08-11 Oct th EWGLAM, Dubrovnik1 Activities & Plans 2007 Dijana Klaric Met service of Croatia RC LACE Project Leader
08-11 Oct th EWGLAM, Dubrovnik2 RC LACE report Environment & R&D highlights Operations and Common actions From Evaluation 2 Future
08-11 Oct th EWGLAM, Dubrovnik3 Regional Cooperation environment Members: Au-Cr-Cz-Hu- Ro -Si-Sk Co-operation: R&D on meso-scale NWP Operations Common actions RC LACE MoU RC LACE Budget 7 NWP teams LACE MG Project Leader, 4 Working Group Leaders, ALADIN SC, Data Manager ALADIN partners HIRLAM SRNWP
08-11 Oct th EWGLAM, Dubrovnik4 2006/2007 ALADIN-LACE-HIRLAM actions ALARO training at Radostovice, March participants -all LACE Members (+ MF, Be, PT, Mc + Denmark) ALADIN-HIRLAM LAM-EPS WS (November 2006, Vienna) GLAMEPS Project at ECMWF SRNWP WS on Numerical tech. ( December 2006, Zagreb) ALADIN-HIRLAM coordination on SURFACE and DA issues (SURFEX WS, SRNWP WS on DA) ALADIN-HIRLAM general WS at Oslo April 2007 ALADIN-HIRLAM general WS at Oslo April 2007 Surface Assimilation (CANARI) WS at Budapest, Nov 2007
08-11 Oct th EWGLAM, Dubrovnik5 R&D overview LACE Scientific Plans 2006; 2007 Ä main input for ALADIN Scientific plans Ä IFS environment: Arpege( Global ) -Aladin(Alaro 10km ) -Arome ( 2.5km ) Ä 4 R&D working groups: Dynamics, Physics, Data Assimilation, Predictability Ä 40 scientists: 7 NWP teams + visitors Ä person x month funds /year 2007
08-11 Oct th EWGLAM, Dubrovnik6 Physics (10km->5km) ALARO ALARO-0, step 1 (system) Equations and interface (loss of mass due to precipitation is considered ) ; Prognostic cloud water (microphysics 5 water species); Radiation –NER formulation; Turbulence (pseudo- prognostic TKE scheme); Cloudiness issue (improved optical properties, new saturation cloud model) ALARO-0, step 2 (multi-scale, “grey-zone”) Sub-grib scale convection - 3MT Microphysics and Transport for SGS convection 3MT - Microphysics and Transport for SGS convection +Multiscale +Modular =3MT
08-11 Oct th EWGLAM, Dubrovnik7 ALARO Diagnostics Ä Model consistency and performance (ALARO: more memory, less CPU – better optimized) Ä DDH tool for diagnostic (IFS basic, AAA developed) Ä Model comparison ALARO vs ALADIN Physics Ä ALARO –v0: operative at CZ, A, Be,..... (new ALADIN)
08-11 Oct th EWGLAM, Dubrovnik8 ALARO plans 2007-> Ä Governing equations: extension to compressible case (NH) Ä Pseudo-prognostic TKE-scheme: new mixing length formulation; an 'analytical' CBR interpretation within p-TKE Ä Radiation: modularization,better aerosol model Ä 3MT: validation and tuning, sensitivity to mid- troposphere humidity, test of convection diurnal cycle, triggering of convection (Team; JF Geleyn, JM Piriou, B Catry, L Gerard, R Brozkova, N Pristov, D Banciu,M Tudor, F Vana, J Masek, J Cedilnik......)
08-11 Oct th EWGLAM, Dubrovnik9 ALARO-0 Project- Overview of R&D pxm onetworking part only (fresh funds) owithout home R&D, phasing and coordination efforts Year ALADIN-2LACEM FCHMIFlat-RateFR/LACETotal Total5 pxm 18 pxm 7 pxm 7 pxm 7 pxm 1.5 pxm 45.5 pxm
08-11 Oct th EWGLAM, Dubrovnik10 R&Dstatus Results NH ALADIN Dynamics 3D VAR DA (10km) Multi scale physics Meso-scale EPS Operations (06/07) ALARO 10kn physics LAEF Desires NH ALADIN -VFE Coupling 4D-VAR, Surface SURFEX GLAMEPS (+)
08-11 Oct th EWGLAM, Dubrovnik11 GLAMEPS_v0 - test phase HIRLAM -66? members ECMWF targeted singular vectors (TEPS) OT - 24h -3 TEPS domains - 2 HIRLAM physics - ( 10 memx2 mod x3domains) ALADIN – 22 members Downscaling of ECMWF EPS 22km/44km ALADIN lat/lon post-proc. (INM sys) Next step: ALADIN native singular vectors (tests) (OT =+12h, +24h)
08-11 Oct th EWGLAM, Dubrovnik12 Products ALADIN deterministic 7 ALADIN models + Global ÄVerification package ÄALADIN Multi-grams ALADIN pEPS LAEF products Downscaling of ECMWF EPS (16+cont, 18 km) -EPS grams -Probability charts -Stamps Planned: -Multi-physics -Blending
08-11 Oct th EWGLAM, Dubrovnik13 FDP MAP D-Phase MAP D-phase Demonstration Project (June-Nov 2007) - Probabilistic hydrological and meteorological simulations for heavy rains and flood events - Contribution of LACE via Austrian team - ALADIN/Austria for deterministic products (ALARO phy) (∆x= 9.6km, 45 levels, dyn. adaptation) - ALADIN LAEF probability products (24h precipitation) (∆x= 18km, 37 levels, 16 mem +contr. from ECMWF EPS) - Disseminated to MAP D-Phase center
08-11 Oct th EWGLAM, Dubrovnik14 RC LACE Monitoring of Observation Network Non-GTS SYNOP DA ÄALADIN /HU 3D VAR DA ÄImpact Study ÄData: SYNOP, TEMP, AIREP,AMV,Wind pr, AMSU AB Ä SYNOP Observation distribution ÄNeutral impact CANARI OI for surface assim. LACE Data manager
08-11 Oct th EWGLAM, Dubrovnik15 LACE Evaluation Project Evaluation after 10 year activities ( ) - To give independent advices about future development Recommendations To overcome the duplication of the operational efforts To suppress draining of resources on maintaining and downstream applications. To provide small NWP centers with a complete NWP system. Stronger governance: more working hours for LACE MG TASK Sharing via Lead Centers: Operations and research
08-11 Oct th EWGLAM, Dubrovnik16 LACE Future > Action Plan for implementation of (Working Group) Political decision for the closer operative cooperation (toward the Projects with operative deliverables) Leading centers => Responsible center Bottom-up => Top-down planning Projects (priority list, deliverables, Responsible center) New Management Group: PM, 4AL, ASC, DA LACE MoU III ( ) LACE 10-years strategy
08-11 Oct th EWGLAM, Dubrovnik17