Injection Into Low Lifetime USRs R. Hettel, SLAC USR Accelerator R&D Workshop Huairou (Beijing), China October 31, 2012.

Slides:



Advertisements
Similar presentations
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
Advertisements

Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group* Outline: Timing mode fill patterns Short bunches –Low alpha Bunch length.
Modifications to DESY-II M. Minty Nov 11, The DESY-II 7GeV Lepton Synchotron DORIS f inj = 6.25 Hz E inj = 4.5 GeV N ppb = 5 · 10 9, typical DORIS.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Injection System T. Shaftan NSLS-II Accelerator Systems Advisory Committee October 11, 2006.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
MEIC Electron Ring Injection from CEBAF
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Ultimate Storage Ring Light Sources: Design and Performance Objectives R. Hettel, SLAC USR Accelerator R&D Workshop Huairou (Beijing), China October 30,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
ALCW at SLAC, January 7, 2004J. Rogers, Novel Schemes for Damping Rings1 Novel Schemes for Damping Rings J. Rogers Cornell University Improving dynamic.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Injection scheme for ultimate storage ring with double RF system Bocheng Jiang SSRF AP group SINAP. CAS LOWεRING 2014.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Failure analysis at BEPCII
Plans for ions in the injector complex D
SLS Timing Master Timo Korhonen, PSI.
Considerations on RF systems of SPPC collider and its injector chain
Polarized Electron Source for eRHIC (the ring-ring option)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Luminosity Optimization for FCC-ee: recent results
LNF Laboratory Report S. Guiducci.
Injector Chain General and more about p-RCS
Top-Up Injection for PEP-II and Applications to a Higgs Factory
SuperB project. Injection scheme design status
Pol. positron generation scheme for ILC
Compton effect and ThomX What possible future?
2017 CAS Erice case study: Design of a beam dumping system for FCC
CEPC Injector Damping Ring
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Generation of Higher Brightness Beams for LHC
JLEIC electron injection demo
JLEIC electron injection demo
CEBAF Pulsed Operation for JLEIC Electron Injection
Polarized Positrons in JLEIC
PSB magnetic cycle 900 ms MeV to 2 GeV
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
JLEIC CCR Path Length and Gap Formation
Some Thoughts on the JLEIC Ion Injector
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Injection Into Low Lifetime USRs R. Hettel, SLAC USR Accelerator R&D Workshop Huairou (Beijing), China October 31, 2012

Touschek-dominated lifetime

Top-up injection Limit change in total charge  q tot between injections to small fraction r of total q tot : For a given injection charge q inj (=  q tot ), injection must occur with repetition rate f i, time interval t i = 1/f i : for t i <<  (0)

Injection into PEP-X (baseline design) – case study An “extreme” case: h = 3492n b = 3400T rev = ms  (0) = 1800 sec i tot = 1.5 A q tot = nCi bavg = 0.44 mAq bavg = 3.23 nC  q inj /q tot = r = 0.1%   q inj = ~10 nC every 1.8 s t i = 1.8 s

Case study: injection conditions 1.0.1% current constancy: must restore 10 nC in n bunches every 1.8 s. 2.Want to limit the variation in bunch charge in all buckets to the < ~20%   q b < ~ 0.7 nC for 3.5-nC bunches. 3.Top-up injection from linac or linac+booster must supply just 10 nC in n bunches every 1.8 seconds. 4.Swap-out (bunch replacement) injection must restore 10 nC + the total charge remaining in n bunches (e.g. ~300 nC in a 100-bunch train). 5.Injected charge from linac or linac+booster injector typically limited to <~1 nC/bunch, with up to ~10 nC total multibunch  swap-out limited to replacing ~10 nC in ~20-bunch trains (0.5 nC/bunch)  total current limited to ~ mA, depending on kicker rise/fall times and requisite gaps between trains in ring 6.Injected bunch from accumulator can have higher charge/bunch and longer trains  total current of 1.5 A is possible.

Case study: injection example 1 FILL PATTERN 1: top-up (or replace) each bucket 10 Hz, beginning with bucket 1, ending with bucket 3400, leaving a gap of 92 buckets. Total average charge constancy <0.1%. f inj = 10 Hz q inj = nC for top-up decay of bunch charge before top-up every 3400 injection cycles (340 s) bunch pattern after top- up of bunch #3400 fractional variation of bunch charge from average after top-up of bunch # %

Case study: variation of injection pattern 1 a different spatial frequency spectrum

Case study: injection examples FILL PATTERN 2: fill every nb/10 (= 340) buckets in sequence FILL PATTERN 2: variation FILL PATTERN 3: fill every nb/68(= 50) buckets in sequence etc….

Short lifetime injection: conclusions 1.Frequent injection is needed to achieve 0.1% current constancy: injection interval = 0.1% of beam lifetime. Perhaps only 1% constancy is necessary. 2.Linac or linac+booster can satisfy top-up injection requirements for high current, low-lifetime machines. 3.For swap-out injection, total ring charge and current is limited using linac or linac+booster (e.g. <200 mA for 1.5 km ring). 4.High total current can be sustained with injection from an accumulator. 5.Swap-out injection requires kickers with fast rise/fall times and extremely flat tops (not addressed here).