INSPECTION AND RECORDS Abstract from LWR Manual. SHEDULE OF INSPECTION OF LWR / CWR  By SE / SSE Every fortnight during the two coldest and two hottest.

Slides:



Advertisements
Similar presentations
Pattern Rafters & Calculations Gable & Hipped Roof M.S.Martin Nov. 2005, Revised Feb
Advertisements

Algebra 1 Mini-Lessons MA.912.A.2.4: Determine the domain and range of a relation.
Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities.
Access BDD Survey School
Manufacture and Testing of a Large Zirconium Clad Vessel David Clift, P.Eng. Production Manager Ellett Industries September 14, 2005.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Interest Rates Comparing the Interest Rates of Australia’s Major Banks.
Design of Machine Elements
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Components for the low- maintenance switch Components for the low maintenance track Schwihag RBH system.
WALL FRAMING Section 6 of AS 1684 relates to the regulations governing timber wall construction.
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Chapter 12 Maximum Deflection in Bridges. The elastic deflections of girders due to L.L. (without dynamic effect) shouldn’t exceed:- Category Max allowable.
ADA certifiable and Universal Design
ENGR 220 Section 4.6. Thermal Stress Pillow Block Bearings.
Effects of Thermal Energy Name: ________________ Class: _________________ Index: ________________.
For the benefit of business and people
f has a saddle point at (1,1) 2.f has a local minimum at.
Learning Objective: To investigate the maths to do with parachutes.
World Archery Judges’ Training Aid – May VENUE & FIELD LAYOUT.
COMPARATORS Introduction:
MINIMUM ACCEPTABLE LEVELS OF SAFETY & RELIABILITY
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT 1 How to draw a climate graph By the end of today’s lesson you will:  know how to draw a climate.
In this section, we will investigate some graphical relationships between a function and its second derivative.
Maintenance of LWR/CWR
REVIEW OF CRITERIA FOR REALIGNMENT OF A CURVE
Climate Graphs 20to%20draw%20a%20climate%20graph%20PP.ppt.
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
 open space, away from trees and buildings, in the middle of a field so readings are not affected by shelter they provide  above grass not above concrete;
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Woodwork Joints Introduction This unit will introduce various woodworking joints. You will be asked to manufacture some commonly used joints. Assessment.
INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1.
Reading and Constructing
Climatic regions of the world Equatorial rainforests are located along the Equator. Temp Precip Climate graphs show us what the average weather for a place.
DEVELOPMENT OF SURFACES Part I Prof.T.JEYAPOOVAN Department of Mechanical Engineering Hindustan Institute of Technology and Science Chennai , India.
SECTIONS OF SOLIDS Part II
DENSO Supplier Labeling Policy
USFD BZA USFD BOOKLET.
Electromagnetic Blood Flow Meters Measures instantaneous pulsatile flow of blood Works based on the principle of electromagnetic induction The voltage.
Unit IV Ultrasonic examination of welds Foreword.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Beam dynamics and linac optics studies for medical proton accelerators
The reading is 7.38 mm. The reading is 7.72 mm.
Common deficiencies Administration Group (Accounts & Audit offices)
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
Overview Role and function of the Authority
Divisional Engineer/East/Ranchi South Eastern Railway
Chapter 7 Visual Aids for Denoting Restricted Use Areas
Investigation of Road Project By S.N. Nanaware
Regular Geometry Shapes
Investigation of Road Project
USFD VIJAYAWADA DIVISION.
USFD.
ALOSNO IN HUELVA - SPAIN
Engineering Graphics - Lect 6
Start program Start Start Time Duration Counter.
ULTRASONIC TESTING OF RAIL
Engineering Project Cable Management.
WEAR OF RAILS.
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
Reading and Constructing
تأثير درجة الحرارة على الكائنات الحية الدقيقة
Chapter 7 Visual Aids for Denoting Restricted Use Areas
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
SECTIONS OF SOLIDS Part I
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Presentation transcript:

INSPECTION AND RECORDS Abstract from LWR Manual

SHEDULE OF INSPECTION OF LWR / CWR  By SE / SSE Every fortnight during the two coldest and two hottest months of the year at about minimum and maximum temperatures alternately by SSE and SE / JE Alternately once in two months during other months of the year

RECORDS Record of LWR/CWR, as per the proforma laid down, shall be maintained by SSE in a permanent register called the sectional LWR/CWR Register. The SSE shall be responsible for keeping this register up-to-date. Annexure – XIAnnexure – XII Annexure – XIII AAnnexure – XII B

Thanks

 Para – The gap between the reference mark and tongue rail tip/stock rail corner at various rail temperatures shall not differ by more than +/- 10 mm from the theoretical range as shown in Annexure- v  Para Where fishplated or SWP track is joined one side of SEJ, The gap between the reference mark and tongue rail tip/stock rail corner at various rail temperatures shall not differ by more than +/- 10 mm from the theoretical range as shown in Annexure- v

Reference Marks  Para 5.9 – Reference marks shall be fixed at each SEJ and at the centre of LWR/CWR, on the reference pillars erected for this purpose. Additional reference marks in fixed portion and breathing length may be provided to know the behavior of LWR/CWR

Para – When creep in fixed portion of LWR/CWR exceed 20 mm, full investigation shall be carried out and remedial measures undertaken