LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Implementation of Non Effective Days Nexus Workgroup – March
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
Shrinkage Forum Monday 27 June 2011, 31 Homer Road.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of 2000 Model.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Shrinkage Forum 04 June 2013 Roy Malin. 2 Best Practice - Areas of Inconsistency AreaBackgroundAction Definition of All-PE systems Used to identify networks.
Shrinkage Forum 22 January 2014 Roy Malin /15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
LDZ Shrinkage Forum Jonathan Dennett Elexon 22 nd June 2006.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Customer Charge On behalf of all DNs 25 October 2010.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Industry Dialogue on xoserve Services 14 th September 2007.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Code Governance Review UNC Modification Proposals
Rebecca Knight Mod 644 UIG Analysis.
Incentives 26 September 2018.
Leakage Model Modification Update
NTS Entry Charging Review Update
Modification th July 2008.
Chris Warner Network Code Manager
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Joint Office Presentation for Modification 0678
Leakage Model Modification Update
Annual Quantity (AQ) 45.
Presentation transcript:

LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008

Topic areas  LDZ Shrinkage  What is LDZ Shrinkage?  Own Use Gas and Theft of Gas  Leakage  National Leakage Tests  UNC Section N Timeline  Shrinkage Forum  2007/08 Shrinkage Factors  Modification Proposal 0203V  Gas Prices  Shrinkage Allowances (E8)  Environment Emissions Incentive (E9)

LDZ Shrinkage Introduction  What is LDZ Shrinkage?  “For the purposes of the Code shrinkage means gas in a System which is used by the Transporter in connection with the operation of, or which is unaccounted for as offtaken from, a System”  For the purposes of UNC, LDZ Shrinkage comprises of  own use gas: gas used in running compressors, and gas used for preheating  unaccounted for gas: gas lost or unaccounted for by reason of unidentified theft, error in meter correction and leakage, including gas vented in its operation  2007/08 Procurement Context*  1,904 GWh  0.6% LDZ throughput  £26.6m * National Grid Networks only Chart for illustration only, not to scale

What is LDZ Shrinkage? Key Components Total LDZ Shrinkage Own Use Gas 2% of 2007/08 Shrinkage Holder Pre-heatPre-heat Gas Leakage 95% of 2007/08 Shrinkage Distribution Mains and Service Leakage Low PressureMedium Pressure Broken Mains Above Ground Installation Leakage Holder Stations NTS / LTS / <7bar PRS Service Governors PurgingVenting Equipment vented for maintenance Equipment that vents in use Theft of Gas 3% of 2007/08 Shrinkage Transporter responsible Theft Supplier responsible Theft

What is LDZ Shrinkage? UNC Definitions “unaccounted for gas” “own use gas”

Own Use Gas and Theft of Gas Contributes to only 5% of LDZ Shrinkage Requirements  Own Use Gas  Calculated via model as opposed to being measured  Historically no requirement to meter sites  Complex model uses actual telemetered regulator throughput, temperature & pressure data, where available  New updated model first used in 2005/06  Theft of Gas  Negotiated proportion of LDZ Throughput  Instances of Theft assumed to be 0.3% of LDZ throughput, of which 10% of the total theft was transporter responsibility (i.e. 0.03% of LDZ throughput)  Transporters however believe that only 3.1% is transporter responsibility (i.e. 0.01% of LDZ throughput) based on confirmed occurrences of theft from xoserve  Theft upstream of ECV proven to be difficult to identify so currently agreed to be 0.02% of LDZ throughput

Leakage Contributes to 95% of LDZ Shrinkage Requirements  Majority of leakage relates to Low Pressure (81%)  Predefined leakage rates:  11 mains leakage rates and 4 service leakage rates  2002/03 National Leakage Test  Low Pressure Leakage Components:  Mains Asset Statistics  Average System Pressure  Monoethyleneglycol (or MEG!)  Number of Services

National Leakage Tests 2002/03 Advantica test programme  In 1992, British Gas commissioned a programme of leakage tests to quantify the leakage from its distribution system  Leakage rate data used to facilitate Shrinkage Factor Negotiations  Shippers requested disallowance of proposed LDZ Shrinkage Factors in 2001/02 due to out-of-date leakage rate data  Transco commissioned Advantica to carry out a new programme of tests as a result of the disallowance  2002/03 National Leakage Test (NLT) programme  A total of 862 tests were carried out in the period from February 2002 to May 2003, providing 849 usable results  The results of the NLT programme were presented to the Shrinkage Forum in June 2003  Leakage Rates were lower than those determined in the previous 1992 test programme  Concluded to be as a result of Transco’s mains replacement programme, which tended to target poor condition mains  For the Low Pressure system, this resulted in an overall reduction of approximately 31%. For the Medium Pressure system, the overall reduction came out at less than 1%

UNC Section N Timeline Establishment of Gas Year LDZ Shrinkage Volume April, May & early June Analysis carried out to support initial Shrinkage proposals 1 July Submit estimated LDZ Shrinkage / methodology to Users “Initial Proposals” Late June / early July Opportunity to present estimated Shrinkage to Shrinkage Forum 1 September Submit final estimated LDZ Shrinkage / methodology to Users “Final Proposals” 1 July – 1 August Users may submit representations in respect of the estimated Shrinkage 1 – 15 August DNs to consider User representations and may convene meeting if deemed appropriate 1 – 15 September Users may request a disallowance OctJunJulSepAprMayAugNovDecJan 15 September – 1 October Possible Ofgem Determination Process Late September Issue instructions to load new shrinkage requirements into Gemini Gas Year….

Shrinkage Forum Industry Discussion Forum  Provides an opportunity for Transporters to meet interested parties in order to discuss LDZ Shrinkage issues such as:  Shrinkage Factor Proposals  Assessment & Adjustment Report  Joint Office provides administrative support  Chair: Tim Davis chairs the meeting  Secretary: Lorna Dupont is the Secretary

2007/08 Shrinkage Factors April 2007 to March 2008  LDZUNC FactorsLicence Factors  EA0.593% / 0.620% 0.593%  EM0.519% / 0.510% 0.519%  NT0.622% / 0.550% 0.622%  NW0.656% / 0.630% 0.656%  WM0.729% / 0.730% 0.729% N.B.  UNC Factors – Gas Year  Licence Factors – Formula Year

Modification Proposal 0203V Areas being addressed  For the Gas Distribution Networks Price Control, Ofgem fixed a volumetric allowance for Shrinkage for each LDZ, as opposed to ex ante target shrinkage factors (percentages of throughput).  Ofgem concluded that on the basis of evidence available, there is little correlation between shrinkage and throughput for the existing networks  As a result, changes to Section N have been progressed:  to update references to LDZ Shrinkage Factors to reflect LDZ Shrinkage Quantities  make appropriate amendments to the content of industry notification processes, namely current Initial and Final Proposals  effect minor change to the classification of LDZ vented gas, consistent with the operation of the approved Leakage model calculations (vented gas is not burnt and therefore should be classed as unaccounted for gas, not own use gas)  update the sources of information used in the assessment process to include all inputs to the leakage model  System amendments (Gemini / UK Link) being considered and progressed in parallel  Modification currently with Ofgem for determination  Preferred implementation date 1 July 2008

Gas Prices Day-Ahead Price Trend ?

Shrinkage Allowances (E8) Revised Regulatory Regime Introduced  Shrinkage is gas lost from the system through leakage, theft and own use gas  Concluded there was no measurable correlation between shrinkage (leakage) and throughput  2007/08 allowances (volume & price) ‘rolled over’ for first six months to allow UNC modification proposals to be progressed  Revised regime reduces both (weather related) volume risk and price risk 2007/08 Shrinkage Allowance Shrinkage Factors (predefined within licence) multiplied by actual throughput multiplied by Gas Reference Price (3 month ahead price * 3.5% uplift) Shrinkage Allowance Shrinkage Quantities (predefined ‘reducing’ volumes within licence, broadly reflective of BPQ submission) multiplied by Gas Reference Price (Day Ahead Price)

Shrinkage Allowances (E8) Allowed Shrinkage Quantities

Environment Emissions Incentive (E9) Dx mains leakage significant source of greenhouse gas emissions  Additional incentive, over and above mains replacement programme, to reduce leakage based on social cost of carbon  Average of £29.7 per MWh over the period  Cap / Collar at 10% of baseline leakage volumes