CIRRUS COTTON CONDITIONER (Patent Pending) A New Methodology for Moisture Addition in the Lint Slide Mark D. Cory.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

Welcome ! Products for: Enclosures • Electronics & Communication •
Neo Hungary Kft. Project: Construction of the Production Facility in ISD Dunaferr, Dunaújváros, Hungary Beginning of the construction: June 2010 Finish.
The Complete Solution Are You Ready?
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
Columbia Machine Core Grinding Team Members Aaron Jeter Jimmie Teague Leland Rutledge Travis Huber Academic Advisor Dr. C. Wern Industry Contacts Mark.
The Dream of One Man In 1919 Sid E. Parker had a dream to start a boiler manufacturing company. To build a company around a quality product and loyal.
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
THE WORLD OF FASHION MERCHANDISING
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Chubaka Producciones Presenta :.
MMEC LLC dba MidwestMetalcraft & Equipment 200 Industrial Drive Windsor, MO Office: (660) Fax: (660)
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Introduction to Facility Planning
DCal Meeting
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
Cotton: From Farm to Fabric A farmer plants the seeds, then cares for the cotton plants and finally harvests the cotton lint.
The Quality Source for Cold Finished Steel Bars. Founded in 1989 by leaders in the manufacturing industry Started in flats, due to customer demand, WPS.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
October 2005 Periodicals Postage Statements in PostalOne!
Process Planning and Computer Aided Process Planning
Chapter 41 Cash, Short-term Investments and Accounts Receivable Chapter 4.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
DUKANE RADIATOR AND SHEETMETAL SOLUTIONS COMMERCIAL KITCHEN MANUFACTURING INFORMATION.
ESB G86 MAE Visiting Committee April 10, ESB G86 Innovation Build Center Provide Conventional and CNC Machining Capabilities Complement Industrial.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
3 - 5 December 2009 Alexander A. Dynkin IMEMO Director.
4 - 1  2001 Prentice Hall Business Publishing Management Accounting, 3rd ed., Atkinson, Banker, Kaplan, and Young Traditional Cost Management Systems.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Process Layout Chapter 7 July 20, 2005.
Robin Lafever1 JDEM Focal Plane Assembly Full-scale Mock up and Cold Plate Engineering model Prepared for Michael Levi and Henry Heetderks JDEM.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Refurbished Booster RF John Reid December 12, 2012.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
ANL CRAB CAVITY JEFFERSON LAB LHC-CC08 BROOKHAVEN FEBRUARY 25, 2008 LARRY TURLINGTON.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Welcome to Odyssey Industrial Systems. 2 Odyssey Today 18,000 Square feet of leased space in two buildings Outsourcing powder coating today; in-house.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
SHREE S’AD VIDYA MANDAL INSTITUTE OF TECHNOLOGY
Production Planning and control – ME 1009 Unit 1 Introduction.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
SELECTION | SAFETY | SERVICE
Internship Presentation
1. The Gardner Pharmacy uses the periodic inventory method
Basics of Garment Manufacturing
An introduction to outlining in PowerPoint
Toy World, Inc. k Analysis of the Case Study Friedrich Roeper Matthias Lohmann 26th of September, 2017.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Potential Milestones A timeline to finish in one year
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
McDonald’s Kalender 2009.
STRUCTURAL FABRICATION SHOP DRAWINGS SERVICES SILICON ENGINEERING CONSULTAT LTD.
Lean Methodology and Building Blocks Kaizen Methodology The 5 Whys
Annual Return in GST.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
McDonald’s calendar 2007.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Circle Chart Template Process Name.
February 2007 Note: Source:.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

CIRRUS COTTON CONDITIONER (Patent Pending) A New Methodology for Moisture Addition in the Lint Slide Mark D. Cory

DESIGN OBJECTIVES ADD MOISTURE TO BATT BATT COMPRESSION HIGH EFFICIENCY LOW MAINTENANCE SIMPLE OPERATION EASILY ADJUSTABLE BY-PASS OPTION

CHEROKEE CIRRUS COTTON CONDITIONER

CHEROKEE BATTERY CONDENSER AND CIRRUS COTTON CONDITIONER SANDY RIDGE COTTON COMPANY MALDEN, MO 2006 GINNING SEASON

STRANDBERG DIGITAL MOISTURE METER M-400 (SHOWN WITH WS-20 PROBE)

STRANDBERG DIGITAL MOISTURE METER M-400 (SHOWN WITH SP-20 PROBE)

RADWAG MOSITURE ANALYZER WPS 110S 110 g max capacity g accuracy

DESCRIBE RADWAG PROCEDURE ASTM D (Standard Test Method for Moisture in Cotton by Oven-Drying.)

DESCRIBE CONDITIONS WHEN SAMPLES WERE TAKEN

CHEROKEE CIRRUS COTTON CONDITIONER TEST DATA (10/12/06 ) SANDY RIDGE COTTON COMPANY – MALDEN, MO BEFORE CIRRUS AVGSD SAMPLE ID (10/12/2006) Start Mass, g Finish Mass, g % Moisture (calc) % Moisture (meter) AFTER CIRRUS SAMPLE ID (10/12/2006) Start Mass, g Finish Mass, g % Moisture (calculated) % Moisture (meter) % Moisture Added (calculated) % Moisture Added (meter)

CHEROKEE CIRRUS COTTON CONDITIONER TEST DATA (10/13/06 ) SANDY RIDGE COTTON COMPANY – MALDEN, MO BEFORE CIRRUS AVGSD SAMPLE ID (10/13/2006) Start Mass, g Finish Mass, g % Moisture (calc) % Moisture (meter) AFTER CIRRUS SAMPLE ID (10/13/2006) Start Mass, g Finish Mass, g % Moisture (calculated) % Moisture (meter) % Moisture Added (calculated) % Moisture Added (meter)

CHEROKEE CIRRUS COTTON CONDITIONER TEST DATA (10/15/06 ) SANDY RIDGE COTTON COMPANY – MALDEN, MO BEFORE CIRRUS AVGSD SAMPLE ID (10/15/2006) Start Mass, g Finish Mass, g % Moisture (calc) % Moisture (meter) AFTER CIRRUS SAMPLE ID (10/15/2006) Start Mass, g Finish Mass, g % Moisture (calculated) % Moisture (meter) % Moisture Added (calc) % Moisture Added (meter)

C0MPARISON DATA COMPARE BALE PROBE MOISTURE READINGS WITH AFTER CIRRUS

CONCLUSIONS SUCCESFUL MOISTURE ADDITION IN EXCESS OF 2.5% AT 45 BPH SUCCESFUL BATT COMPRESSION MOISTURE-EFFICIENT OPERATION ALLOWS BATT TO PASS THROUGH WHEN OPENED

PROJECT TIMELINE Late February – Developed Conceptual Sketches Early March – Began Preparations for Patent Application Early May – Began Detail Design Process Early June – Began Machine Construction Early July – Completed Detail Design Process Late July – Filed Patent Application & Shipped Complete Mid August – Initial Tests in Commercial Gin Plant (with 10 cotton modules from 2005 crop season) Late September – Began Full-Scale Operation Mid October – Performed Sample Testing

CIRRUS PROJECT TEAM CREDITS ROY OWENSINITIAL CONCEPT CONTRIBUTOR / MORAL SUPPORT / FORKLIFT OPERATOR JERRY SCARBOROUGHINITIAL CONCEPT CONTRIBUTOR / MONIKER APPLICATOR / SALES GREG FIQUETTINITIAL CONCEPT CONTRIBUTOR / ASSEMBLY / TESTING / FIELD AIR SETTINGS MARK CORYINITIAL & FINAL CONCEPT / DETAIL DESIGN / PATENT INVENTOR KEVIN ADAMSFAN, DUCTWORK, SUPPORTS, SERVICE PLATFORM DESIGN / ORDER ENTRY STEVE EVANSPLC PROGRAMMING / ELECTRICAL DESIGN / HAD TO MAKE IT RUN IN THE FIELD CHRIS HALLDRAFTING SUPPORT / STRUCTURING SUPPORT CHRIS MOCK & ROBERT HARDEEPURCHASED PARTS / STOCKROOM SUPPLIES TAMMY HUDSONRAW MATERIAL PURCHASING PAT ? SHOP FOREMAN / ROLL FORMING / GENERAL MANUFACTURING MAGIC DANIEL HARRISONSHEET METAL LAYOUT / PLASMA CUTTER PROGRAMING DANIEL SENNPLASMA CUTTER / MAN OF FEW WORDS ?BAR STOCK SAW / MAN OF EVEN FEWER WORDS ?SHEAR & PRESS BRAKE ADRIAN ? & POU ?FABRICATION / WELDING MAGIC MIKE ? & STEVE HENRYLATHE / DRILLING & TAPPING DANNY ? & MARK DUDLEYCNC PROGRAMMING / MILLING CUTTERS RONNY OAKES & ?FINAL SHIPPING ASSEMBLY / SEALANT APPLICATOR LEIGH ANN HOGANACCOUNTING / OFFICE MANAGER LISA SINGLETONRECEPTIOINST / OFFICE ORGINIZER ED OWENSTRANSPORTATION / GOOD HUMOR RICK HOLLOWAYINSTALLATION TEAM SUPERVISOR / CRANE OPERATOR / FIELD BABYSITTER