PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.
2006/9/25-26 ILCDR06, Cornell University 1 DESIGN STUDY OF A MOVABLE COLLIMATOR WITH LOW BEAM IMPEDANCE Yusuke Suetsugu*, Kyo Shibata KEKB Vac. Group Introduction.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
01/07/2005 SN 1 of 16 Esti mation of HOM Power in the Interaction Region of ILC Sasha Novokhatski Session “Beam RF Effects” ILC MDI Workshop SLAC January.
1 M. Woods, SLACMDI SLAC WORKSHOP Machine-Detector Interface at the International Linear Collider Jan. 6-8, 2005SLAC Introduction to Topic of.
12/13/2004 SN PEP-II MAC REVIEW 1 of 49 RECENT HOM CALCULATIONS HOM Dampers: Last Measurements and New Computer Designs Sasha Novokhatski PEP-II MAC Review.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Radial Ion Pump, BPMs, & HOM Bellows Machine Advisory Committee Meeting December 14, 2004 Nadine Kurita Machine Advisory Committee Meeting December 14,
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
ILC Damping Rings Mini-Workshop, KEK, Dec 18-20, 2007 Status and Plans for Impedance Calculations of the ILC Damping Rings Cho Ng Advanced Computations.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
Damping Ring ImpedanceK. Bane 04/05/2007 ILC DR Impedance Group At SLAC a group has been meeting bi-weekly for ½ year to study ILC DR broad band impedance.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Plan of Dielectric Loaded RF Cavity K. Yonehara APC, Fermilab 3/25/111MAP Friday Meeting, K. Yonehara.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
Coherent wave excitation in a high current storage ring.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
XFEL beamline loads and HOM coupler for CW
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
MDI: Trapped modes and other power losses
Vacuum System Failures at HERA
CEPC Vacuum System Dong Haiyi 2017/11/5.
The PEP-II Interaction e+e- Factories Workshop
Challenges for FCC-ee MDI mechanical design
PEP-II Status and Plans e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Presentation transcript:

PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski SLAC

SN 15-April-2004 PEP-II MAC Session 2 More LER & HER currents – more HOM Heating LER ring –TSP feed-through & Bellows –Vacuum pumps & NEGs (new) HER ring –Bellows (new) Interaction region –Vertex bellows & near bellows

SN 15-April-2004 PEP-II MAC Session 3 Fight against high temperatures Water and air cooling –Fans for bellows in all LER and HER regions –Special cooling for vertex bellows Damping High Order Modes by water cooled RF absorbers –HOM absorber in LER arc chamber Improving RF screens

SN 15-April-2004 PEP-II MAC Session 4 HOM measurements and computer simulations HOM spectrum measurement: –Signals from BPMs –RF antenna near TSP feed-through –RF antenna near HV cable in vacuum pumps HOM power measurement: –Thermocouples on input and output water cooling system with water-flow measurement Computer simulation: –Calculations with MAFIA and other wake field programs

SN 15-April-2004 PEP-II MAC Session 5 HOM absorber in region 4 HOM Absorber TSP 1162 Bellows 2012

SN 15-April-2004 PEP-II MAC Session 6 Absorber: ceramic tiles with large loss tangent and water cooling tube

SN 15-April-2004 PEP-II MAC Session 7 Effect of absorber on TSP feed-through Temperature LER current Nov Apr. 2004

SN 15-April-2004 PEP-II MAC Session 8 TSP in the next arc chamber 1153 Nov Apr. 2004

SN 15-April-2004 PEP-II MAC Session 9 Analog TSPs in region 12 do not have high temperatures Artem Kulikov HOM detectors installed in June 2003

SN 15-April-2004 PEP-II MAC Session 10 HOM spectrum measurement: antenna and spectrum analyzer near TSP 1163

SN 15-April-2004 PEP-II MAC Session 11 HOM power measurement: digital water flow meter and thermocouples

SN 15-April-2004 PEP-II MAC Session 12 Power relations Now we are here

SN 15-April-2004 PEP-II MAC Session 13 The hottest bellows in the LER LER Bellow 2012 PR04 with ‘super” fan Nov Apr. 2004

SN 15-April-2004 PEP-II MAC Session 14 Examples of RF modes. S. Weathersby Magnetic fieldElectric field

SN 15-April-2004 PEP-II MAC Session 15 Proposal for absorber for arc bellows Copper buttons Absorber tiles Water cooling tubes

SN 15-April-2004 PEP-II MAC Session 16 MAFIA. Stephen Weathersby computation. Comparison of 1-tile thick covered flange absorber with azimuthal 2x3-tile mount and the no absorber Q values.

SN 15-April-2004 PEP-II MAC Session 17 HOM spectrum in IP region.

SN 15-April-2004 PEP-II MAC Session 18 Vertex bellows Bellow Cavity bunch field ‘‘Mode Converter”

SN 15-April-2004 PEP-II MAC Session 19 Vertex bellows. RF Modes. Vertex bellows. RF Modes. Stephen Weathersby computation.

SN 15-April-2004 PEP-II MAC Session 20 Quadruple mode

SN 15-April-2004 PEP-II MAC Session 21 Damping HOMs in vertex bellows. Simulation study by S. Weathersby. Decreasing Q-value of a bellow cavity by placing absorber Best position of absorber. Low Q decreases power dissipation.

SN 15-April-2004 PEP-II MAC Session 22 Power dissipation a bellow cavity

SN 15-April-2004 PEP-II MAC Session 23 Absorber on the one side does not well damp modes!

SN 15-April-2004 PEP-II MAC Session 24 Absorber on the other side. Still not good damping.

SN 15-April-2004 PEP-II MAC Session 25 Absorber on the wall

SN 15-April-2004 PEP-II MAC Session 26 Power in a cavity

SN 15-April-2004 PEP-II MAC Session 27 HOMs in vacuum pumps

SN 15-April-2004 PEP-II MAC Session 28 Vacuum pump (LER PR2:3044) HOM spectrum. Frequency range 0-10 GHz Antenna in HV connector

SN 15-April-2004 PEP-II MAC Session 29 Frequency range 3-6 GHz

SN 15-April-2004 PEP-II MAC Session 30 Q-value estimation

SN 15-April-2004 PEP-II MAC Session 31 RF screen for vacuum pump

SN 15-April-2004 PEP-II MAC Session 32 RF screens for NEGs

SN 15-April-2004 PEP-II MAC Session 33 Other screen

SN 15-April-2004 PEP-II MAC Session 34 Summary More water and air cooling Damping High Order Modes by water cooled RF absorbers Simulation studies on improvement of beam chamber elements and RF screens