Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
A regulatory framework for gas quality treatment facilities: recap and update.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RG0291 – NTS Licence SC27 – Balancing Arrangements Linepack – Commercial Considerations/Options Review Group 291 – 19 th July 2010.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Energy Balancing Credit Variation Proposal Modification 0233 Transmission Work Stream 5th March 2009 Mark Cockayne.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Review of System Alerts
Review Group 291- Ofgem Update
Exit Capacity User Commitment – Transmission Workstream update
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
NG Strawman – Ofgem Response
Introduction of Code Contingency Guidelines Document
UNC Trader User – Licence obligations
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
NG Strawman – Ofgem Response
NG Strawman – Ofgem response
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Introduction of Code Contingency Guidelines Document
Review Group 291- Ofgem Update
Draft Mod: Update of default System Marginal Prices
Transmission Workstream 2nd December 2010
Consideration of issues raised by UNC Modification Proposal 0244
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 136
Presentation transcript:

Revision of the UNC Post-Emergency Arrangements draft proposal July 2009

2 Background u Numerous proposals* have been made to the UNC Emergency Arrangements in relation to industry concerns  Ofgem’s 0149a decision letter advised it would welcome further proposals on: attracting non-UKCS supplies into the UK, the introduction of dynamic pricing and, mitigating the effects of potentially spiralling prices  National Grid mindful of concerns raised by the community and Ofgem during the progression of 0149/0149a  In February 2009, National Grid initiated an informal review through the Transmission Workstream (workshops) for stakeholders to consider pragmatic changes to the existing UNC post-emergency arrangements * (044 Revised Emergency Cash-out & Curtailment Arrangements; 061 Facilitating further demand-side response in the event that a Gas Balancing Alert is triggered; 0149/0149a “Gas Emergency Cashout Arrangements: Keeping the OCM open during a Gas Deficit Emergency)

3 Workshops u National Grid has facilitated four workshops between February – June 2009; attended by Users and Ofgem u Emergency Arrangements strawman (January 2009 Transmission Workstream) used to facilitate discussion within the workshops u Support from some attendees for the proposed changes however, National Grid is mindful of concerns raised with certain elements e.g. economic price assessment trigger (potential for manipulation), ‘rejected’ claims and nominations/renominations processes u Consideration of those concerns to be reflected in the proposal u National Grid believes that ‘do nothing’ is not an option

4 UNC Emergency Arrangements proposed revisions (1) Emergency cashout prices  No changes are proposed to the derivation of the emergency cashout prices (frozen at Stage 2) Post-Emergency Arrangements In addition to UNC section Q section 4.2.6: e.g. appointment of an individual claims agent:  In order to submit post-emergency claims, shippers will be required to have posted additional supplies and/or demand-side reduction (quantity and price) as offers to sell on the OCM physical market during a GDE  The OCM will display an indicative volumetric weighted average price of all Physical Market offers  Any offers remaining on the OCM at the end of each Gas Day of the GDE may be submitted as potential claims – however, only the Daily Imbalance surplus quantity (for each Gas Day of the GDE) can be claimed

5 UNC Emergency Arrangements proposed revisions (2) u All claims will be subject to a ‘mechanistic’ validation process (matching OCM offer, timing, location, quantity, price, etc) where claimed quantity is greater than Daily Imbalance surplus then scaled-back  a claim that passes the mechanistic validation will then undergo an economic price assessment test (trigger) e.g. price compared against all valid claims  All valid claims will be stacked in descending price order and an 80% factor applied to the total claimed volume: ‘economic price assessment trigger’.  Aggregation of each claimed quantity (lowest price first) within the stack: All claims with their quantity priced below the trigger will be assigned a status of ‘deemed approved’ (for payment); All claims with their quantity priced above the trigger will be assigned a status of requiring further economic price assessment (prior to payment) A claimed quantity might be split by the trigger in which case, the whole claim will be assigned a status of requiring further economic price assessment

6 UNC Emergency Arrangements proposed revisions (3) u Following the application of the trigger, all valid claims together with their status’ will be submitted to Ofgem for its oversight  All submitted claims will default as ‘valid for payment’ after 28 days following the submission date to Ofgem - unless National Grid is advised otherwise within that period  Where National Grid has been advised that a claimed price should be reduced, the User be informed and receive payment at the level of the economic price assessment trigger  In the event that a claimed price is reduced [or rejected], a User will continue to have a ‘right to appeal’ the decision under the existing UNC disputes process

7 UNC Emergency Arrangements proposed revisions (4) u 29 days after National Grid submitted the post-emergency claims to Ofgem, it will calculate a volume weighted average price (vwapec) based on the valid claims (including any scaled-back quantities or reduced prices* )  The User will receive payment for the cost of its claim taking into account any scaled-back quantity and/or reduced claim-price* )  A User with a Daily Imbalance deficit will incur an additional charge based on its deficit quantity * vwapec  Any remaining costs from post-emergency claims will be apportioned over Users based on their throughput  We anticipate that it will take approximately 3 months to process claims in this manner * Claimed price less SAP will be paid/taken into account

8 Advantages The emergency cashout price (s) remain unchanged u Addresses several concerns raised during the progression of 149/149a  Provides non-UKCS shippers with greater confidence they will receive payment for additional supplies of gas  Enhances the existing incentives for a shipper to address its short imbalance position  Utilising the OCM physical market in this manner facilitates the transparency of the prices and costs of gas during an emergency and allows shippers to estimate their commercial exposure  Ring-fences the costs of the emergency and extends the period over which the costs of the emergency are invoiced  Does not require any material changes to the NEC Safety Case nor, impinge on shippers’ obligations to comply with their safety obligations / NEC instructions

9 Disadvantages  Initial apportionment of emergency claim costs against those shippers with a short imbalance following a GDE might be viewed as inappropriate to the extent that a shipper has the ability to mitigate its risk  Utilisation of the OCM physical market during an emergency in this manner might be construed as discriminatory by certain Users e.g. those without physical capability  Delayed timescales for cost recovery (through Claims process) might continue to deter non-UKCS shippers from committing additional supplies to the UK during a GDE

10 Indicative timetable  Send draft Proposal to UNC Mod Panel (July 2009) - recommend to consultation  Final Mod Report August 2009 / Mod Panel  Ofgem decision September 2009  Implementation 1 st October 2009  Develop guideline (process/procedures & economic assessment) July/Oct 2009