CNRM – T. Bergot 1) Introduction 2) The methodology of the inter-comparison 3) Phase 1 : cases study Inter-comparison of numerical models.
Norwegian Meteorological Institute met.no GLAMEPS: GLAMEPS GLAMEPS: Grand Limited Area Model Ensemble Prediction System Overview of activities EWGLAM –
RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana1.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1.
26 th EWGLAM & 11 th SRNWP meetings, Oslo, Norway, 4 th - 7 th October 2004 Stjepan Ivatek-Šahdan RC LACE Data Manager Croatian Meteorological and Hydrological.
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Operational ALADIN forecast in Croatian Meteorological and Hydrological Service 26th EWGLAM & 11th SRNWP meetings 4th - 7th October 2004,Oslo, Norway Zoran.
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
Update on model developments: Meteo-France NWP models Update on model developments: Meteo-France NWP models CLOUDNET Workshop / Paris 4-5 April 2005 Jean-Marcel.
EWGLAM Oct Some recent developments in the ECMWF model Mariano Hortal ECMWF Thanks to: A. Beljars (physics), E. Holm (humidity analysis)
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
ALADIN & LACE recent and ongoing Development on LAMEPS Yong Wang ZAMG, Austria With contribution from Bellus, Hagel, Horanyi, Ivatek-Sahdan, Kann, Kertesz,
Page 1© Crown copyright 2004 SRNWP Lead Centre Report on Data Assimilation 2005 for EWGLAM/SRNWP Annual Meeting October 2005, Ljubljana, Slovenia.
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
14 th ALADIN WS, Innsbruck, 1-4 June, 2004 RC LACE Project member of ALADIN2 project.
ALADIN 3DVAR at the Hungarian Meteorological Service 1 _____________________________________________________________________________________ 27th EWGLAM.
OSEs with HIRLAM and HARMONIE for EUCOS Nils Gustafsson, SMHI Sigurdur Thorsteinsson, IMO John de Vries, KNMI Roger Randriamampianina, met.no.
Highlights of recent HIRLAM activities Jeanette Onvlee ASM/Workshop
Numerical simulations of the severe rainfall in Pula, Croatia, on 25 th September 2010 Antonio Stanešić, Stjepan Ivatek-Šahdan, Martina Tudor and Dunja.
Soil analysis scheme for AROME within SURFEX
Recent data assimilation activities at the Hungarian Meteorological Service Gergely Bölöni, Edit Adamcsek, Alena Trojáková, László Szabó ALADIN WS /
Responsible member: Hungarian Meteorological Service Period:
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
met.no – SMHI experiences with ALARO
Physics developments in ALADIN: towards higher resolution
HIRLAM mesoscale report
Highlights of activities
On the role of entrainment at the grey zone scales
Meteorological and Hydrological Service of Croatia
Recent changes in the ALADIN operational suite
Status of SREPS - Sept Full two runs a day from April 2006.
Operational Aladin-Belgium
Short Term forecasts along the GCSS Pacific Cross-section: Evaluating new Parameterizations in the Community Atmospheric Model Cécile Hannay, Dave Williamson,
42h forecast HIRLAM 50km 24h accumulated precipitation.
SRNWP-PEPS COSMO General Meeting September 2005
Activities WG-MWFR Help set up/involvement in RDP’s/FDP’s (COPS, Sochi, HYMEX, …) Push mesoscale research cooperation / proposals on: Mesoscale modelling.
NWP activities in Austria in 2006/2007 Y. Wang
Presentation transcript:

08-11 Oct th EWGLAM, Dubrovnik1 Activities & Plans 2007 Dijana Klaric Met service of Croatia RC LACE Project Leader

08-11 Oct th EWGLAM, Dubrovnik2 RC LACE report Environment &  R&D highlights Operations and Common actions From Evaluation 2 Future

08-11 Oct th EWGLAM, Dubrovnik3 Regional Cooperation environment Members: Au-Cr-Cz-Hu- Ro -Si-Sk Co-operation: R&D on meso-scale NWP Operations Common actions RC LACE MoU RC LACE Budget  7 NWP teams  LACE MG Project Leader, 4 Working Group Leaders, ALADIN SC, Data Manager ALADIN partners HIRLAM SRNWP

08-11 Oct th EWGLAM, Dubrovnik4 2006/2007 ALADIN-LACE-HIRLAM actions ALARO training at Radostovice, March participants -all LACE Members (+ MF, Be, PT, Mc + Denmark) ALADIN-HIRLAM LAM-EPS WS (November 2006, Vienna)  GLAMEPS Project at ECMWF SRNWP WS on Numerical tech. ( December 2006, Zagreb) ALADIN-HIRLAM coordination on SURFACE and DA issues (SURFEX WS, SRNWP WS on DA) ALADIN-HIRLAM general WS at Oslo April 2007 ALADIN-HIRLAM general WS at Oslo April 2007  Surface Assimilation (CANARI) WS at Budapest, Nov 2007

08-11 Oct th EWGLAM, Dubrovnik5 R&D overview LACE Scientific Plans 2006; 2007 Ä main input for ALADIN Scientific plans Ä IFS environment: Arpege( Global ) -Aladin(Alaro 10km ) -Arome ( 2.5km ) Ä 4 R&D working groups: Dynamics, Physics, Data Assimilation, Predictability Ä 40 scientists: 7 NWP teams + visitors Ä person x month funds /year 2007

08-11 Oct th EWGLAM, Dubrovnik6 Physics (10km->5km) ALARO  ALARO-0, step 1 (system) Equations and interface (loss of mass due to precipitation is considered ) ; Prognostic cloud water (microphysics 5 water species); Radiation –NER formulation; Turbulence (pseudo- prognostic TKE scheme); Cloudiness issue (improved optical properties, new saturation cloud model)  ALARO-0, step 2 (multi-scale, “grey-zone”) Sub-grib scale convection - 3MT Microphysics and Transport for SGS convection 3MT - Microphysics and Transport for SGS convection +Multiscale +Modular =3MT

08-11 Oct th EWGLAM, Dubrovnik7 ALARO Diagnostics Ä Model consistency and performance (ALARO: more memory, less CPU – better optimized) Ä DDH tool for diagnostic (IFS basic, AAA developed) Ä Model comparison ALARO vs ALADIN Physics Ä ALARO –v0: operative at CZ, A, Be,..... (new ALADIN)

08-11 Oct th EWGLAM, Dubrovnik8 ALARO plans 2007-> Ä Governing equations: extension to compressible case (NH) Ä Pseudo-prognostic TKE-scheme: new mixing length formulation; an 'analytical' CBR interpretation within p-TKE Ä Radiation: modularization,better aerosol model Ä 3MT: validation and tuning, sensitivity to mid- troposphere humidity, test of convection diurnal cycle, triggering of convection (Team; JF Geleyn, JM Piriou, B Catry, L Gerard, R Brozkova, N Pristov, D Banciu,M Tudor, F Vana, J Masek, J Cedilnik......)

08-11 Oct th EWGLAM, Dubrovnik9 ALARO-0 Project- Overview of R&D pxm onetworking part only (fresh funds) owithout home R&D, phasing and coordination efforts Year ALADIN-2LACEM FCHMIFlat-RateFR/LACETotal Total5 pxm 18 pxm 7 pxm 7 pxm 7 pxm 1.5 pxm 45.5 pxm

08-11 Oct th EWGLAM, Dubrovnik10 R&Dstatus  Results NH ALADIN Dynamics 3D VAR DA (10km) Multi scale physics Meso-scale EPS  Operations (06/07) ALARO 10kn physics LAEF  Desires  NH ALADIN -VFE  Coupling  4D-VAR, Surface  SURFEX  GLAMEPS (+)

08-11 Oct th EWGLAM, Dubrovnik11 GLAMEPS_v0 - test phase HIRLAM -66? members  ECMWF targeted singular vectors (TEPS)  OT - 24h -3 TEPS domains - 2 HIRLAM physics - ( 10 memx2 mod x3domains) ALADIN – 22 members  Downscaling of ECMWF EPS 22km/44km ALADIN  lat/lon post-proc. (INM sys)  Next step: ALADIN native singular vectors (tests) (OT =+12h, +24h)

08-11 Oct th EWGLAM, Dubrovnik12 Products  ALADIN deterministic 7 ALADIN models + Global ÄVerification package ÄALADIN Multi-grams ALADIN pEPS  LAEF products Downscaling of ECMWF EPS (16+cont, 18 km) -EPS grams -Probability charts -Stamps Planned: -Multi-physics -Blending

08-11 Oct th EWGLAM, Dubrovnik13 FDP MAP D-Phase MAP D-phase Demonstration Project (June-Nov 2007) - Probabilistic hydrological and meteorological simulations for heavy rains and flood events - Contribution of LACE via Austrian team - ALADIN/Austria for deterministic products (ALARO phy) (∆x= 9.6km, 45 levels, dyn. adaptation) - ALADIN LAEF probability products (24h precipitation) (∆x= 18km, 37 levels, 16 mem +contr. from ECMWF EPS) - Disseminated to MAP D-Phase center

08-11 Oct th EWGLAM, Dubrovnik14 RC LACE Monitoring of Observation Network Non-GTS SYNOP DA ÄALADIN /HU 3D VAR DA ÄImpact Study ÄData: SYNOP, TEMP, AIREP,AMV,Wind pr, AMSU AB Ä SYNOP Observation distribution ÄNeutral impact  CANARI OI for surface assim.  LACE Data manager

08-11 Oct th EWGLAM, Dubrovnik15 LACE Evaluation Project Evaluation after 10 year activities ( ) - To give independent advices about future development  Recommendations To overcome the duplication of the operational efforts To suppress draining of resources on maintaining and downstream applications. To provide small NWP centers with a complete NWP system.  Stronger governance: more working hours for LACE MG  TASK Sharing via Lead Centers: Operations and research

08-11 Oct th EWGLAM, Dubrovnik16 LACE Future > Action Plan for implementation of (Working Group)  Political decision for the closer operative cooperation (toward the Projects with operative deliverables)  Leading centers => Responsible center  Bottom-up => Top-down planning   Projects (priority list, deliverables, Responsible center)  New Management Group: PM, 4AL, ASC, DA  LACE MoU III ( )  LACE 10-years strategy

08-11 Oct th EWGLAM, Dubrovnik17