X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)

Slides:



Advertisements
Similar presentations
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
PAL/POSTECH 제 2 회 한국 국제선형충돌가속기 워크숍 Waveguide System for Linear Collider Woon-Ha Hwang Linac Division Pohang Accelerator Laboratory 2005,12,28.
ENGINEERING DESIGN AND PRODUCTION OF X-BAND RF COMPONENTS Germana Riddone, CERN, Geneva, Switzerland Maria Filippova, I. Syratchev, Anastasiya Solodko,
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
Working Group 1: Microwave Acceleration Summary 10 July 2009.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
30 GHz waveguide line modification towards 12 GHz.
1 28-Nov-2011 Dog-leg meeting «BE/RF» Current 30 GHz layout CTF3 CTF2 Overmoded 90 bend Mode converter Ø50 circular waveguide (existing line) 326 mm 1.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
TE 01 -TE 02 DLDS Elements BINP-KEK
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
I. Syratchev, CLIC Breakdown Workshop, CERN, 20 May 2008 Power Circulation in a CLIC Accelerating Structure I. Syratchev.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
Calorimetric Power Measurements in Xbox-1 Xiaowei Wu.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Update on PETS experiments (Igor for the CLIC collaboration)
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
The status of RF components G. Riddone, M. Filippova RF development meeting on
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
Two-beam module layout
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Multi-stage pulse compressor
Manipulating RF phase and amplitude at high power level.
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
RF design of compact X-band waveguide components
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
Summary of the test structure design
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
CLIC Klystron based. Updates 2017.
Update of CLIC accelerating structure design
CEPC RF Power Sources System
CLIC Power Extraction and Transfer structure (PETS)
Presentation transcript:

X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)

X-Band RF Structure and Beam Dynamics Workshop, December 2008 Type Design Company Received/ ordered 50 dB Directional coupler GYCOM GYCOM 10/10 3 dB hybrid CERN Cinel, IHEP 3/3 + 1/1 3 dB H-plane splitter CERN VDL 1 /10 Dry stainless steel RF load CERN VDL,Cinel, 5/5+1/5+1/4 Heeze Waveguide E/H bends CERN CERN many RF flanges (new design) CERN CERN prototype Attenuator/splitter(0 ->1) GYCOM GYCOM 1/3 RF phase shifter (360 0 ) GYCOM GYCOM 1/1 H10-> H01 mode converter GYCOM/SLAC both RF & mechanical designs exist RF/vacuum valve (Grudiev type) SLAC GHz version exists Variable reflector CERN concept and FR design will be Polarized circulator presented by A. Cappelletti Choke mode flange CERN CERN 2/2 Areas Conventional devices TBTS PETS Recirculation network Stand along power source PETS ON/OFF CLIC WG network THE BIG LIST of the X-band waveguide components

X-Band RF Structure and Beam Dynamics Workshop, December 2008 Conventional devices 3dB hybrids 50 db directional couplers H-plane 3dB splitter Unisex RF vacuum flange development at CERN

X-Band RF Structure and Beam Dynamics Workshop, December 2008 Conventional devices Dry stainless steel RF load. High peak and high average power design. Pulsed heating distributions along the load: H-field plot (quarter of the period) Design specifics Load regular part cross section E The load half Matching taper WR90 The 12 GHz load is made of the standard stainless steel S316 and is 0.8 m long. Frequency, GHz S11, dB The new, double-frequency load modification is made of the SS430 magnetic stainless steel and have the same length. The prototype arrived at CERN for the acceptance RF check. The 2 loads will go to KEK and 2 to SLAC Measured HFSS

X-Band RF Structure and Beam Dynamics Workshop, December 2008 S parameters at the position of the max (blue) and min (red) coupling TBTS PETS Recirculation network Variable high power RF power splitter Variable high power RF phase shifter The number of RF components: directional couplers, loads variable splitter and phase shifter have been installed and now under operation in the TBTS, CLEX at CERN

X-Band RF Structure and Beam Dynamics Workshop, December GHz Stand along power source 12 GHz stand along RF power source waveguide network layout GHz Gate valve (Grudiev type) SLAC design 11.4 H10 -> H01 mode converter SLAC design -The 12 GHz version of the SLAC mode converter is already being designed as a part of the 12 GHz klystron window. We a planning to establish joint SLAC/CERN order to the industry. - The 12 GHz gate valve is now being rescaled from its 11.4 GHz brother Normally the overmoded component should be used in the complicated and long waveguide networks to allow efficient and reliable operation.

X-Band RF Structure and Beam Dynamics Workshop, December 2008 CLIC waveguide network GHz choke mode flange prototype To allow the independent transverse alignment of the two linacs in CLIC, the special, contact-free choke mode flanges (CMF) are planned to be used Dynamic range for the accepted performance (S11< -45 dB) X – shift: ± 0.25 mm Y – shift: ± 0.5 mm Z – shift: ± 0.5 mm Twist: < 5 0 CMF x y

X-Band RF Structure and Beam Dynamics Workshop, December 2008 SUMMARY  Since the CLIC frequency change in 2007, the extensive program of the X-band RF waveguides components development have been established in CERN. To date, we have designed, fabricated and received all the components necessary to start the high RF power operation of the TBTS and the first stage of the TBL. The number of them are already installed and are in operation.  Recently, in Europe, the X-band activity has significantly grown. The number of Lab have expressed their interests in using the X-band technology for their needs. We are welcoming any requests to share our experience in terms of development and fabrication of the devices, even with customized specification. Also the design of the new types of the RF components can be done on the collaborative bases. Do not forget, the high power RF components is rather expensive business !