Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project IR Layout Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Philip Burrows ACFA Workshop, Sendai 3/03/081 SiD Philip Burrows John Adams Institute Oxford University Thanks to: Marco Oriunno,
Push Pull Considerations
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
1 GLD Surface Assembly Y. Sugimoto KEK
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Philip Burrows MDI session, LCWS06 Bangalore, 10/3/06 SiD MDI Issues Philip Burrows John Adams Institute Oxford University Thanks to: Marty Breidenbach,
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
LOI Planning The Very Forward Region Tom Markiewicz/SLAC Takashi Maruyama/SLAC Uriel Nauenberg/UCB SiD Collaboration Meeting, Boulder, CO 19 September.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
Detector design optimization for push-pull IR and for surface assembly and corresponding IR requirements Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
SiD Conceptual Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 31, 2006 Global Design Effort 1 IR hall deflection study October 31, 2006 John Amann, Andrei Seryi.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Philip Burrows SiD Meeting, SLAC 27/10/06 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University.
SiD IR & MDI Status & Comments Tom Markiewicz/SLAC ALCPG, Fermilab 26 October 2007.
SiD Engineering and Solenoid Kurt Krempetz (Layer 5) (Layer 1) VXD.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
SiD MDI Update Topics for Discussion Tom Markiewicz/SLAC ILC BDS Meeting 15 May 2007.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
SiD Collaboration Meeting SLAC, December 2011
Machine Detector Interface Design Updates
Present status of the flux return yoke design
ILC Interaction Region and Machine Detector Interface
Layout of Detectors for CLIC
Update of experimental hall in Japanese mountain site
Detector hall in mountain regions
Changes to SiD since the DBD
Radiation Physics requirements for the IR
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Detector hall in mountain regions
A 12-min Introduction to The ILC Machine Detector Interface and SiD
Presentation transcript:

Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz

Philip Burrows SiD Meeting, Paris 11/02/082 Outline ‘Interaction hall’ considerations: push-pull configuration surface assembly ‘Beamline’ considerations: FF magnet package door opening/access support of ‘R20’ module beampipe engineering Outlook

Philip Burrows SiD Meeting, Paris 11/02/083 Push-pull: SiD assumptions Having two detectors on beamline ‘permanently’, and sharing the luminosity, i.e. two IPs, is clearly the ideal solution for physics Luminosity delivery to two IPs, with fast switchover between IPs, is not possible Two detectors in push-pull mode will: - save cost of one BDS - increase likelihood of two detectors from start - provide equal access to luminosity for both detectors

Philip Burrows SiD Meeting, Paris 11/02/084 SiD statement on technical Issues Push-pull can probably be engineered to work - many technical issues will need to be solved Full access to offline detector is mandatory Best accomplished with self-shielding detectors - self shielding is technically feasible Mechanisms for moving detector should not reduce acceptance Need to align ‘captured’ beamline components independent of overall detector position

Philip Burrows SiD Meeting, Paris 11/02/085 SiD: technical questions Can detector be engineered so magnetic field map remains invariant under detector in/out? Can tracking chamber alignment be restored without calibration runs (eg. with internal alignment system)? Can detector remain fully operable in ‘out’ position? - cosmic ray data-taking to maintain operability Can switchover time be made short enough?

Philip Burrows SiD Meeting, Paris 11/02/086 SiD: sociological issues Need well defined procedure for scheduling swaps Machine luminosity must be shared equitably Period between swaps should be of order 1 month: - neither detector can gain significant lumi advantage in 1 period Switch-over time << running period

Philip Burrows SiD Meeting, Paris 11/02/087 accessible during run (radiation worker) accessible during run (general personnel) not accessible during run fence Platform for electronic and services (~10*8*8m). Shielded (~0.5m of concrete) from five sides. Moves with detector. Also provide vibration isolation. Concept which does not rely on self-shielding detector Seryi

Philip Burrows SiD Meeting, Paris 11/02/088 On-surface (a la CMS) detector assembly According to tentative CF&S schedule, detector hall would not be ready for detector assembly until 4y11m after project start If so, cannot fit into the goal of “7 years until first beam” and “8 years until physics run” Surface assembly allows earlier start by years and meets this goal The collider hall size is also smaller in this case - surface building needed, but potential savings still substantial Assumptions were made on sizes of underground hall + surface building, shafts, cranes above and below ground … will be revisited - needs serious engineering study of assembly, installation, access, safety, services, cabling …

Philip Burrows SiD Meeting, Paris 11/02/089 CMS assembly approach: Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment: 15 loads, 300-> 2000t Potential for big time saving Reduce size of underground hall required

Philip Burrows SiD Meeting, Paris 11/02/0810 Air-pads at CMS Photo from the talk by Y.Sugimoto, Single air-pad capacity ~385tons (for the first end-cap disk which weighs 1400 tons). Each of air- pads equipped with hydraulic jack for fine adjustment in height, also allowing exchange of air pad if needed. Lift is ~8mm for 385t units. Cracks in the floor should be avoided, to prevent damage of the floor by compressed air (up to 50bars) – use steel plates (4cm thick). [Alain Herve, et al.] SiD also exploring ‘Hillman rollers’ Seryi

Philip Burrows SiD Meeting, Paris 11/02/0811 Solid Edge Model SiD surface assembly considerations (Marty)

Philip Burrows SiD Meeting, Paris 11/02/0812 Sequence of Operations Detector subassembly construction & surface tests –Octants of muon chamber instrumented barrel yoke, barrel Hcal, barrel Ecal –Four sub-modules of EC return flux instrumented with muon chambers, donut Hcal, Ecal –Tracker, vertex and FCAL packages Surface Magnet test –Assemble barrel support and the bottom 5/8 flux return octants –Drop in coil & cover with remaining 3/8 octants –Assemble two door legs and 4 360° (180 °?) plates of flux return –Test magnet and disassemble Lower detector chunks –Reassemble lower barrel iron with supports below ground –Load barrel HCAL and ECAL modules into coil cryostat via threaded beam –Lower loaded coil package and capture with upper barrel yoke segments –Depending on crane capacity  Lower fully assembled door  Lower door pieces, the last plate with the Endcap Ecal & Hcal, and reassemble Tracker, VXD and FCAL installed below ground at end ‘Surface assembly seems ok, but will require careful planning’

Philip Burrows SiD Meeting, Paris 11/02/0813 Surface assembly parameters (Marty) M-TonsStainless HCAL RadiatorTungsten HCAL Radiator BarrelEndcap x2BarrelEndcap x2 EM Cal HCAL Coil Iron2966/8= /4= /8= Support x 2 (each ~5%Fe) Total to LowerLoaded Coil=573 Assembled Door=2402 Loaded Coil=542 Assembled Door=1479 Shaft Diameter(m) 8.3m m

Philip Burrows SiD Meeting, Paris 11/02/0814 M-TonsStainless HCAL RadiatorTungsten HCAL Radiator BarrelEndcap x2BarrelEndcap x2 EM Cal HCAL Coil Iron2966/8= /4= /8= Support x 2 (each ~5%Fe) Total to LowerLoaded Coil=573 Assembled Door=2402 Loaded Coil=542 Assembled Door=1479 Shaft Diameter(m) 8.3m m Surface assembly parameters (Marty)

Philip Burrows SiD Meeting, Paris 11/02/0815 M-TonsStainless HCAL RadiatorTungsten HCAL Radiator BarrelEndcap x2BarrelEndcap x2 EM Cal HCAL Coil Iron2966/8= /4= /8= Support x 2 (each ~5%Fe) Total to LowerLoaded Coil=573 Assembled Door=2402 Loaded Coil=542 Assembled Door=1479 Shaft Diameter(m) 8.3m m Surface assembly parameters (Marty)

Philip Burrows SiD Meeting, Paris 11/02/0816 M-TonsStainless HCAL RadiatorTungsten HCAL Radiator BarrelEndcap x2BarrelEndcap x2 EM Cal HCAL Coil Iron2966/8= /4= /8= Support x 2 (each ~5%Fe) Total to LowerLoaded Coil=573 Assembled Door=2402 Loaded Coil=542 Assembled Door=1479 Shaft Diameter(m) 8.3m m Surface assembly parameters (Marty)

Philip Burrows SiD Meeting, Paris 11/02/0817 M-TonsStainless HCAL RadiatorTungsten HCAL Radiator BarrelEndcap x2BarrelEndcap x2 EM Cal HCAL Coil Iron2966/8= /4= /8= Support x 2 (each ~5%Fe) Total to LowerLoaded Coil=573 Assembled Door=2402 Loaded Coil=542 Assembled Door=1479 Shaft Diameter(m) 8.3m m Surface assembly parameters (Marty)

Philip Burrows SiD Meeting, Paris 11/02/0818 M-TonsStainless HCAL RadiatorTungsten HCAL Radiator BarrelEndcap x2BarrelEndcap x2 EM Cal HCAL Coil Iron2966/8= /4= /8= Support x 2 (each ~5%Fe) Total to LowerLoaded Coil=573 Assembled Door=2402 Loaded Coil=542 Assembled Door=1479 Shaft Diameter(m) 8.3m m Surface assembly parameters (Marty)

Philip Burrows SiD Meeting, Paris 11/02/0819 BDS IR-related CF&S master table

Philip Burrows SiD Meeting, Paris 11/02/0820 SiD inner IR layout 305 mm OD Cryostat 512 mm OD Cryostat 70mm x 1.7m AntiSolenoid Cryostat 60cm OD Support Tube 38cm OD Support Tube Space to Open Door Beampipe

Philip Burrows SiD Meeting, Paris 11/02/0821 Force neutral anti-solenoid: (Parker)

Philip Burrows SiD Meeting, Paris 11/02/0822 QD0 + QDEX1A + Anti-Solenoid in Cryostat

Philip Burrows SiD Meeting, Paris 11/02/0823 Plan View - Details

Philip Burrows SiD Meeting, Paris 11/02/0824 Elevation View - Details

Philip Burrows SiD Meeting, Paris 11/02/0825 QD0 Cryostat in L*=3.664m 380mm 3258mm 264mm 370mm 524mm 763mm Beamcal 3.300m Feedback BPM

Philip Burrows SiD Meeting, Paris 11/02/0826 warm smaller detector larger detector smaller L* larger L* common cryostat QD0 QF1 vacuum connection & feedback kicker Seryi

Philip Burrows SiD Meeting, Paris 11/02/0827 Seryi Proposal: Fix 9.6m, L* chosen by Detector Concept: Study Collimation & Optics Sensitivity

Philip Burrows SiD Meeting, Paris 11/02/ mm 2207mm Liquid He Line 25.6mm 30mm SiD r<50cm, L*=3.664 Door Closed

Philip Burrows SiD Meeting, Paris 11/02/0829 SiD r<50cm, L*=3.664 Door Open Liquid He Line

Philip Burrows SiD Meeting, Paris 11/02/0830 Door Closed, Permanent QD0 Liquid He Line Liquid He Line “PACMAN” Shielding CLOSED Door Earthquake “Foot”

Philip Burrows SiD Meeting, Paris 11/02/0831 Door Open, Permanent QD0 Liquid He Line Liquid He Line “PACMAN” Shielding

Philip Burrows SiD Meeting, Paris 11/02/0832 Door QD0 FCAL FCAL/QD0 Supported with Door Closed

Philip Burrows SiD Meeting, Paris 11/02/0833 FCAL QD0 DoorRail Extensions FCAL/QD0 Supported with Door Open

Philip Burrows SiD Meeting, Paris 11/02/0834 Detail of beampipe (red) - ongoing

Philip Burrows SiD Meeting, Paris 11/02/ mm Beam Pipe and VXD Detail

Philip Burrows SiD Meeting, Paris 11/02/0836 Three beampipe shapes have been considered over time for SiD Flat at 12mm for VXD, flared to O.D. of Lumical z min = 1.68m of endcap ECAL Flat at 12mm for VXD, flared to I.D. of Lumical z min = 1.68m of endcap ECAL Flat at 12mm for VXD, flared rapidly to clear pair stay free until r=86.5mm (r min of z min = 1.68m), then cylindrical In all cases, beam pipe then becomes conic and follows inner surface of mask until beampipe

Philip Burrows SiD Meeting, Paris 11/02/0837 Conceptual Solution for R20 Mechanics is Needed Support points Bellows Flanges Alignment and adjustment features Vacuum features (if any) at z<7m (end of QD0 cryostat) Cable & Gas service routing Rethinking of access requirements in PUSH-PULL –On-beamline access for rapid repair –Off-beamline access for VXD or TRACKER replacement

Philip Burrows SiD Meeting, Paris 11/02/0838 Summary GDE RDR BDS baseline comprises a conceptual model of MDI based on push-pull + surface assembly MDI complex area requiring careful design Self-consistent conceptual scheme for SiD MDI has been developed IR engineering workshop September 2007 Engineering, engineering, engineering! ‘macroscopic’: buildings, shafts, caverns, cranes … ‘microscopic’: beampipes, valves, bellows, flanges …