1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Chris Channing P.E. Sr Project Engineer NSLS-II Conventional Facilities - Thermal Stability May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Support Update Diane Hatton, Project Support Division Director NSLS-II Project Advisory Committee Meeting May 24-25,
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II Stability Workshop Conventional Facilities Temperature Stability Chris Channing P.E. Sr. Project Engineer National.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Conventional Facilities Jan Molander Design Manager Conventional Facilities December 10, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
CONVENTIONAL FACILITIES STATUS
Conventional Facilities (WBS 1
Details supporting the increase
CONVENTIONAL FACILITIES
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007

2 BROOKHAVEN SCIENCE ASSOCIATES Outline CD-1 Review Scope WBS Advance Procurements CR Impacts Organization Schedule Cost Risks Path Forward

3 BROOKHAVEN SCIENCE ASSOCIATES CD-I review was generally very favorable Relevant CD- I review recommendations Increase CF Contingency to reflect construction volatility Look at alternatives to HD concrete for shield wall Add ratchet wall shield doors for front end access Maximize use of existing facility space Consider compact booster vs in-tunnel Support additional beamlines in base scope CD-I Review - December 2006

4 BROOKHAVEN SCIENCE ASSOCIATES CD-I review scope impacts Opted for Compact Booster instead of in-tunnel Adds ~15 ksf + more power/utilities requirements Reevaluated shielding criteria Enabled elimination of most shield wall HD Concrete Added 60 ratchet wall shield doors Eliminated CLOB – will use existing NSLS Reduces by ~46 ksf – now depend on NSLS space Increased # & size of LOB ’ s in base scope Adds net ~ 63 ksf – for beamline support Scope

5 BROOKHAVEN SCIENCE ASSOCIATES CF Technical Performance Goals Structurally stable facility with low vibration (<25nm Rms) Tunnel design that provides required shielding and accessibility Tunnel temperature stability of +/- 0.1 deg C Utility capacity for up to 3.6 GeV operation Utility services & expansion capability to support full beamline build-out Facility layout enabling future long beamlines Experimental Floor noise level <NC60 Design for LEED Certification to meet sustainability requirements (DOE likely to require LEED Gold Rating)

6 BROOKHAVEN SCIENCE ASSOCIATES NSLS LOB Typ 4 1 in Base Scoope, 3 Future RF-LINAC AREA Service Bldg Typ 4 CFN Ring Bldg Future JPsi Future Guest House Future Conf. Center Underpass Loading CLOB Scope at Previous Review

7 BROOKHAVEN SCIENCE ASSOCIATES Current NSLS II Facility Overview Access Tunnel LOB (1 of 3) JPSI NSLS CFN BLOC NSLS II Service Bldgs (1 of 5) CHW Plant Bldg 603 Substation Future LOB ’ s

8 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d NSLS II Floor Plan 1. BLOC – Booster/LINAC/ Operations Center 2. LOB – Lab Office Buildings (3 base scope up to 5 future) 3. Service Buildings (5) 4. RF Area 5. Tunnel Area 6. Electrical Mezzanine 7. Experimental Floor 8. Access Corridor

9 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d Access Corridor Lab-Office Bldg SR Tunnel Experimental Floor Service Bldg 1 st Floor (earlier concept) Electrical Mezzanine (above tunnel)

10 BROOKHAVEN SCIENCE ASSOCIATES Compact Booster 1 st Floor Plan Operations Center Entry Lobby Linac Injection to Booster Booster Injection to Storage Ring

11 BROOKHAVEN SCIENCE ASSOCIATES Compact Booster 2 nd Floor Plan Operations Center Viewing Gallery and Bridge to Control Room Area Linac Klystrons Booster RF, Magnet Power Supplies, Cooling Systems and HVAC Service Areal Control Room Area

12 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Section Ratchet or Shield Wall Electrical Mezzanine Bldg structure Isolated from tunnel and experimental Floor Earth Shield Berm Experimental Floor Access Corridor Tunnel Floor “ Monolithic Joint ” Isolation Joint Isolation Joint or Void Space Tunnel Roof Isolated Pier for Column Isolated Grade Beam

13 BROOKHAVEN SCIENCE ASSOCIATES Facility Program

14 BROOKHAVEN SCIENCE ASSOCIATES WBS 1.5

15 BROOKHAVEN SCIENCE ASSOCIATES Advance Procurements Previous Plan to expedite schedule & reduce risk Early construction package for site preparation Early procurement of HD concrete material for shield wall Prepared advance procurement T-1 packages in Jan 07 Funding for early procurement is not available in FY08 Resolved by elimination of most HD concrete in shield wall HD concrete only needed in injection regions Will try to perform minimal site prep in early FY09 to hedge schedule risk

16 BROOKHAVEN SCIENCE ASSOCIATES Continuing Resolution Impacts Prior Schedule had CD-1 in February, now likely in June Result - Funding for T-I delayed and limited Goal – minimize schedule impacts Approach Establish basic ordering agreement contract with selected A/E [HDR] Issue tasks for Advance Conceptual Design (ACD) to progress investigation of design concepts and alternatives Revise T-I A/E scope to address specific T-I deliverables Result – maintained overall schedule goal of readiness for CD-2 in 1 st Qtr FY08 Lehman review and EIR scheduled for early November

17 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Organization Conventional Facilities Director M. Fallier Design A/E T-I, I, III TBD [C] Asst. Director CF Design Management O. Dyling Commissioning Contractor TBD [C] PE Trade Shop Support – Various [M] Design A/E Subconsultants [C] Construction Management PM Agent CM – TBD [C] I C & C Project Manager TBD Civil Construction Project Manager TBD Building Project Manager TBD Chilled Water Project Manager TBD [M] – Matrixed [C] - Contracted Asst. Director CF Construction Management TBD ESH Manager Design Review Industrial Hygiene Health Physics Construction Safety Admin & Finance Procurement Project Controls Document Mgt Human Resources Information Management NSLS II Project Director S. Dierker CF Advisory Committee J. Hands, Chair Construction Analysts [C] Project Schedulers [C] Field Inspectors [C] Cost Estimators [C] ASD & XFD Technical Interface Managers ASD - E. Johnson, EFD- TBD Site Prep Contractor [C] Building Contractor [C] CHW Contractor [C] Construction Safety Specialists [C] IC&C Contractor [C] Project Architect T. McEvaddy [M] Mech. Engineer G. Leskody [M] Civil/Struct. Engr. T. Joos [M] Elect. Engineer D. Danseglio [M] Sr Mech. Engr. C. Channing [M] ECS Design Supervisor J. Mills [M] QA Manager QA Review

18 BROOKHAVEN SCIENCE ASSOCIATES CF Schedule Title I Design CD-2 Title II Design CD-3 Site Prep. Const. (reduced) Pre-cast Shield Wall Const. Ring Bldg Bid & Award 1st Pentant RFE (Pentant 1) 2 nd Pentant RFE (Pentant 5) 3 rd Pentant RFE (Pentant 2) 4 th Pentant RFE (Pentant 3) 5 th Pentant RFE (Pentant 4) BLOC & 3 LOB ’ s CHW Plant Expansion Mech & Elect Utilities Integrated Ctrl & Comm. Standard Equipment Commissioning Activity FY07FY08FY09FY010FY11FY12 FY13 Begin Accelerator Installation Full Ring Bldg Available for Accelerator Installation Control Room RFE LOB ’ s Complete BO for all CF Construction No LLP

19 BROOKHAVEN SCIENCE ASSOCIATES Cost Estimate

20 BROOKHAVEN SCIENCE ASSOCIATES Risk Assessment Technical Challenges Constructing massive concrete tunnel with reasonable economy Achieving structural stability Vibration mitigation Minimizing differential settlement Achieving thermal stability – Tight temperature constraints for tunnel Assuring interior/exterior thermal gradients don ’ t affect beam Making tunnel available for accelerator installation in phases Cost Risks Cost sensitivity of achieving all of the above Volatile material/construction markets

21 BROOKHAVEN SCIENCE ASSOCIATES Risk Assessment Cont ’ d Schedule Risks Title I & II Engineering are on the critical path Construction of Ring building up to the point that the accelerator tunnel is available for accelerator installation is critical path Any delays to the above may require added cost to remedy Risk registry has been prepared Risk assessment database integrated with cost estimate database Current Contingency allocated for Conventional Facilities ~ 40%

22 BROOKHAVEN SCIENCE ASSOCIATES CF Path Forward Continue driving ACD process to finalize concepts for T-I Freeze accelerator lattice design – Ring bldg footprint Confirm program requirements Confirm siteplan and geotechnical suitability Continue benchmarking study of other LS facilities Continue focused technical studies (vibration, thermal modeling) Expedite award of A/E T-I contract when CD-I is received Execute T-I design plan (Ove will present in detail) Expedite agent CM award for T-I, T-II support services Prepare supporting documents for CD-2