National Grid Gas Cost Forecasts to 2013 GDPCR Industry Cost Workshop 19 April 2007.

Slides:



Advertisements
Similar presentations
The Future of the CECA Rail Forum Infrastructure – the state of the market Alasdair Reisner Director of external affairs CECA.
Advertisements

Smarter Travel Programmes– Financial impacts for Transport for London COLIN BUCHANAN
Energy Efficiency Strategy. THE ENERGY WHITE PAPER Energy White Paper sets out four key goals for energy policy to: Cut the UK’s carbon dioxide emission.
Securing a safe, sustainable rail network Michael Roberts Chief Executive.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Mr Kleber Silva – Executive Vice President, Head of Iron Ore - ArcelorMittal group December ArcelorMittal in Algeria at a glance UK- Algeria Investment.
A 2030 framework for climate and energy policies Energy.
Protecting consumers, promoting value, safeguarding the future1 Media briefing – final determinations 26 November 2009.
Change and Renewal Recession & Recovery in Birmingham & Solihull The Churches’ Industrial Group Birmingham Glynn Jones Thursday 10 th June 2010.
GDPCR Costs Workshop WWU’s View on Operating Costs Bob Westlake 19 th April 2007.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Urban Redevelopment and Air Quality in Fushun, PRC Simon Eggleston EU-China Liaoning Integrated Environmental Programme.
Shaping the Future of Water Services
Construction industry forecasts Dr F. Noble Francis economics director.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
COPYRIGHT © 2014 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Protecting consumers, promoting value and safeguarding the future Regulating Privatised Water: Lessons from England and Wales Regina Finn Chief Executive.
Presentation to Carillion The Equipment Rental Specialists 9 th June 2010 The Equipment Rental Specialists Vp plc Final Results for the year ended 31 March.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
AN OVERVIEW OF THE AGRICULTURE SECTOR IN AFRICA T. OLALEKAN WILLIAMS
An Overview of Our Regulatory Proposal
Linking energy and environmental changes through statistics Duncan Millard Department of Energy and Climate Change, UK IAOS.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
Presentation to GDPCR Cost Workshop Alex Wiseman Regulation Director 19 th April 2007.
UK Renewable Energy Policy with particular reference to bioenergy
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Heat and Energy Saving 02 March 2009 John Russell
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
Northwest Power and Conservation Council Draft Plan Proposed Regional Conservation Targets for June 9, 2009.
Greater Manchester Strategy Rebecca Heron and Rod Fawcett GM Integrated Support Team 12 April 2013.
CLOSING THE PROSPERITY GAP KEY POLICY AREAS. THE REGIONAL DIVIDE Greater London GVA- 171% of UK West Wales and Valleys- 72.6% of UK jobs to be created.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
Retro-fitting Commercial Buildings A Financing Perspective Date: April 2011 Prepared by: Carbon Solutions Group.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
Welcome Findings from the Regional Growth into the Low Carbon Study.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
The Privatisation of Royal Mail Presentation to ICEA by David Stubbs.
Input Demand: The Capital Market and the Investment Decision
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
NS4054 Fall Term 2015 North America Energy Trilemma.
The 2006 Energy Review Regional Stakeholder Seminar: Fuel Poverty and Energy Efficiency 31 January 2006 Carl McCamish Deputy Head of Energy Review Team.
Northwest Power and Conservation Council The Role of Energy Efficiency in the Northwest Power and Conservation Plan Tom Eckman Manager, Conservation Resources.
WATER UK CITY CONFERENCE 21 JANUARY 2004 PHILIP FLETCHER.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
IPP Network Meeting London, 7-8 November 2005 A report of the discussions Bob Ryder Department for Environment, Food & Rural Affairs (UK)
Towards a GHG Reduction Strategy for Ontario: Industrial Competitiveness, Investment, Innovation, & Growth September 2010 Canadian Manufacturers.
Emergency Medical Services Department 2014 Budget Overview.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Liepaja September Liepaja September 2008 Restructuring of the Finnish Road Administration Jukka Hirvelä, DG Finnra.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Council Improvement Plan Council Meeting 1 June
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
World Offshore Maintenance, Modifications & Operations Market Forecast World Offshore Maintenance, Modifications & Operations Market Forecast.
South Tyneside Homes The Decent Homes Programme January 2007.
Regional economic performance – Scotland, East of England and the South West.
Asset Degradation Modelling at Townsville Water
Operational Objectives
Development of an Integrated Energy Market in Saudi Arabia
Initial Strategic Business Plan July 2006
Qualitative Scenarios
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

National Grid Gas Cost Forecasts to 2013 GDPCR Industry Cost Workshop 19 April 2007

GDPCR Industry Cost Workshop (FINAL) Page 2 Operating Expenditure We are targeting challenging performance improvements to help mitigate adverse market and workload movements Earnings, contractors & materials Safety related maintenance Emergency Service impact Lower shrinkage and escapes workload

GDPCR Industry Cost Workshop (FINAL) Page 3 Capital Expenditure Load growth and asset renewal requirements drive investment back up to the long-run rate Long Run Average Average Allowance Four major LTS schemes and above ground plant Obsolete business systems network control system, front office systems UK-Link (within xoserve) Stable workloads, efficiency improvements. Restricted expenditure in current period

GDPCR Industry Cost Workshop (FINAL) Page 4 Mains Replacement Expenditure Increased costs reflect contractor prices and the need to tackle the larger diameter risk mains. Further improvements targeted from our four Alliances Contractor demand-driven 2-4% pa Large mains now pose the highest risk per km. Impact mitigated by recycling and “no-dig” Alliance productivity New selection technique agreed with HSE

Mains Replacement Expenditure

GDPCR Industry Cost Workshop (FINAL) Page 6 Mains Replacement - background to GDPCR GDNs have achieved the HSE ramp-up and replacement is now the biggest single activity undertaken Safety driven requirement to remove iron mains within 30 metres of property HSE requirement: “as soon as reasonably practicable” Prioritised annually on a risk basis (“20/70/10”) NGGD decommissions further c80km pa. outside the HSE target (e.g. diversions)

GDPCR Industry Cost Workshop (FINAL) Page 7 Historic Diameter Mix Smaller pipes have presented the highest risk this period and so the programme has been skewed away from a proportionate 30-year profile

GDPCR Industry Cost Workshop (FINAL) Page 8 94 % 89 13/50 % 10 37/50 % 7% of length producing 11% of risk 7% 11% 92 % 83 % 17 % 8% of length producing 17% of risk 8% 17% Large Diameter Mains Larger diameter pipes now represent higher percentage of risk and need to be decommissioned at a proportionate rate (as a minimum) Cavendish Mill. 14/11/01, 15” CI Southall. 22/11/05, 30” CI Newton Heath, 18/11/01, 15” CI June 2006 May 2004 Total Network Length Total Network Risk >12” <=12”

GDPCR Industry Cost Workshop (FINAL) Page 9 Future Diameter Mix BPQ moves closer to a proportionate profile in the next price control period This upward shift in diameter mix towards proportionality increases cost compared with first 5 years

GDPCR Industry Cost Workshop (FINAL) Page 10 Predominantly Victorian Deep excavations Tend to exist in busy thoroughfares Require specialist tools & equipment 40% operate at medium pressure Restricted to summer window More attention to safety Can require non-standard pipe & fittings Require resources with higher skills Needs investment in training Large Diameter Characteristics Numerous reasons why larger mains require more resources per km to replace than smaller pipes

GDPCR Industry Cost Workshop (FINAL) Page 11 Longer Term Demand We do not see evidence for contractor demand softening after 2012/13. Continuing to defer larger mains likely to store up a growing problem Cross Rail Link and Thameslink £10.5billion Transport for London £10billion London and Barts Hospital and Stratford City Development £5billion Water Industry £16.8billion Investment shows no signs of abating (Water UK) London Airport Expansion and Redevelopment £9.5billion National Grid Gas Replacement £1.9billion Power Generation Replacement £8.1billion Transport 2025 Program and Waterloo station redevelopment £11billion 2012 Olympics Infrastructure £3.3billionPost 2012 Regeneration £1billion Network Rail £8billion M25, M1 and M62 Road Widening £3.7billion Investment projected to continue at approximately £2billion per year National Grid Gas Replacement £1.9billion Year

GDPCR Industry Cost Workshop (FINAL) Page 12 Zonal (‘postcode’) Selection BPQ assumes continued productivity improvements (plus customer and environmental benefits) from a move to zonal selection From this (20/70/10 design for Sheffield) To this (zonal design for Sheffield) Key Seed Pipe Sector pipes Productivity delivers c£110m Lost productivity could impact c£60m BPQ submission targets 4% productivity in 2007/8, falling to 1% pa from 2010/11 Continuation of 20/70/10 would lead to reducing productivity as project size deteriorates 0.49 Larger project lengths bring efficiency and customer benefits… Larger scale site operations with dedicated supervision Demonstrable safety improvements Better co-ordination with other utilities and agencies Overall lower environmental impact Proportionally lower mobilisation and demobilisation costs

GDPCR Industry Cost Workshop (FINAL) Page 13 Zonal Now Right for NGG The optimal strategy for smaller mains depends on where a networks’ assets lie on the risk curve Average Risk Score Time top down National Grid “free” zonal High risk and steep risk gradient favours schemes which remove highest risk pipes (“seeds”) Reducing risk levels and gradient results in moderate risk penalty from grouping over five years Efficiency ‘Seeds’ become a progressively redundant concept as the limits of the model are reached zonal & reduced seeds Reducing difference between pipes enables further grouping into sectors zonal & seeds 20/70/10

GDPCR Industry Cost Workshop (FINAL) Page 14 Conclusions Risk dictates that large diameter replacement should ramp-up to be at least proportional to the overall population No benefit in further “holding off” - apart from risk considerations, resource constraints are not expected to ease National Grid’s mains risk profile enables further efficiencies through zonal replacement Short and medium term benefits to consumers We see no reason why condition and customer diversion work should not contribute to the annual total (but will need HSE agreement)

Additional Background Information [Not intended for presentation at the workshop]

GDPCR Industry Cost Workshop (FINAL) Page 16 Industry Timeline Completed Work in progress Transco Response Merger Savings Network Sales The Way Ahead Shared Services Org Alliances Global Line of Business Cont. Improvement Transco Formed MMC Inquiry Centrica Demerger BG Demerger Lattice Accepts Final Proposals Domestic Supply Competition Larkhall Explosion NTS Separated 1 Operation 8 Asset Businesses 8 Networks 90 Districts 13 LDZs 32 Districts Connections Unbundled RESTRUCTURING GROWTH CONTINUAL IMPROVEMENT 25% manpower reduction

GDPCR Industry Cost Workshop (FINAL) Page 17 The 2002 Settlement - Arguably the toughest regulatory targets ever  Capex allowances well below the long term average Average

GDPCR Industry Cost Workshop (FINAL) Page 18 Po cut of 16% Underlying costs 3.7% annual reduction New Safety costs NGGD has broadly achieved underlying opex, but… Average NGGD network

GDPCR Industry Cost Workshop (FINAL) Page 19 Costs in excess of 2001/2 allowance … significant external costs have adversely impacted overall NGGD performance Po cut of 16% Underlying costs 3.7% annual reduction New Safety costs Average NGGD network

GDPCR Industry Cost Workshop (FINAL) Page 20 Concentrations of replacement work in National Grid M1 Corridor Alliance West Midlands Alliance North London Alliance NW Gas Alliance

GDPCR Industry Cost Workshop (FINAL) Page 21 Dronfield, near Sheffield Environmental challenges – pipes replaced in 5-year period under 20/70/10 Red pipes = not replaced Many streets across the town are not replaced, despite NGGD working throughout the town - impact on all

GDPCR Industry Cost Workshop (FINAL) Page 22 Dronfield, near Sheffield Environmental challenges - zonal approach leaves a better legacy Red pipes = not replaced North of town largely complete South of town largely unaffected

GDPCR Industry Cost Workshop (FINAL) Page 23 GDPCR issues - increasing workloads, challenging resource environment and numerous uncertainties Traffic Management Act EU Legislation Legislation Exit / Interruptions Reform Indexation Regulatory Incentives Emergency Service Funding Comparative Regulation Rolling Incentives NGGD PCR Environment Contractor Supply / Demand Ageing Workforce Resourcing Major Maintenance Asset Management Plant Renewal Mains Risk Reduction Safety & Environmenta l Work Contractor Prices Metering Competition Market Factors Key Uncertainties