ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.

Slides:



Advertisements
Similar presentations
2 Manoj P Managing Changes without a Crystal-ball.
Advertisements

Making the System Operational
Configuration Management
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Web Development Engineering Processes Introduction to Web Development Outsourcing Processes.
1 SOLVAY The Sarralbe Experience Sarralbe is the name of a town in France, close to the border between France and Germany. In this town Solvay has a Production.
Confidential Agenda sparesFinder introduction Key Issues Master data harmonisation – Cleansing process Item Management & Governance – Governance Issues.
OMKAR Solutions Inc. Version 1.0 SAP CTS & System Health Check Manager.
SAP Support Costs Am I Paying too Much?. Agenda  Company Background  SAP System Details & Support Model  Base Line Cost Assessment  Evaluate the Options.
#4502 – Streamlining the Physical Inventory Process Using a Custom Solution.
Managing Change in Production BW at General Mills Mike Ruesewald Cindy Burlet Chris Gunn.
Microsoft Dynamics AX Technical Conference 2013
Introduction to SAP R/3.
Solution Manager as a non Basis tool Session 2605.
University of Southern California Enterprise Wide Information Systems Customer Order Management (Continued) Instructor: Richard W. Vawter.
Software Configuration Management
Overview SAP Basis Functions. SAP Technical Overview Learning Objectives What the Basis system is How does SAP handle a transaction request Differentiating.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring MRP-II and ERP Slide Set #13.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
Roles and Responsibilities
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
SAP Overview SAP? Company ERP Software package –R/2 –R/3.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
Serena Project Case Study Sapphire, Atlanta April 23, 2007.
UCB SA-NV SAP TEAM EURO Information Session 17th November
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
EMM – SAP Error Messages Management Tool OMKAR Solutions Inc. Version 1.0.
08/30/05GDM Project Presentation Lower Storage Summary of activity on 8/30/2005.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
SAP Business Connector Integrating R/3 to Global Web Deployment Using XML and Business Connector.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
© ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
Enterprise Resource Planning Dr. Djamal Ziani. ERP Business Functions And SAP System CHAPTER 2.
] COREY PEARSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2008 CHAVONE JACOBS [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2003 ALLAN FISHER [ ASUG INSTALLATION.
] COREY PEARSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2008 CHAVONE JACOBS [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2003 ALLAN FISHER [ ASUG INSTALLATION.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
Wily Overview, Configuration and Usage Rick Kriehn Harley-Davidson, Inc Technical Analyst – Basis October 1, 2010
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
 SAP AG April Accelerating Data Migration: LSM Workbench Legacy System Migration Workbench
SolMan, SLD, SolMan Diagnostics & PI Configuration & Usage
IBM Global Services © 2005 IBM Corporation SAP Legacy System Migration Workbench| March-2005 ALE (Application Link Enabling)
] COREY PEARSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2008 CHAVONE JACOBS [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2003 ALLAN FISHER [ ASUG INSTALLATION.
ASUG SAP Adoption Influence Council Overview: The focus will be on how to increase awareness, adoption and implementation of SAP enhancements that are.
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
Overview of SAP Products & Components SAP AG – An Overview World’s Leading Provider of Business Management Software Established in Headquarters.
AX DEVELOPMENT FOR NON- DEVELOPERS Why did my 15 minute change take 3 weeks.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
HPHC - PERFORMANCE TESTING Dec 15, 2015 Natarajan Mahalingam.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
APO Technical Workshop for LG Chemical Based on APO 3.10.
CTS Change & Transport System. Introduction The Change and Transport System (CTS) is a tool that helps you to organize development projects in the ABAP.
Copyright © WhizTree Ltd All rights reserved. SAP Application Development Partner -
Roles and Responsibilities
SAP Overview.
Archiving and Document Transfer Utilities
Maintaining software solutions
ERP Systems Lecture # 7.
Description of Revision
Sales Order Process.
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
{Project Name} Organizational Chart, Roles and Responsibilities
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT MEMBER SINCE: 1998 [ ] ASUG – Keeping Your SAP Instance Clean [ April 7th - Eric Halbur & Prakash Kamath

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage. Introduction / The Company Sauer-Danfoss is a worldwide leader in the design, manufacture and sale of engineered hydraulic, electric and electronic systems and components, for use primarily in applications of mobile equipment. One of the largest manufacturers and suppliers of mobile hydraulics, electro-hydraulics and full-electric solutions in the world. Approximately 6,000 employees revenues of approx. $1.6 billion USD. More than 17 manufacturing/engineering sites (include joint- ventures) in the Americas, Europe and the Asia-Pacific regions.

[ Real Experience. Real Advantage. Introduction / A Truly Global Company

[ Real Experience. Real Advantage. © Blue Graphics Concept Sauer-Danfoss Products / Know-How in Technology World-class technologies that serve a range of different market segments: AgricultureConstructionMaterial handling Road buildingTurf careSpecialty

[ Real Experience. Real Advantage. Products / Know-How in Products Hydrostatics

[ Real Experience. Real Advantage. Products / Know-How in Products Open circuit axial piston pumps and gear units

[ Real Experience. Real Advantage. Products / Know-How in Products Orbital motors

[ Real Experience. Real Advantage. Products / Know-How in Products Valves

[ Real Experience. Real Advantage. Products / Know-How in Products Steering components and systems

[ Real Experience. Real Advantage. Products / Know-How in Products Mobile electronic components and systems

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage. Sauer-Danfoss SAP Landscape SAP ECC SAP HR SAP APO SAP SNC SAP PI SAP BI SAP Solution- Manager SAP Portal ADS TREX SAP ISA SAP GRC GIS WebSAPConsole / ITS

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage. ERP Installation  SAP Version – ECC 6.0 without Enhancement Pack  SAP Industry Solution – Automotive  Users - ~3600  Sizing (ERP Factory)  SAPs: DB(9000) APP(3600) - App Servers: 2  Modules Installed / Configured:  SD, MM, FI/CO, PP, IM, WM, VC, QM, CS  Large non-SAP add-ons  Pick Pack Ship  D&B  GIB DISPO Cockpit  Customizations and Modifications (SAP CDMC)  Z* Objects:1976 High Level / 5577 Low Level  SAP Modifications*:574 High Level / 735 Low Level Single Global Instance

[ Real Experience. Real Advantage. ERP Installation  Non-SAP Integrations  EDI with Customers and Suppliers  EDI with Banks  Global Shop floor Interface  Non-SAP PLM System Interface  Various data extracts

[ Real Experience. Real Advantage. SAP CDMC Custom Development Management Cockpit  The Custom Development Management Cockpit provides a set of features that support the handling and organization of ABAP custom development objects in SAP systems. You use SAP CDMC to: Analyze custom developments in your SAP system, and identify obsolete developments (Clearing Analysis)  Find all custom development objects  Find all SAP modifications  Get run statistics from remote system  Find duplicate domains  Find empty DBs  Syntax check code  Find transport frequency  Find inactive objects  Extended run time analysis  Top down analysis (how custom objects are used in your SAP system)  Bottom up analysis (how custom objects are used in your SAP system)  Find objects with no reference  Find enhancements  Display data results of what could be deleted

[ Real Experience. Real Advantage. Identify the potential consequences an upgrade can have on custom developments (Upgrade / Change Impact Analysis)  Find Copied programs – N/A  Maintain adjustment estimates  Find Used SAP Objects in custom development  Find changed SAP Objects  Remote Compare  Find Batch inputs  Find custom programs that make external subroutine calls to standard SAP subroutines  View overall data results SAP CDMC

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage. EverGreen Purpose: The SAP system landscape needs to stay current with patches, support packs, and enhancements to prevent large upgrade projects and falling behind on support. What: All SAP systems (ERP, BI, PI, SCM, Solution Manager,......) General: IT advertised to the business that we will keep our systems current on a regular basis without having to take the systems down for major upgrades. Keeping the system in this updated state not only allows us to be proactive in the delivery of new functionality, but also support business projects. It also allows us to have a coordinated effort, rather than piece-meal implementations of OSS notes that may not be tested to an appropriate level.

[ Real Experience. Real Advantage. Evergreen Challenges  Landscape Version Dependences  Enhancement Pack Strategy  SPs dependencies  EHP SP dependencies  Activation of functionality  Can turn into a huge expense initiative for large landscapes  What release to move to and what side effects come with Why Upgrade  Proper testing is not always done on single note implementations, or is very hard to do.  Forces clean-up and reevaluation of custom code  Keeps us from needing larger more complex upgrades after long time durations.  Ongoing maintenance keeps us in compliance with SAP support guidelines.  New technical and business functionality SAP Landscape Upgrade Challenges and Why Upgrade

[ Real Experience. Real Advantage. Effort Summery ERP SPs 15 Actuals

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage.  Since the implementation of SAP in 2004, the system was loaded with a lot of imported objects for various projects and various custom developments. Most of them are not in use today.  This reduces system performance by doing redundant work.  Increases maintenance and upgrade work.  Uses substantial space on the system memory.  As part of the project we will archive these objects into SAPs transport files.  During the project we will identify and analyze all unused objects.  Create restore migrations by grouping the objects to be deleted.  Delete all the objects using LSMW  Test the system for all the impacted area before deletion in SRP. Project Description

[ Real Experience. Real Advantage. Project Time Line - Planned

[ Real Experience. Real Advantage. Detail Project Planning  Define the list of objects to be analyzed  CDMC List  Inactive Enhancements  Completely commented programs  Determine the objects to be deleted  Identify criteria for deletion  Check the list for meeting the criteria  Identify “May Be” for further scrutiny by non project members  Finalize the identified objects into “Yes” and “No” categories  Determine the objects that need testing  Group the items to be deleted for group deletion  Identify criteria for grouping  Identify shared objects used by multiple other objects  Do conflict resolution in grouping  Finalize grouping  Create migrations for the indentified group of objects  Release the migrations with proper documentation  Delete these migrations from Import Queue  Delete the objects creating a single migration for deletion  Release and import the deletion migration to QA Project Scoping -- CMMI Inspired

[ Real Experience. Real Advantage. Detail Project Planning  Test the objects that need testing  Define or identify test scripts from older change requests  Perform Testing  Identify test fail cases and communicate it for issue resolution  Identify needed development or undo deletion of needed objects  Migrate it to QA for further testing.  Plan for cut over and do the cutover activities  Cut over plan preparation  Prepare a list of areas for identification of failures  Determine the interval for monitoring failure after implementation  Migration of deletion transport  Post implementation support  Monitor the list for identification of failures  Do the root cause analysis for failure  Identify and develop the fix for failure  Test the fix  Implement the fix Project Scoping -- CMMI Inspired

[ Real Experience. Real Advantage.  Focused on Z* objects: 8596 objects in scope  CDMC flagged objects not used in the last 14 months Number Objects in Scope

[ Real Experience. Real Advantage. Deletion Flag Process  Leveraged a SharePoint list for status tracking  Almost all the used objects were marked delete ‘No’  All completely commented programs were marked delete ‘Yes’  Delete ‘Yes’ was flagged only if there is no doubt  Backward tracing of migrations was used for identification of object’s original need

[ Real Experience. Real Advantage. Restore Migrations  Group the objects based on their technical relation: Data- Dictionary groups, Transaction codes groups, Functions groups, Programs groups, Classes groups  Create restore migrations for each group and release  Restore migrations are normal workbench transport requests which when released, create transport files for the objects into application server  Restore migrations can be re-imported into system to create these objects after deletion  All the restore migrations were deleted from import queue of test systems to avoid getting migrated

[ Real Experience. Real Advantage. Mass Object Deletion  Created an LSMW object to delete the objects in development system  We had separate LSMWs written to delete different types of objects  Objects with interdependency were a problem  Dependency lead to LSMW being run repeatedly  About 90% of the objects were deleted by LSMW  One large deletion migration was created

[ Real Experience. Real Advantage. Syntax check program - SAMT  SAMT transaction code allows to run syntax check for all the objects  SAMT was scheduled before and after the delete for comparison of results  Both test system and production system syntax check was performed  SAMT identified some LSMW objects using a database table which were deleted  It takes significant amount of time to complete

[ Real Experience. Real Advantage. Testing and Migration D->Q->P  Testing was performed only in test system  All the objects marked as needing testing were tested  General regression testing was performed to check if all the important processes still work  Important interfaces were tested for failure  Few objects related to data cleansing or regeneration of programs provided by SAP through OSS message and notes were recreated using restore migrations  List of failure signs and run time errors was created and distributed across the support center for cut over  Production system was monitored periodically for failures after go live

[ Real Experience. Real Advantage. Number Objects Deleted

[ Real Experience. Real Advantage. Total Project Effort – Estimate vs Actual * All times are in person hours

[ Real Experience. Real Advantage. Post Go-Live Issues  Background job started cancelling as program run by this job was deleted. After consulting with VC team it was decided that the job was no longer needed and job was deleted by Basis.  A few programs were later requested for re-store that were thought to not be needed.

[ Real Experience. Real Advantage. Topics Company Overview SAP Landscape ERP Components and Customizations Upgrade Strategy ERP Clean-up Project Moving Forward – Keeping IT Clean

[ Real Experience. Real Advantage. How to Keep the System Clean?  Each program and or transaction request should prefaced with whether the object is a one time use object. If so, the object is deleted directly after execution in production system.  Periodic CDMC analysis on objects not used in the last 14 months.  Re-evaluation of objects during SPs and EHP upgrades.  Governance process in place to limit Z* objects and or SAP modifications in favor of SAP standard functionality.

[ Real Experience. Real Advantage. 40 ]  Thank you.