1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.

Slides:



Advertisements
Similar presentations
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Advertisements

Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
June 23, 2011 Southwestern Illinois Council of Mayors.
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATION 19 OCTOBER 2010.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
October 17, 2011 League of Women Voters of Collinsville.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Project Scope Hire Consulting Firm to perform following:
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Chapter 11 Application for Present-Use Value 1. Application for PUV The present-use value program is a voluntary program that provides the owner with.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Managing property losses, from the first report of a loss until the completed Certificate of Occupancy and final payment to our client (insured). Professional.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
1 Three Rivers Levee Improvement Authority April 21, 2006 Presentation to the State Reclamation Board Regarding Satisfaction of Permit Special Condition.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
DI Martina Hoffmann FHWien University of Applied Sciences of WKW Institute for Real Estate Management.
Planning and Community Development Department Housing Element City Council February 03, 2014.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Drakes Estero Point Reyes National Seashore. History of DBOC permit violations In February 2012, the California Coastal Commission advised DBOC that.
Noncompliance and Correction (OSEP Memo 09-02) June 2012.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
Yuba County Comprehensive Flood Protection Program
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
Case Study 1: Thirty Seven Acre Reservoir Project Paul Keiran – R1 Course Overview Introduction and Inspector Qualifications Pre-Inspection Preparation.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
Fairfax County ParkwayJuly 2011TRB Workshop CERCLA 120(h) CERCLA §120(h) imposes several requirements on all transfers of federal real property to non-federal.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
permitting.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
HIPAA Training Workshop #3 Individual Rights Kaye L. Rankin Rankin Healthcare Consultants, Inc.
Northwest Area Mobility Study FasTracks Monitoring Committee
Big French Creek Slide Timeline of Events
Feather River West Levee Project Project Area C May 24, 2013
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
INDOT Storm Water Management
US Army Corps of Engineers Civil Works Audit: Journey to an Opinion Briefing for: ASMC PDI National Capital Region March 6, 2008.
Sacramento Environmental Commission January 2019.
Presentation transcript:

1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007

2 Issue #1 CLAIM: February 26th meeting constituted a violation of the Bagley-Keene Act. RESPONSE: This is an issue that has been referred to Reclamation Board Staff Counsel. Three Rivers is not the appropriate entity to provide a response to this claim.

3 Issue #2 CLAIM: Three Rivers has worked on the Yuba River Levees beyond the authorized time contained within the relevant encroachment permit. RESPONSE: During 2006/07 winter Three Rivers worked on the Yuba levees between Hwy 70 and Simpson Lane under Permit #18095GM and Permit #17921GM. Three Rivers also performed O&M work on the levee in 2006.

4 Permit Seepage Berm Y u b a R i v e r F l o o d w a y CALTRANS Maintenance Yard Southern Pacific Railroad P r o j e c t L e v e e

5 Permit Slurry Wall Slope 3:1 Y u b a R i v e r F l o o d w a y P r o j e c t L e v e e Seepage Berm S P R R

6 Issue #2 (continued) Work under 18095GM between UPRR and Simpson Lane included the following: ActivityStart DateCompletion Date Slurry Wall September 14, 2006October 22, 2006 Re-grade slope on water side to 3:1October 1, 2006October 26, 2006 Install seepage Cemex property – Time extension granted to work until February 9, 2007 January 26, 2006February 2, 2006 Install two monitoring Cemex property by seepage berm – Time extension granted to work until February 9, 2007 January 31, 2007February 1, 2007

7 Issue #2 (continued) Work under GM on seepage berm included the following: ActivityStart DateCompletion Date Completed Seepage BermJuly 2005October 21, 2006 Caltrans Maintenance Yard Detention Pond excavation – Three Rivers has agreed to obtain an encroachment permit and has submitted the application. At the March 16, 2007 State Reclamation Board meeting accepted the application. January 12, 2007January 19, 2007

8 Issue #2 (continued) Additional work performed on or near the seepage berm as operation and maintenance included: ActivityStart DateCompletion Date Sand placement to fill low spots identified by survey data November 13, 2006November 15, 2006 Strippings placed on seepage berm to provide top cover to prevent erosion December 6, 2006December 8, 2006 Cobble slope of seepage berm to prevent erosion December 5, 2006December 19, 2006 Further strippings to provide top cover to prevent erosion January 11, 2007January 14, 2007 Aggregate base for road placed on seepage berm January 10, 2007January 31, 2007 Hydroseeding of seepage bermFebruary 7, 2007February 9, 2007

9 Issue #3 CLAIM: The public has no confidence in the statements of the Army Corps of Engineers in regard to the level of protection provided by the Yuba River Levee, especially in light of the presence of the boulders used to seal the 1986 break. RESPONSE: Corp of Engineers is the recognized National levee expert.

10 Issue #4 CLAIM: Three Rivers is not qualified to run this program; the work should be done by RD 784, the State of California, or the Army Corps of Engineers. RESPONSE: Corps process would add years to timeline. Three Rivers and its consultants are well qualified:

11 Issue #4 (continued) Paul Brunner, civil engineer with 30 years of experience. Ric Reinhardt, civil engineer with 12 years of experience, formerly with Corps. HDR and BE/GEI provided most of design and construction oversight and currently contract with DWR and Corps.

12 Issue #5 CLAIM: Three Rivers has repeatedly made statements to the public about when the completed levees would be certified; to date those levees have still not been certified. RESPONSE: That is correct. Three Rivers does not control when the Corps will provide certification. Nonetheless, Three Rivers is hopeful it will be soon.

13 Issue #6 CLAIM: Three Rivers has not been truthful in dealing with the State Reclamation Board. RESPONSE: Three Rivers provides monthly updates (initial report, supplement report, and verbal report) to the State Reclamation Board. Three Rivers’ goal in each of these reports is to provide accurate and timely information to the State Reclamation Board. If there is an error in one of these reports, Three Rivers will correct it. To the extent that any past reports provided incomplete or incorrect information, Three Rivers regrets the action and will work diligently to correct these errors.

14 Issue #7 CLAIM: Three Rivers has been illegally working on the levees during the winter months. RESPONSE: This was addressed in response to Issue #7.

15 Issue #8 CLAIM: A significant cut has been made into the Yuba River Levee and Three Rivers is hiding that from the State Reclamation Board. RESPONSE: Three Rivers was not aware of the cut until the issue was raised at the meeting. Three Rivers has since inspected the site and found that the cut was most likely caused by work on the seepage berm in The cut has not damaged the structural integrity of the levee (See HDR tech memo dated March 15, 2007). Three Rivers has requested, and State Reclamation Board staff has approved, a variance to Permit 17921GM to repair this cut during March 2007.

16 Issue #9 CLAIM: Three Rivers illegally constructed a detention basin on Cal Trans property adjacent to the seepage berm without an encroachment permit from the State Reclamation Board. RESPONSE: Three Rivers did not believe a permit was required. Nonetheless, Three Rivers has applied for a permit and the Reclamation Board is processing it.

17 Issue #10 CLAIM: The Yuba River Levee seepage berm was constructed later than originally planned. RESPONSE: That is correct. Three Rivers planned to construct in 2006 as part of slurry wall construction, but did not receive the necessary real estate rights until 22 January Three Rivers also originally believed this berm was not required for 100 year certification, thus allowing this element to slip until 2007 if necessary. During levee certification review the Corp requested constructed before certification.

18 Issue #11 CLAIM: The accepting of a permit from the State Reclamation Board is a commitment to perform all of the work contained within the permit within the time period identified within the permit. RESPONSE: An encroachment permit is an authorization from the State Reclamation Board to perform work – it is not a requirement that the work be performed. However, Three Rivers intends to construct all necessary program elements to obtain 200 year protection.

19 Issue #12 CLAIM: Yuba River Levees are now washing out as a result of the recent rains. RESPONSE: Three Rivers and RD784 do not have any indication that recent rains have severely eroded the Yuba levees. At the last subcommittee meeting pictures were presented that showed minor erosion along the levee. RD784 or Three Rivers will repair this minor erosion during normal maintenance work at the appropriate time.

20 Three Rivers Levee Improvement Authority March 22, 2007

21 Permit Seepage Berm Y u b a R i v e r F l o o d w a y CALTRANS Maintenance Yard Southern Pacific Railroad P r o j e c t L e v e e

22 Permit Slurry Wall Slope 3:1 Y u b a R i v e r F l o o d w a y P r o j e c t L e v e e Seepage Berm S P R R