STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS cavities interfaces
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Experiences with KEK-B Crab Cavity KEKB and Crab Cavity History of Crab Cavity Construction and Operation of KEKB Crab Cavities What the KEKB Crab Cavity.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
S1G Experiment Schedule Plan
WP5 Elliptical cavities
Status of cavity fabrication facility at KEK
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Chris Adolphsen Sergei Nagaitsev
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Progress in Asia Hitoshi Hayano,KEK,
Accelerator Layout and Parameters
IHEP Cryomodule Status
Nick Walker (DESY) EU GDE Meeting Oxford
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Presentation transcript:

STF status Mar.22,2005 H. Hayano, KEK

STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches) Test Cryomodule : 4x 9cell TESLA SC cavity (5m cryomodule), 35MV/m 4x 9cell LL SC cavity (5m cryomodule), 45MV/m 4x 350kW + 4x 450kW = 3.2MW, 1.5ms klystron, 5Hz Vertical Test Stand : deep enough for superstructure cavity Coupler Test Stand : 1MW, 1.5ms klystron, 5Hz (switch use between horizontal stand)

STF Infra-structure EP: build new EP(Electro chemical Polishing) facility HPR : move High Pressure Rinse from L-band test stand Clean room : build new clean room for cavity assemble Vertical Test Stand : build new stand, deep enough for superstructure cavity Coupler Test Stand : 5MW, 1.5ms klystron, 5Hz (switch use between Test Cryomodule ) He Plant : 600W at 4K plant moving from AR-East building (adding new 2K system )

Sub-group organization Cryogenic plant : Team K. Hosoyama (7) High Power RF (inc.LLRF) : Team S. Fukuda(11) Cryomodule Cryostat : Team K. Tsuchiya(2) SC-Cavity (base-line) : Team S. Noguchi(4) SC-Cavity (high gradient) : Team K. Saito(14) Electron Gun : Team S. Osawa(4) Control & Operation : Team ATF(9) & Team XTF(5) organizer : H. Hayano & N. Terunuma Surface Process Facility (EP & Clean room) : organizer : A. Enomoto

2005 Plan by 2005 budget STF Phase of High Gradient cavities with jacket, tuner, input coupler of Base-line cavities with jacket, tuner, input coupler co-op. with industries of 5m cryostat (for 4 cavities) W 2K He plant (using moved 600W 4K plant). 5. 5MW klystron system using existing modulator, and LL-RF development. 6.DC-gun installation and beam monitors fabrication. 7.Control system start-up (for input coupler processing). 8. Existing EP-facility maintenance and new clean room. ATF & ATF2 1. ATF operation. 2.Improvement of ATF ( High res. Ring BPM, feedforward to Ext-line). 3.1/3 of ATF2.

Location of Test Facilities ATF L-band R&D Stand Proton Linac Building(STF) #4 building KEK-B He Plant Control Center 1) 60m x 30m building: Klystron Gallery (with extendable space) Cavity installation room magnet power supply room (with extendable space) Control room (with extendable space) Cooling water facility AC power yard external Tent House 2) 5m x 3.85m x 93.5m tunnel: Access hatch only 2m x 4.5m with elevator (with extendable space)

Klystron Gallery

Tunnel underground

Moving Plan of J-PARC Linac 1. Disassemble of control racks : end of April 2. Moving klystron power supply(RFQ, DTL1,HVPS#2) : April Moving Solid-state amp(buncher, chopper) : May Moving control racks(42 racks) and instruments : May Moving Klystrons(5 kly.) : June 6. Moving High-power waveguides : June 7. Moving Ion-source : July & August 8. Moving RFQ, MEBT, DTL1 in tunnel : June, July, August 9. Moving Q-mag power supplies : September 10. Clean-up of SDTL assembly room : November, December 11. Klystron, klystron power supply and controls for DTL3 : moving in Jan. 2006

STF Modulator, klystron plan 1. Buy 5MW Thales Klystron, Build Pulse trans, Modify PNC Modulator putting bouncer circuit in it. 2. Build one more modulator (ILC spec.) for cavity driving (in 2006). start investigation of technology for bouncer modulator/IGBT modulator. For driving cavities & Input coupler Test stand, later for RF-gun. Additional PT+Bouncer circuit allows to use TH2104C. PNC modulatorTH2104C

STF Phase 1 Beam Line Plan

STF Beam source Plan 1. Photo-cathode DC-gun (from ERL development) 2. RF gun cavity design & fabrication ( KEK machine shop in 2005) 3. Photo-cathode Load-lock System (extension of ATF load-lock from ERL development) 4. Laser Development (in 2006 )

Conceptual design of cryomodule 35MV/m TESLA design cavities 45MV/m Low-loss cavities Weld connection Valve Box STF Phase 1 Why two module and connection? ->5m carry hatch, ->Establish weld connection in tunnel. Become to 8 cavities in one cryostat Like TTF cryomodule

Preliminary design of cryomodule whole assembly 35MV/m TESLA design cavities45MV/m Low-loss cavities Single cryostat operation (option)

Cryomodule Cryostat Design status KEK cryomodule cross-section Design is underway Description OD (mm) STF TESLA  t (mm) STF TESLA Notes Vacuum vessel carbon steel 2 K gas return stainless steel 2 K two-phase supply Ti Cool down/ warm up stainless steel 5 K shield supply stainless steel 5 K shield return stainless steel 90 K shield supply stainless steel 90 K shield return stainless steel

Base-Line Cavity Design status 1.Input coupler improvement for simple & cost reduction (no tuning) HFSS calc. 2.cavity and He jacket rigidity improvement for small Lorentz detuning

3. Simplification of Tuner mechanism, exchangeability of Piezo Element, Pulse Motor outside, etc Base-Line Cavity Design status cont. 4. Cavity Shape optimization

High gradient (LL) Cavity status 1.Single cell High gradient cavity Test ( re-startup of surface process, vertical test stand ) 2. 9-cell LL cavity design was completed.

High gradient (LL) Cavity status cont. 3. Fabrication of 9-cell LL cavity ( deep drawing, EBW, Burring ) 4. Input coupler design modification ( low field on ceramic edge )

STF phase 1 start-up status JFY 2004 budget reallocated to Cryogenic plant movement: March MV/m cavity fabrication: March JFY 2005 budget 2005 plan is almost fixed. Construction responsible person has fixed. detail scheduling has started (making Excel sheet). interaction with collaborators has started. interaction with Industry has started. Detail design has started. end