1 INTRODUCTION TO DTC ENSEMBLE TESTBED (DET) Zoltan Toth 1 1 GSD/ESRL/OAR/NOAA 2 NCAR/RAL Team Members: Barbara Brown 2, Tara Jensen 2, Huiling Yuan 1,

Slides:



Advertisements
Similar presentations
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Advertisements

Ed Tollerud In collaboration with ESRL, RFC’s, WFO’s, and CDWR HMT-DTC Task.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
CHOICES FOR HURRICANE REGIONAL ENSEMBLE FORECAST (HREF) SYSTEM Zoltan Toth and Isidora Jankov.
DTC AOP GSI October 1, FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE)
Improving High Resolution Tropical Cyclone Prediction Using a Unified GSI-based Hybrid Ensemble-Variational Data Assimilation System for HWRF Xuguang Wang.
Training actions from SPG/UR mtg 1. Develop an Integrated Satellite Training Plan (GOES R, SNPP/JPSS, Himawari, etc.) + resource request 2.Plan to provide.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Current Status of the Development of the Local Ensemble Transform Kalman Filter at UMD Istvan Szunyogh representing the UMD “Chaos-Weather” Group Ensemble.
Advancing Government through Collaboration, Education and Action Financial Innovation and Transformation Shared Services Workshop March 17, 2015.
Testbeds and Projects with Ongoing Ensemble Research:  Hydrometeorology Testbed (HMT)  Hazardous Weather Testbed (HWT)  Hurricane Forecast Improvement.
SaaS, PaaS & TaaS By: Raza Usmani
Jordan G. Powers Mesoscale and Microscale Meteorology Division NCAR Earth System Laboratory National Center for Atmospheric Research Space Weather Workshop.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Bill Kuo Summary of DTC EC Meeting 26 th August 2010.
Model testing, community code support, and transfer between research and operations: The Tropical Cyclone Modeling Testbed (TCMT) and the Developmental.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Measuring the Power of Learning.™ California Assessment of Student Performance and Progress (CAASPP) Using Formative Assessment and the Digital Library.
Ed Tollerud, Tara Jensen, Barb Brown ( also Yuejian Zhu, Zoltan Toth, Tony Eckel, Curtis Alexander, Huiling Yuan,…) Module 6 Objective: Provide a portable,
Bill Kuo DTC Management Board Meeting 17 th March 2011.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
1 The WRF Developmental Testbed Center (DTC) Bob Gall A facility where the NWP research and operational communities interact to accelerate testing and.
Barbara Brown 1, Ed Tollerud 2, and Tara Jensen 1 1 NCAR/RAL, Boulder, CO and DTC 2 NOAA/GSD, Boulder, CO and DTC DET: Testing and Evaluation Plan Wally.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
Communicating Climate and Weather Information Chris Elfring, Director Board on Atmospheric Sciences and Climate The National Academies 500 Fifth Street.
HWT Spring Forecasting Experiment: History and Success Dr. Adam Clark February 25, 2015 National Weather Center Norman, Oklahoma.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
PARTNERING WITH THE NATIONAL SCIENCE FOUNDATION Michael C. Morgan Director, Division of Atmospheric and Geospace Sciences National Science Foundation.
Summary of EMC-DTC Meeting June 18, DTC AOP 2010 Tasks to be continued from 2009: – WRF-NMM + WPP community support (Jamie Wolff) – Reference configurations.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
1 5. Overview of DTC Status and Annual Operating Plan WRF Executive Oversight Board Meeting 2 30 July 2004.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
RECAPITALIZING THE NATION’S WEATHER PREDICTION CAPABILITY National Unified Operational Prediction Capability (NUOPC)
Slides for NUOPC ESPC NAEFS ESMF. A NOAA, Navy, Air Force strategic partnership to improve the Nation’s weather forecast capability Vision – a national.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
1 Report: JAG/OCM Operational Community Modeling COPC Meeting AFWA, Omaha, NB 2 May, 2007.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Working group III report Post-processing. Members participating Arturo Quintanar, John Pace, John Gotway, Huiling Yuan, Paul Schultz, Evan Kuchera, Barb.
LAPS WORKSHOP SUMMARY Oct , ESRL, Boulder, CO.
DET Module 5 Products and Display Tara Jensen 1 and Paula McCaslin 2 1 NCAR/RAL, Boulder, CO 2 NOAA/GSD, Boulder, CO Acknowledgements: HWT Spring Experiment.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Sustaining Existing Businesses Exploring Opportunities for a Stronger Regional Economy.
Toward GSI Community Code Louisa Nance, Ming Hu, Hui Shao, Laurie Carson, Hans Huang.
Bill Kuo DTC Science Advisory Board. Outline Charge of DTC Science Advisory Board (SAB) Membership of DTC SAB Operation of DTC SAB Review of DTC tasks.
Edward Tollerud 1, Tara Jensen 2, John Halley Gotway 2, Huiling Yuan 1,3, Wally Clark 4, Ellen Sukovich 4, Paul Oldenburg 2, Randy Bullock 2, Gary Wick.
STESEG taskforce on timeliness and benchmarkingJune The Short-term economic statistics: STES Timeliness Framework Richard McKenzie OECD.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Sol-Terra: A Roadmap to Operational Sun-to- Earth Space Weather Forecasting Mike Marsh 1, David Jackson 1, Alastair Pidgeon 2, Gareth Lawrence 2, Simon.
Page 1 Andrew Lorenc WOAP 2006 © Crown copyright 2006 Andrew Lorenc Head of Data Assimilation & Ensembles Numerical Weather Prediction Met Office, UK Data.
NOAA’s response strategy to the Hurricane Iintensity Research Working Group (HIRWG) and related recommendations Greg Mandt NOAA NWS Office of Science and.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
DET Module 1 Ensemble Configuration Linda Wharton 1, Paula McCaslin 1, Tara Jensen 2 1 NOAA/GSD, Boulder, CO 2 NCAR/RAL, Boulder, CO 3/8/2016.
The WRF Verification Toolkit Lacey Holland, Tressa Fowler, and Barbara Brown Research Applications Laboratory NCAR Lacey Holland, Tressa Fowler, and Barbara.
1 Multimedia Development Team. 2 To discuss phases of MM production team members Multimedia I.
EUMETSAT, May 2014 Coordination Group for Meteorological Satellites - CGMS Terms of Reference CGMS-ICWG CGMS International Clouds Working Group by EUMETSAT.
Bill Kuo 1, Steve Koch 2, Barb Brown 1, Louisa Nance 1 Developmental Testbed Center 1. National Center for Atmospheric Research 2. Earth System Research.
Developmental Testbed Center: Overview
Developmental Testbed Center: Governance highlights
Update from the Faster Payments Task Force
S2S sub-project on verification (and products)
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Presentation transcript:

1 INTRODUCTION TO DTC ENSEMBLE TESTBED (DET) Zoltan Toth 1 1 GSD/ESRL/OAR/NOAA 2 NCAR/RAL Team Members: Barbara Brown 2, Tara Jensen 2, Huiling Yuan 1, Isidora Jankov 1, Ed Tollerud 1, Linda Wharton 1, Paula McCaslin 1 Acknowledgements: Steve Koch, Jun Du, Yuejian Zhu, Geoff Dimego, Bill Lapenta DET website:

2

3 About 3,220,000 results (0.28 seconds) Search Results Amazon.com: Gypsy Music From Hungary And Romania: Zoltan And His... Gypsy Music From Hungary And Romania by Zoltan And His Gypsy Ensemble. This product is manufactured on demand using CD-R recordable media.... ›... › Europe › Eastern Europe › Romania - Cached - Similar Amazon.com: Zoltan & His Gypsy Ensemble: Albums, Songs, Bios, Photos Visit Amazon.com's Zoltan & His Gypsy Ensemble Store to shop for Zoltan & His Gypsy Ensemble albums (CD, MP3, Vinyl) and other Zoltan & His Gypsy... His...Ensemble/e/B000APVOT6 - Cached - Similar Show more results from Zoltan & His Gypsy Ensemble - Rhapsody Music Listen to Zoltan & His Gypsy Ensemble FREE on Rhapsody.com. Rhapsody lets you explore every style of music without paying per song. - Cached – Similar Zoltan and His Gypsy Ensemble – Free listening, concerts, stats... Listen free to Zoltan and His Gypsy Ensemble: Gypsy Tango, Hungarian Song And Dance & more, plus 1 picture. Gypsy, Hungarian and Balkan. – Cached Zoltan & His Gypsy Ensemble MP3 Downloads - Zoltan & His Gypsy... Zoltan & His Gypsy Ensemble on MP3.com - listen to audio streams, check out photos, watch videos, write a review, discover similar artists, find news and... his...ensemble/summary/ - Cached – Similar Zoltán Kodály – Háry János-Suite | for large orchestra - Universal... Zoltán Kodály — Picture – Zoltán Kodály.... Student ensemble Student ensemble also played the following 5 works: Cached [PDF] ON THE ECONOMIC VALUE OF ENSEMBLE BASED WEATHER FORECASTS Yuejian... File Format: PDF/Adobe Acrobat - Quick Viewby Y Zhu Cited by Related articlesON THE ECONOMIC VALUE OF ENSEMBLE BASED WEATHER FORECASTS. Yuejian Zhu1, Zoltan Toth1, Richard Wobus1, David Richardson2, and Kenneth Mylne3...

OUTLINE / SUMMARY Why and how DET was formed? –Community and NOAA ready –Sept 2009 Workshop Major tasks –Infrastructure, test & evaluation, transition Timeline –Planning, basic capabilities, benchmark, testing Questions –For WG discussion Workshop expectations –Recommendations for DET infrastructure & candidates for testing

FORMATION OF DET IN FY2010 Confluence of necessary ingredients Need –Strong interest from both community & agencies Knowledge base –Roadmap from Sept 2009 Workshop National Workshop on Mesoscale Probabilistic Prediction at NCAR Opportunity –Increase in funding for DTC from NOAA Initiative –DTC Director’s Office sets planning process in motion (Oct 09)

OBJECTIVES & LIMITATIONS “Provide an environment in which extensive testing and evaluation of ensemble-related techniques developed by the NWP community can be conducted such that the results are immediately relevant to the operational centers (e.g., NCEP/EMC and AFWA)” Link research & operational communities –R2O – Testable techniques from research to operational community –O2R – Operational codes and requirements from operational to research community Constraints –Limited funding ~ 3 FTEs – New task lead to be hired soon GSD & NCAR collaborative effort –Excited about working with community on new project –No funding for research Except via very limited visitor program Initial focus on mesoscales

DET MAJOR TASKS Develop and maintain DET infrastructure Establish NCEP operational system as benchmark Test and evaluate new community methods Transition successful methods to NCEP and other agencies Link up with ensemble work in other test-beds Input from revived WRF Ensemble WG Close collaboration with NCEP

INFRASTRUCTURE Objective –Assemble software and procedures to carry out main function of testing and evaluation of community methods Structure –Six modules identified Ensemble configuration Initial perturbationsEnsemble generation – meso-specific Model-related uncertainty Statistical post-processing Products / servicesUse of info – general, applies to all ens Verification Requirements –Modularity to facilitate transition to operations –Portability for ease of execution where computational resources are available –Flexibility to allow testing of new ideas

Module 1: Configuration Module 2: Initial Perturbations Module 4: Statistical Post- Processing External Input (HMT, HWT, HFIP, etc) Module 3: Module Perturbations Module 5: Product Generation Module 6: Verification DET MODULES

BENCHMARK Purpose –Ensemble system/module used as reference when testing and evaluating new community methods Definition –NCEP (or other center’s) operational ensemble system/module at any time Facilitate community’s easy access to and tools to work with benchmark Choice of first DET benchmark –Adopt current NCEP operational system/module By time task completed benchmark may be obsolete –Contribute to building system/module for next NCEP implementation In collaboration with NCEP –Accelerates NCEP implementation schedule Avoids falling behind at start Related tasks –Set it up, update, make it available to community

TEST AND EVALUATION Core DET task Carried out according to detailed protocol Independent from developers Use operational and other metrics First application –Test & evaluate benchmark system / module against current operational system as reference

TRANSITION TO OPERATIONS Objective –Offer NCEP & other agencies carefully tested and well performing modules IT solution –Use subversion control Potential NCEP actions –Possible modification Streamline, combine with other modifications, etc –Further test & evaluation –Final selection –Implementation into operations

LINK WITH OTHER TESTBEDS Objective –Leverage and coordinate DET work with other DTC testbeds and agency programs/projects for mutual benefits Examples – HMT, HWT, HFIP - Ensemble development & evaluation work DET to support ensemble work in various applications –Share infrastructure, best methods & practices, etc –GSI – Hybrid Variational / Ensemble-based data assimilation DET to focus on ensemble system (perturbations, etc) GSI task to focus on data assimilation aspect?

DET TIMELINE – STARTING MARCH 2010 First year deliverables – Planning, basic capabilities –Detailed plan for infrastructure (6 modules) –Basic capability for first two modules –Protocol for T&E –Plan for & commence collaboration with HMT Second year deliverables – Basic capabilities, benchmarks –Basic capability for all 6 modules –Benchmark for modules 2, 3, & 6 –T&E for Benchmarks 2 & 3 –Contribute to NCEP implementation for modules 2&3 (FY11-12) –Contribute to design and evaluation of HMT, HWT, & HFIP ensembles Third year deliverables – Benchmarks, T&E –Benchmark for modules 4-6 –T&E for Benchmark 4 –Contribute to NCEP implementation for module 4 (FY12-13) –TET of community methods for modules 2&3 Fourth year deliverables –TET of community methods for all modules –Update benchmarks

Module 1: Configuration Module 2: Initial Perturbations Module 4: Statistical Post- Processing External Input (HMT, HWT, HFIP, etc) Module 3: Module Perturbations Module 5: Product Generation Module 6: Verification DET MODULES

QUESTIONS Interest from agencies beyond NOAA? –AFWA, ONR? Expansion to global ensemble? –Needed? Expected benefits? –Resource implications? –NUOPC interagency interest? EnKF and similar DA applications tackled jointly with DTC GSI task? –DET – Creation of ensemble –GSI – Data assimilation step

QUESTIONS – CONT. Candidate methods for testing? –How to prioritize? NCEP involvement at all steps How to measure success for DET? –Define metrics for quality & performance –Improvement over benchmark of tested methods? Where to perform DET T&E? –Only limited resources on host (GSD, NCAR) computing facilities –In search of other opportunities… Community outreach –Alternate biannual workshops DET Ensemble Research / Development Workshop NCEP Ensemble User Workshop –User support via tutorials, what else?

WORKSHOP EXPECTATIONS Review ongoing research for potential testing by DET –Identify candidates and possible collaborative efforts Review DET activities / plans –Are community and NCEP needs met? –DET’s role in national mesoscale ensemble effort Breakout Group discussions on above WRF Ensemble WG meeting Friday am –Further discussion and recommendations

OUTLINE / SUMMARY Why and how DET was formed? –Community and NOAA ready –Sept 2009 Workshop Major tasks –Infrastructure, test & evaluation, transition Timeline –Planning, basic capabilities, benchmark, testing Questions –For WG discussion Workshop expectations –Recommendations for DET infrastructure & candidates for testing

BACKGROUND

EnKF sequential DA EnKF initial perturbations and forecasts GSI var. DA GSI-EnKF Hybrid Approach Analysis error estimate Ensemble-based forecast error covariance estimate Data assimilation step done twice Initial perturbations reflect uncertainty in ENKF, not GSI

Alternate Hybrid Approach ET (or other) initial perturbations and forecasts GSI var. DA Analysis error estimate Ensemble-based forecast error covariance estimate Only one (variational) Data assimilation Initial perturbations reflect uncertainty in GSI Challenge to create good estimate

HOW TO REPRESENT MODEL RELATED UNCERTAINTY? Multiple models or model versions – Pragmatic approach Different models / model versions being developed by community – Instead of competition, use them all in ensemble mode – Diversity of opportunity - Not by “design” Ad hoc approach, trial and error – try in ensemble, see if it works or not – Scientifically not well founded? If we wanted to intentionally create different models / model version – What design directives could we use? Stochastic modeling – Build a single model that can represent all model related uncertainty by design – Consider stochastic effect of subgrid-scale and other unresolved processes – Scientifically more appealing – Requires community to embrace new paradigm Focus on model development for ensemble use Different groups work on various aspects of same model?