Building Back Better Rural Housing Reconstruction Training strategy.

Slides:



Advertisements
Similar presentations
Child Protection Units
Advertisements

Guidance Note on Joint Programming
Sigma assistance to public procurement reform
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
School Community Councils Tuesday, March 23, 2010.
CLEAR Climate Leadership for Effective Adaptation and Resilience Date: April 25, 2012.
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
Process and Requirements of the Accreditation of National Implementing Entities for Direct Access under the Adaptation Fund for the Pacific Sub Region.
1 Sonali Mohapatra The World Bank Land and Poverty Conference March 24, 2015 Land Literacy to Enhance Rural Women’s Secure Land Rights: Reflections from.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
PHAB's Approach to Internal and External Evaluation Jessica Kronstadt | Director of Research and Evaluation | November 18, 2014 APHA 2014 Annual Meeting.
Second Sudan Consortium March 2007 Water Supply and Sanitation Service Delivery and Challenges in Southern Sudan Ministry of Cooperatives and Rural Development.
Rotary Community Corps EXIT. Rotary Community Corps Rotary Community Corps (RCC) is one of Rotary International’s nine structured programs designed to.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
1 Fundamental Elements: Action Programme for Trade Union Education of the New International Confederation Presentation at: ILO Trade Union Training on.
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
Sustainable Building Oregon Team Oregon Department of Education, June 2010.
This product was developed by Florida’s Positive Behavior Support Project through University of South Florida, Louis de la Parte Florida Mental Health.
Department of Transport October 2007 Women in Transport Seminar Consolidated Action Plan Report.
In the Name of God, Most Gracious, Most Merciful.
Workshop: Public Employment Services  Organized by:  Inter-American Network for Labor Administration (RIAL)  Panama City  December 10 and 11, 2008.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Session 5 Integrating CLAS Into Policy and Practice CLAS Training [ADD DATE] [ADD PRESENTER NAME] [ADD ORGANIZATION NAME]
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Strengthening Community Based Disaster Risk Reduction Name of you organization: UNDP Target Countries :- INDIA Cost of Action :$ 841, Stakeholders/beneficiaries:-
By Bankole Ebisemiju At an Intensive & Interactive workshop on Techniques for Effective & Result Oriented Annual Operation Plan November 24th 2010 Annual.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
PROPOSAL FOR A MODEL MENTAL HEALTH COMMUNITY BASED SERVICE DELIVERY.
DG ECHO GENDER POLICY and GENDER-AGE MARKER
Regulatory requirements in the current programming period Funchal, 18 November 2010.
ILO Management of Training Institutions Workshop Flexible Training Delivery Trevor Riordan ILO Senior Training Policy Specialist.
Kansas Youth Vision Team: Serving Our Neediest Youth Atlanta, GA September, 2006.
Mozambique The United Nations At Work THE UN REFORM Delivering as One Pilot Initiative in Mozambique 11 May 2009.
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
1 2009/10 DIVISION OF REVENUE BILL Presentation to Select Committee on Finance 24 February 2009.
SUMMARY PROJECT OUTLINE (SPROUT) ITC-ILO/ACTRAV Training Course A : Trade Union Training on ILS & the ILO Declaration on Fundamental Principles &
The partnership principle and the European Code of Conduct on Partnership.
Developing and maintaining a clearance plan including determining priorities Mr Tim Horner Mine Action Advisor, Bureau for Crisis Prevention and Recovery,
A project implemented by the HTSPE consortium This project is funded by the European Union SECURITY AND CITIZENSHIP RIGHT AND CITIZENSHIP
Housing as a Process, Not a Product
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
TB Alert’s Programme: Local TB Partnerships Manchester Health & Wellbeing Forum. Wed 27 th.
International Network of Treatment and Rehabilitation Resource Centres Prevention, Treatment and Rehabilitation Unit Global Challenges Section.
PSFRP Pakistan Settlement Flood Recovery Project Planned Trainings for the Communities Presentation to HERWG, 03. August 2011.
Comments on DHS 2012 Strategic Plan (with specific reference to ‘Special Needs Housing’) 18 April 2012 Community Law Centre and Centre for Disability Law.
1 Module 1 Introduction: The Role of Gender in Monitoring and Evaluation.
Presentation to the Portfolio Committee on Provincial & Local Government Branch: Free Basic Services and Infrastructure Mr Yusuf Patel 19 ~ 20 February.
Workshop on Restoration of Land Ownership Rights and Strengthening the Land Administration System in Post-Tsunami Aceh Monitoring Project Implementation.
© PeopleAdvantage 2013 All Rights Reserved We will Show You How to Easily Conduct Effective Performance Appraisals LCSA Conference 2013.
WASH Cluster Update 7/12/11 WASH CLUSTER PAKISTAN.
Specific Objectives  Coordinate the training of members from affiliates  Review and design new education training materials on labour education  Build.
STRENGTHENING COMPETENCE IN MAKING PLAN OF SOCIO – ECONOMIC DEVELOPMENT IN PERIOD AT LOCAL LEVEL Presented by Mr. Ngo Sy Bich Vice Director Bac.
Building PADEE´s Farmers Managed Community Learning Centers A brief review and way forward Phnom Penh 01/04/2015 IFAD&PROCASUR ROUTASIA Programme Seng.
Enhancing Quality and Access to TVET for Employability EQUATE.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Steps in development of action plans ITC-ILO/ACTRAV Course A3 – Trade Union Training on Information Management for Trade Union Organization, Research.
HRRP COORDINATION MEETING, GORKHA Chair: Shyam Kisor Singh (DUDBC) Facilitator: District Coordinator: Minar Thapa Magar Information Management: Swopnil.
Census Planning and Management
AIMS Provide insights into the development of the use of the term self-recovery in post disaster shelter response, and to clarify its current use.
Reconstruction Skills Project
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Translating ideas into proposals for action programmes
Policies and Planning of Literacy and CLCs in Afghanistan
Field Operations & Structure and Technical Cooperation Review
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Strategic Boards Toolkit
Translating ideas into proposals for action programmes
Translating ideas into proposals for action programmes
Translating ideas into proposals for action programmes
Presentation transcript:

Building Back Better Rural Housing Reconstruction Training strategy

Goal Houses rebuilt using earthquake resistant techniques EQ resistant building techniques need to be transmitted to builders Earthquake resistant Need to introduce EQ resistant elements in traditional building techniques using common materials Use of familiar methods and easy accessible materials Owners need to understand EQ resistant techniques Owner driven Reconstruction principles in relation to training

Main challenges Responses Avoiding gaps and overlaps Coordination structure from Union Council, to Tehsil, to District, to Province Coordinator positions at District and Provincial levels 400,000 houses to be rebuilt over a large territory with difficult geography Decentralized system based on provincial and districts authorities Use of partner organisations Community based approach

Main challengesResponses Time shortage rebuilding rush in March to June rebuilding slow in monsoons and winter Training of Trainers started beginning of March Initial training focusing on basic techniques More sophisticated training during monsoon season Construction styles vary across affected area Training emphasize EQ resistant principles which must be adapted to local contexts Need for an immediate/interim training plan

Target groupsType of training Masons, artisans, self- builders, unskilled labor Enhance skill through Hands on technical training Detailed skill specific training Owners with specific modules for women EQ resistant check list Local Councilors, Elders, Imams, School Headmasters, etc. Government policies and procedures EQ awareness raising Community Based Organisations Awareness, policies, compliance, assistance to vulnerable groups, etc. New workforce Training from scratch Hands on technical training Detailed skill specific training

Training coordination - Interim Federal Province/state District Union Council Partner organisations (PO) Village Mobile Teams and Community Housing Reconstruction Committee (CHRC) CHRC support mobile teams in implementing training strategy ERRA ERRA Provincial Housing Coordinator ERRA District Housing Coordinator Housing Reconstruction Centers (HRC) PO submit their training programme to District Coordinator HRC support PO in preparing their training programme Weekly coordination meeting District Housing Coordinator prepare district Training Programme Provincial Housing Coordinator prepare provincial Training Programme ERRA consolidate federal training Programme for ERRA Board

ERRA HQ Training coordination (Proposed final mechanism) Federal Province/state Steering Committee (SC) Reconstruction Agency (RA) District Advisory Committee (DRAC) District Reconstruction Unit (DRU) Housing Reconstruction Centers (HRC) Union Council Partner organisations (PO) Village Community Housing Reconstruction Committee (CHRC) DRU approve POs training programmes CHRC support mobile teams in implementing training strategy PO submit their training programme to DRU HRC support PO in preparing their training programme DRU consolidate POs training programme and prepare district training programme for approval by DRAC RA consolidate DRUs training programme and prepare provincial/state training programme for approval by SC ERRA consolidate federal training Programme for ERRA Board

Preparation of common curricula Training of Training Coordinators Cascade of training Federal and Provincial/State Districts Housing Reconstruction Centers Union CouncilsPartner Organisations Villages Mobile Training Teams Training of Master Trainers of Partner Organisations Training of Mobile Teams Training of artisans, self-builders, contractors, communities, etc.

Cascade of training (estimated numbers) Partner Organisations Mobile Training Teams 4,000 villages Training of 20 Training Coordinators Training of at least 150 Master Trainers of Partner organisations Training of 650 Mobile Training Teams One mobile training team handle an average of 6 villages One master trains 5 Mobile training teams 2 Training Coordinators per Housing Reconstruction Center Housing Reconstruction Centers

Role of Housing Reconstruction Centers (HRC) Training of Master Trainers Technical reference and public awareness Coordination of training implementation Training quality control of training delivered by Master trainers At least 8 Housing Reconstruction Centers Rawalakot Bagh Muzafarabad Abbottabad Mansehra Batagram Bisham Kohistan Reporting on training monitoring to District Housing Coordinator Capacity-building of local authorities

Role of District Reconstruction Unit (DRU) in training Planning annual training programme POs coordination by District Housing Coordinator Consolidation of monitoring results reported by Partner Organisations Rawalakot Bagh Muzaffarabad Abbottabad Mansehra Batagram Bisham Kohistan Monthly reporting on training monitoring to District Steering Committee (DRAC)

Challenge How to bring earthquake resistant building techniques and knowledge to the village level Challenge How to bring earthquake resistant building techniques and knowledge to the village level Mobile training teams

Composition of mobile training team 2 trainers (of different trades) 1 male social mobiliser 1 female social mobiliser (where needed)

Responsibilities of Mobile training teams Build capacity of “Community Housing Reconstruction Committees” Conduct training Encourage compliance Provide on the spot advise on construction Communicate Government policies Identify issues linked with EQ resistant construction

Roles of Community Based Organisations Housing Reconstruction Committees Assist mobile teams in organising training sessions Promote EQ resistant building techniques Inform about housing reconstruction policies Organise collective building material procurement, material quality control and logistics Contribute to compliance through advising home owners Lead housing reconstruction planning activities Contribute to data on the community Support community based land dispute resolution Assist vulnerable families

Union Council = basic unit for training by Partner Organisations (PO) No more than one PO per Union Council One PO can cover more than one Union Council Village 2 Village 3 Village 4 Village 5 Union Council Village 1

Role of Partner Organisations in training Establish field office at appropriate level Mobile Team 2 Mobile Team 1 Plan mobile team training programme Certify trainees Train Mobile Teams Train artisans

Monitor training adequacy Role of Partner Organisations in training Establish field office at appropriate level Plan mobile team training programme Train Mobile Teams Train artisans Certify trainees

Training monitoring and evaluation Interim mechanism Union Council Partner organisations (PO) Village Community Housing Reconstruction Committee (CHRC) Mobile Training Teams report to PO on delivery of training at village level POs monitor quality of training delivered by the mobile teams POs report to HRC HRC monitor quality of training delivered by POs HRC report to District coordinator on implementation of training ERRA consolidate federal report on training programme implementation District Coordinator report to the Province Provincial Coordinator report to ERRA ERRA monitor quality of training delivered by HRC Federal Province/state District ERRA Board ERRA Provincial Housing Coordinator ERRA District Housing Coordinator Housing Reconstruction Centers (HRC)

ERRA HQ Training monitoring and evaluation (proposed final mechanism) Federal Province/state Steering Committee (SC) Reconstruction Agency (RA) District Advisory Committee (DRAC) District Reconstruction Unit (DRU) Housing Reconstruction Centers (HRC) Union Council Partner organisations (PO) Village Community Housing Reconstruction Committee (CHRC) Mobile Teams report to PO on delivery of training at village level HRC report to DRU on implementation of training DRU report to RA ERRA consolidate federal report of training programme implementation HRCTraining Coordinators monitor quality of training delivered by POs PO report to HRC POs monitor quality of training delivered by the mobile teams RA report to ERRA ERRA monitor quality of training delivered by HRC

Training time frame Reconstruction training Refresher training and monitoring Maintenance & Handover

Training detailed work-plan Training in villages

Generic Implementation Plan 1.Orientation 2.Planning and Preparation 3.Reconstruction Training 4.Refresher Training & Monitoring 5.Maintenance and Hand-over Overview of “Phases and Steps”

Phase I: Orientation DRAFT

Phase II: Planning & Preparation DRAFT

Phase III: Reconstruction Training DRAFT

Phase IV: Refresher Training DRAFT

Phase V: Maintenance and Handover DRAFT

Estimated cost of training activities per year and per Union Council range from Rs. 2.5 million to Rs. 7 millions Resources/capacity that should preferably exist for interested Partner Organisations (PO) On the ground presence Proven management capacity 1 year minimum commitment Expressions of interest from Partner Organisations collected so far: Commitments with some funding from more than 15 organisations

Thank you