Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Will CO2 Change What We Do?
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Overview of Loss of Load Expectation (LOLE) and Unforced Capacity (UCAP) Dan Huffman FirstEnergy Solutions November 20, 2007 OMS Board Workshop Resource.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
A Summary on Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
06/04/2009 TAC 2009 Long-term Demand and Energy Forecast (LTDEF) and Capacity, Demand and Reserves (CDR) Calculation Dan Woodfin Director, System Planning.
Generation Adequacy Task Force Results of the 2012 Loss of Load Study January 18, 2013.
NERC LTRA Update / CDR Capacity Counting Issues
Electric Power System Reliability GRIDSCHOOL 2010 MARCH 8-12, 2010  RICHMOND, VIRGINIA INSTITUTE OF PUBLIC UTILITIES ARGONNE NATIONAL LABORATORY Prof.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
EE 590 Reliability (LOLE) Evaluation for Generation & Transmission Adequacy Brandon Heath October 27 th 2008.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Energy Analysis Department Cost-Effectiveness Valuation Framework for Demand Response Resources: Guidelines and Suggestions Chuck Goldman Lawrence Berkeley.
Power System Research, Inc. Review of the PNW Adequacy Standard Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
The Council’s Approach to Economic Risk Michael Schilmoeller Northwest Power and Conservation Council for the Resource Adequacy Technical Committee September.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
1 PNW Regional Contingency Resources Resource Adequacy Technical Committee April 6 th, 2011.
2010 Work Plan Steering Committee January 29, 2010.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Electric Power System Reliability
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Chuck Goldman Lawrence Berkeley National Laboratory
Database Fields for DR PNDRP January 2014.
Michael I. Henderson ISO New England Inc.
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Economic Adequacy Standard
Pacific Northwest Resource Adequacy Assessment
Technical Committee Meeting January 27, 2012
Capacity Analysis in the Sixth Plan
Planning Reserve Margin
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009

PNW Resource Adequacy Technical Committee Meeting2 NERC Survey Results

January 23, 2009PNW Resource Adequacy Technical Committee Meeting3 NERC Survey Results

January 23, 2009PNW Resource Adequacy Technical Committee Meeting4 NERC Probabilistic Metrics Loss of Load Probability (LOLP): –The probability of load demand not met in a given hour. (Midwest Planning Reserve Sharing Group (PRSG)) –The probability that load (above a certain threshold) will not be met over a season (Northwest Power and Conservation Council); most analyses would term this an LOLE evaluation Loss of Load Expectation (LOLE): –∑ of multiple LOLP values (usually over peak hours) over a certain period of time. (Midwest PRSG) –A loss of load event is described as any single hour or group of consecutive hours where load exceeds available resources. For example, 1 hour alone of unserved energy constitutes a LOLE just as 5 consecutive hours of unserved energy constitutes an LOLE. (ERCOT) Expected Unserved Energy (EUE): –∑ of hourly curtailments across all iterations of the stochastic simulation (ERCOT), expressed as average MWHs over 10 years

January 23, 2009PNW Resource Adequacy Technical Committee Meeting5 NERC Possible Common Methods Curtailments Measured –LOLP can be measured at the peak hour for 260 days (excluding weekends), for 360 days, over all hours of a season, over all 8760 hours in a year –LOLE is ∑ of LOLP over time –EUE is typically synonymous with Energy Not Served [ENS], measured in MWh, across all iterations of the stochastic simulation What is a Loss of Load (LOL) Occurrence? –Single instance in ability to serve firm load Sometimes the LOL occurrence also includes operating reserves Methodology may allow activation of Emergency Operating Procedures to avoid LOL occurrence –∑ of curtailments over period. In Northwest, season is not counted as an LOL occurrence unless curtailment is above minimum energy or capacity threshold

January 23, 2009PNW Resource Adequacy Technical Committee Meeting6 NERC Survey Conclusions Good reasons for different analyses: –Resource mix: e.g. large amounts of energy- limited resources dictate different analysis than in a capacity constrained system –Transmission limitations: deliverability needs to be considered if system with significant congestion –Lack of fuel diversity: evaluate whether fuel transportation/ storage is a reliability issue Does LOLE target of 0.1 day imply the same level of reliability for all Regions? Need to speak a common language  Definition of Best Practices for Resource Adequacy Assessment