Workshop on Tools for Risk Mitigation in Clean Infrastructure Projects The Plantar Project Alexandre Kossoy CF Unit - World Bank November 19-20, 2003.

Slides:



Advertisements
Similar presentations
Development of a Mongolian MBS Market Workshop on Housing Finance 28th June 2011 Presented by Jim France.
Advertisements

Introduction To Credit Derivatives Stephen P. D Arcy and Xinyan Zhao.
INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
1 Foreign Exchange Liquidity Facilities World Economic Forum - Financing for Development Workshop Tuesday, October 26, 2004 São Paulo, Brazil.
Factoring & Forfaiting
DnB and Brazil Seminar 15 September Why Brazil Vast natural resources and familiar industries Oil and Gas Shipping and ship building Energy Pulp.
Government Export Financing Programs.  Ex-Im Bank is an independent agency of the U.S. government.  The overall purpose of which is to: -Aid in financing.
TAKE YOUR BUSINESS GLOBAL International Trade. Why Should You Export?
What is the ADF Partial Risk Guarantee? Partial Risk Guarantees (PRGs), also known as political risk guarantees, cover private lenders and investors against.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
Chap. 1 The Study of Financial Markets Financial Markets – A Definition: –Markets in which funds are transferred between savers (investors) and borrowers.
Brazil: “PLANTAR” Project Sustainable Fuelwood and Charcoal Production and Substitution of Coke in Pig Iron Production Sao Paulo November 21, 2002.
Carl Johnson Financial Literacy Jenks High School.
Chapter 15 International Business Finance Key sections –Factors affecting exchange rates –Nature of exchange risk and types –How control exchange risk?
Chapter 15 International Business Finance Key sections –Factors affecting exchange rates –Nature of exchange risk and types –How control exchange risk?
International Finance Chapters 12, 13, and 14 Foreign Exchange Exposure.
Workshop on Climate Change Issues jointly organized by KEMCO, NREL and CONAE 1 st December, 2003, Milan, Italy Role of ESCOs in reducing GHG emission.
CDM: A Catalyst for Renewable Energy in Developing Countries? Lessons from Early Projects Veronique Bishop, Franck Lecocq World Bank, Carbon Finance Business.
CHAPTER 8 A framework for interpretation
Thomas Hill, VP Union Bank of Caliornia ph , 1 What is Export Finance? Financing support to assist exporters in.
Balance of payments. The current account Different from a personal current account and refers to trade in goods and services Is in 4 parts; trade in goods.
Global Financial Services Outline –Why and how U.S. banks engage in international banking –Foreign banks in the U.S. –International lending –Foreign exchange.
Annual Meeting of the Host Country Committee on Carbon Finance Washington D.C. February 15-16, The World Bank Carbon Funds:
INNOVATIONS IN THE PRIVATE SECTOR RESPONSE TO CLIMATE CHANGE AND THE AFRICAN CARBON MARKET DEVELOPMENT Lloyd Chingambo Seventh African Development Forum.
Swaps Copyright 2014 Diane Scott Docking 1. Learning Objectives Describe an interest rate swap Understand swap terminology Be able to set up a simple.
Overview of BioCF ERPA terms December 15, 2005 The World Bank, Washington, DC.
Financing Urban Public Infrastructure
AS Economics. 1. Unemployment List different types of unemployment Comment on which are the easiest and hardest to solve.
Econ – Chapter 13 – Outline #1. I. Savings and Financial System = An economic system must be able to produce capital if it is to satisfy the wants and.
Is a Financial Institution controlled by the Italian Ministry for Economic Development, participated by leading Italian Banks and Confindustria – the.
George McAllister ext The SBTDC is a business advisory service of The University of North Carolina System operated.
The International Financial System
2011 PK Mwangi Global Consulting Financing your business The key to acquiring funding will depend on the structuring and presentation of the business plan.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
Cash Flow for Emerging Companies. Our Mission To provide a complete package of financing and services for qualified companies at a competitive cost enabling.
Barriers to the Financing of Leasing in Ukraine A personal view of Martin J. Elling 21 February 2006.
Managing Risk and Uncertainty in Carbon Finance Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30.
How can CDM help project finance? Jan-Willem Martens, Bangkok, 5 April, 2005.
Understand financial markets to recognize their importance in business. Types of financial markets Money market, Capital market, Insurance market,
Obtain Finance. Types Finance Secured Finance – Finance is given in return for security over an asset – The security is a guarantee that lender has first.
Managing carbon project risks Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
Kenneth Langer, Ph.D. Global Environmental Investment Group Washington, D.C Insurance Mechanism To Facilitate Financing of Energy Efficiency Projects.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
Potential for Carbon Finance in Agriculture and Forestry Katoomba V, Tokyo Forest Trends November 5 th, 2002.
International Trade. Balance of Payments The Balance of Payments is a record of a country’s transactions with the rest of the world. The B of P consists.
Financing Structures and CDM Project Risks Cairo, April 4 th –April 5 th, 2005 TIMS/EEAA Fertilizers Workshop UNEP RISOE / APEXFinancing Structures and.
GHSGT Review Economics. Unit 1 – Fundamental Concepts of Economics.
Doing Business With OPIC. OPIC’s Mission Statement “To mobilize and facilitate the participation of the United States capital and skills in the economic.
CHAPTER EIGHT Asset-Backed Securities, Loan Sales, Credit Standbys, and Credit Derivatives: Important Risk Management Tools for Banks and Competing Financial-Service.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Carbon Finance Strategy the World Bank Carbon Finance Strategy the World Bank CHARLES CORMIER Sept 2005.
Public Private Partnerships (PPPs) and The World Bank
© ESD 2003 IRIS KYOTO Achieving Carbon Finance: Carbon Funds and key issues (Including European Emissions Trading Scheme) Jeremy Doyle ESD, UK European.
The Foreign Exchange Market & The Global Capital Market.
Carbon Revenue and MFIs: Making it Work Marco van der Linden Ramesh K. Gautam.
LEASING. A Contract whereby the owner of the asset (The Lessor) grants the exclusive right to another party( The Lessee) to use the asset for an agreed.
Things to Know About the World Bank Carbon Finance (CF) 10
Shopping for an Automobile Loan What Do I Need to Know? Using Financial Calculators.
15 International Operations © 2012 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale.
Forests & The Resource Curse The Anatomy of A Forest Destruction 1.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Incorporating Carbon Finance into Operations Integrating Carbon Finance in the Bank’s Work November 19, 2001.
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
AEBF ANNUAL MEETING India, November 2014 THE VIETNAM DEVELOPMENT BANK- VDB.
E XPORT -I MPORT B ANK of the U NITED S TATES E XPORT -I MPORT B ANK of the U NITED S TATES Jobs Through Exports Export-Import Bank Intro & Medium-Term.
West and Central Africa Tropical Forest Investment Forum - August 2007 © EnviroMarket Ltd Forest-Backed Securities: alternative finance for tropical natural.
Debt relief.
HEDGING :Short hedge , Long hedge and Perfect hedging
Chapter 5 The International Financial, Political, and Legal Environment.
Presentation transcript:

Workshop on Tools for Risk Mitigation in Clean Infrastructure Projects The Plantar Project Alexandre Kossoy CF Unit - World Bank November 19-20, 2003

The Company: Plantar S.A.  Founded in reforestation (and charcoal production) due to tax incentives  Expertise led to advisory opportunities  Investment in genetic engineering (high-yield clones)  In pig iron (to metallurgy / foundry industries)  In FSC’ certified charcoal (export market)  Nowadays, Plantar income mainly with service (reforestation for the major Brazilian pulp producers)  30% of Brazilian annual forest plantation (~60k ha/year)

Pig Iron Activity Mineral Iron Charcoal (vegetal) Coke (mineral) + Pig Iron = Foundries Steel Mineral Iron + = Pig Iron Independent producers Integrated producers Pig Iron Sales Own production

Company / Sector Analysis (w/o the project)  Revenues USD 52 MM in 2001 (guarantees)  Almost no leverage (conservative management)  Low cost producer (profitable)  Long track-record (recognized expertise in the Market)

Company / Sector Analysis (cont.)  Non traditional client  Small player in the metallurgy industry  Risky sector  Family owned domestic player (annual exports insufficient for DSCR and hedge for a USD loan; non-audited numbers)  Small deal (high lender’s preparation cost; probably low ROS)  Long cycle with no income up the 7 th year (low IRR / long pay-back / unbankable: 10-y loan with 7-y grace period for repayment) … a new component : GHG ERs …

Project Objective: To make sustainable charcoal production a viable alternative to coke in the pig iron industry  Project:  Sustainable managed Eucalyptus plantations (FSC certified): 23,100 ha (3,300 ha x 7 years)  Reforestation of pasture land with native forest: 478 ha  Improved Charcoal production in kilns (reducing methane)  Charcoal displacing Coal / Coke in Pig iron production and produced for lump charcoal market in Europe

Project Financing  Entire investment (for newly established plantation): US$34 million  PCF contribution at $3.50/tCO2e = $5.3 million  Other carbon finance potential up to $20 million  Financial Structure  Plantar Equity: $29 million already invested over the years  Seeking new sources up to $5 million (debt financing ?)

ER Generation (ERPA) $ 4,880,000Total loan  Loan amount matches ERPA value less PCF expenses  Loan repayment schedule matches PCF annual payments  “Securitization of the ERPA receivables”

Target structure: Pre-Export Finance Trade finance: repayment through performance (export) of CERs Advantages: lower cost to the borrower (absence of WT 17.64% / 33.33%) for both I and fees. Rabobank CuracaoPCF Rabobank Brazil Plantar I loan P ERs EFEX Contract

However, Ers are not eligible for trade finance in the MERCOSUL… Rabobank Curacao PCF Rabobank Brazil Plantar I EFEX contract loan P ERs (Escrow Account) at Rabobank “Financial” loan fully repaid by the borrower (P + I). Account opened at Rabobank in the name of Plantar for PCF payments. Liberation of the ER payments by PCF after Plantar's repayment to Rabobank. + P Alternative for the Plantar Case

Main Risks and mitigants identified Credit risk: the pig iron industry was considered very risky and the competitive advantage of the project sponsor’s activity was not evident to the lender. Mitigant: The payments for the ERs were not linked to the industrial activity but, to the annual sequestration of GHG during the Eucalyptus’ growth. Due to the very cheap and easy maintenance of the forests after its implementation, almost no delivery risk lefts after the 1 st year (i.e. credit risk was highly mitigated). Replicability: Several deals in the BioCarbon Fund may take advantage of this feature.

Main Risks and mitigants identified Credit risk: the sponsor, a Brazilian company operating domestically, becomes highly exposed to local currency fluctuations if indebted in hard currency loans. Mitigant: The ER payments in hard currency result in a natural hedge for the sponsor and drastically reduces its exposure to the local currency devaluation. Replicability: This specific risk mitigation is extremely relevant for all CDM sponsors whose operate in the domestic markets but want to have access to cheaper international loans.

Main Risks and mitigants identified Credit risk: despite low, charcoal export revenues are subject to non- payment risk. (Special risk for exports of goods to other developing countries, exposed to the same economic risks of the exporter - not applicable for this case). Mitigants: WB is a risk-less buyer in a risk-less Country (AAA). Replicability: All CDM buyers are companies based on Annex I Countries, and operate with the most solid currencies (i.e. “hard currencies”). These countries effectively have the lowest sovereign risk rates given by the international financial institutions.

Main Risks and mitigants identified Country risk: local government’s acts which do not enable the loan repayment in hard currency (i.e. local currency convertibility to hard currency and transfer overseas). Mitigant: PCF payment directly in the lender’s account. Exporters may have a natural protection against this risk if buyers agree to pay for the goods directly in the lender’s account abroad. However, for the full offset of this risk the Country origin of the buyer must have a developed financial system and legal framework to be recognized as a low risk Country, as the Countries of the Annex I, and as in the item above, this is a natural advantage of CDM projects.

Main Risks and mitigants identified Country risk: Confiscation of goods, Expropriation of assets or Nationalization of the goods, threatening the sponsor capacity to produce the goods and export them. In order to mitigate these risks, lenders may have to buy the “CER risk insurance” in the market, in order to offer loans in developing countries. Its price is always passed to the borrower, increasing the all-in cost of the loan. Mitigant: LNO signed by the government and Kyoto ratification (BR). Replicability: The signature of the LOA by the Designated National Authority evidences the host country compliance to the CDM rules. After that, and due to the intangible nature of the carbon credits, there is a minimal chance of government interference in the production and remission of the ERs to their buyers.

Main Risks and mitigants identified Country risk: the project had a “construction phase” of 7 years before generating cash to repay a loan[(i.e. 7-y grace period loan). Additional 3 years would be required by the project to fully repay the loan. However, the maximum tenor allowed for uncovered Country risk’s loans in Brazil was 2 years in the 2ndH’01 and due to the events of 09/11, there was no Country risk insurance available for Plantar for such time period (10 years), at any price. Therefore, the project was unbankable.[ Mitigant: The absence of cash convertibility and transferability, plus the intangibility of the carbon credit (i.e. absence of the CER risk), allowed the transaction to be rated by the lender as a “Country risk free” export transaction.

Main Risks and mitigants identified Replicability: the above-mentioned points, the loan to Plantar deal only became possible due to the full Country risk offset by the ER component. In addition, the strong credit risk mitigations also resulted in a substantial reduction in the commercial bank’s interest pricing to the borrower. The same rational is expected for all other CDM deals worldwide.

Loan Structure  6-y loan (2-y grace period for P), with almost 5-y duration  All-in cost to Plantar lower than L + 5%  ROS to Rabobank higher then 65%