PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
Advertisements

PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
PHENIX WEEKLY PLANNING 9/7/06 Don Lynch. 9/7/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 11/30/06 Don Lynch. 11/16/06 Weekly Planning Meeting 2 PHENIX END OF SHUTDOWN PARTY Celebrating the successful installation of.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/31/06 Don Lynch. 7/31/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
Preparations for Run 6 Don Lynch February 13, 2006.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 8/20/2009 PHENIX WEEKLY PLANNING 8/20/2009 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 8/31/06 Don Lynch. 8/31/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 8/24/06 Don Lynch. 8/24/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
Presentation transcript:

PHENIX WEEKLY PLANNING 10/05/06 Don Lynch

10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006 Pre Shutdown Tasks5/1/2006DONE End of Run 66/27/2006DONE Shutdown Preparations6/27/2006DONE Detector Upgrades7/19/200610/19/2006 Planned electrical power outage7/24/2006DONE Subsystem maint/repair tasks7/19/200610/10/2006 Building and infrastructure tasks5/1/200610/31/2006 E carriage roll in & setup10/23/200611/10/2006 RHIC Cooldown Begins12/1/2006 Run Prep11/20/200612/31/2006 Shutdown Concluded Start Physics Run1/1/ Assumes 12/1 start of cooldown

10/05/06 Weekly Planning Meeting 3 TOF West Mechanical Installation Complete Cables Run Rack Modifications complete Gas supply control system (mixing house) in progress Electronics installation in progress Testing and commissioning to be completed

10/05/06 Weekly Planning Meeting 4 RXNP Mechanical installation Complete Cables run Rack plumbing, power Complete Electronics installation in progress Testing and commissioning to be completed

10/05/06 Weekly Planning Meeting 5 HBD Mechanical Installation HBD West Complete HBD West Cables Run Testing and commissioning to be completed HBD East now at Stony Brook due here 10/18/06; mechanical installation to be completed by 10/20/06 Cooling & Bakeout heater systems to be installed Gas Hutch renovation ongoing

10/05/06 Weekly Planning Meeting 6 Still Needed for Approval to Operate: Where will fan(s) be mounted? – CM base “cubby hole” fan model and specs to be forwarded to Safety Written design and operation description and– To be forwarded to Safety Order for 5 blowers & drivers (4 +1 spare) is in the works HBD (Hadron Blow Drier) Electronics Cooling Blower requirements: 5 cfm (142 5 in WC (1245 Pa)

10/05/06 Weekly Planning Meeting 7 HBD “EBO” Heaters Needed for Approval to Operate: Report detailing design and operation– To be forwarded to Safety Heater Controls Control wiring Heaters

10/05/06 Weekly Planning Meeting 8 HBD Signal Rack Cutouts for signal cables To Be completed by 10/13 Signal cables routed down east side of crate covered by “chimney”

10/05/06 Weekly Planning Meeting 9 HBD Signal Rack 1. Modify tray and rack side panel 2. Add ¼” top plate/cover 3. Add 4” chimney Parts are done at Central Shops. To be picked up.

10/05/06 Weekly Planning Meeting 10 HBD Signal Rack 4. Existing connecting member for “U”-tray to be removed 5. Internal supports replace connecting member and supply support for the ¼” thick top cover/step

10/05/06 Weekly Planning Meeting 11 StartComplete TOF West Electrical, modify/upgrade rackin progress10/13/06 Commissioningin progress10/13/06 RXNP Electrical, rack integration: water & powerin progress10/13/06 Commissioningin progress10/13/06 HBD Electrical cables, rack integration: water & powerin progress10/13/06 Gas Plumbingin progress10/13/06 East pre-survey10/12/0610/16/06 East mechanical installation (incl. final survey)10/16/0610/17/06 East cable trays10/17/0610/18/06 HBD preamp cooling system9/5/0611/1/06 HBD drying heater system9/5/0610/6/06 Commissioning9/25/0611/31/06 Remaining Schedule

10/05/06 Weekly Planning Meeting 12 StartComplete MPC North Mechanical installation9/13/0610/13/06 Electrical, modify/upgrade rack9/25/0610/13/06 Commissioning9/29/0610/31/06 PC HV module and cable maintenance 10/24/0610/31/06 TEC maintenance & Repairs in progress10/13/06 MuID survey10/20/0610/27/06 MuID commissioning 11/22/0611/29/06 Remaining Schedule (cont’d)

10/05/06 Weekly Planning Meeting 13 MPC North Mechanical installation in progress should be complete early next week Driver boards are ready Crate installation & cable routing next week Testing and commissioning

10/05/06 Weekly Planning Meeting 14 MPC North Cable Routing Unistrut Crate Support MPC North Crate

10/05/06 Weekly Planning Meeting 15 MPC North Cable Routing Crate supported on unistrut west of north crossover 2. Cables routed to tray under north crossover platform 3. Cables routed in tray mounted to MMN top lampshade 4. Cables run down from top of station 1 into Piston Cavity and connect to MPC driver boards 4

10/05/06 Weekly Planning Meeting 16 Subsystem Maintenance & Repairs PC HV module/cable maintenance later this month TEC upgrades on going MuID survey/commissioning next month

10/05/06 Weekly Planning Meeting 17 Infrastructure Work CAD/RHIC PHENIX infrastucture related mechanical and electrical support Roof leak repairs ? MuID survey ? EMCal Survey ?

10/05/06 Weekly Planning Meeting 18 Remaining Schedule (cont’d) StartComplete East carriage roll in & setup Prepare IR & EC for move to IR/move cart, manlifts, collars23-Oct31-Oct EC Roll in1-Nov2-Nov Connect EC services3-Nov10-Nov Install EC Ladder3-Nov10-Nov Install EC rear access & ext.3-Nov10-Nov Move MMS full North/Install beam pipe collar20-Nov22-Nov Rebuild Rolling door27-Nov30-Nov Close rolling door30-Nov RHIC Cooldown Begins1-Dec Pink Sheeting & Blue Sheeting4-Dec15-Dec Start Flammable Gas Flow18-Dec All Up Commissioning18-Dec22-Dec Beam in yellow ring25-Dec Beam in blue ring1-Jan RHIC beam conditioning1-Jan8-Dec Shutdown Concluded/Start of Physics Run8-Jan

10/05/06 Weekly Planning Meeting 19 SEU Test John Lajoie Iowa State EIS to be prepared by ISU Possible locations: 1. under lift table (may interfere with other CM access) 2. Southwest pole face (mechanical support needed)

10/05/06 Weekly Planning Meeting 20 Next Week MPC N installation complete HBD & RXNP rack wiring and electrical tests cont’d HBD signal rack chimney/ladder complete HBD presurvey HBD & TOF W mixing house gas control systems TEC repairs MPC N Cable path/trays complete Bridge utility electric, signal & fibers to control crate Finish TEC?

10/05/06 Weekly Planning Meeting 21 Bridge Signal Cable trays

10/05/06 Weekly Planning Meeting 22 Tier I Inspection No major faults recorded Rack room; Plastic cable tray hanging, double sided tape failed Electronics test area: Rolling rack & bench are blocking disconect switch: Move rack & bench & tape stay clear zone on floor Electronics test area: Electrical box needs knockout plugged

10/05/06 Weekly Planning Meeting 23 Tier I Inspection Eyewash station has disgusting water Laser interlock key should be removed when not in service PHENIX manlifts need current inspection tags

10/05/06 Weekly Planning Meeting 24 Tier I Inspection Mixing house computer room: Signal cable knockout needs grommet Hacksaw power cable plug needs strain relief Gas pad restricted area sign is faded. Replace with 2 new signs at north and south ends of hut Other items noted: 1. PASS crash button southeast corner of IR protected by duct tape roll 2.Internet hubs in Rack room and trailer offices need security cage?? 3.LN2 tank still needs stencilling

10/05/06 Weekly Planning Meeting 25 Links for the shutdown schedule as well as weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found from the web site: Where To Find PHENIX Technical Info