Gas Performance Assurance Framework 11 th January 2013 Confidential.

Slides:



Advertisements
Similar presentations
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Advertisements

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
1 Project Nexus Requirements Definition Phase Steve Nunnington.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC Workgroup Settlement topic 4 th October 2011.
Learning the lessons 2012 and 2014 procurements of audit services.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
IGT and Shipper Workgroup meeting 28 th February 2011.
User Pays User Committee 12th November 2013
Supply Point Register 10th January 2012
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Gas Performance Assurance Framework March 2013
Performance Assurance Framework Risk Register Consultation Summary
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
UIG Task Force Progress Report
Guidance notes for Project Manager
PAF Risk Register and PARR mapping
DSC ChMC CSS update 7th November 2018
Modification th July 2008.
Connected System Exit Points Administration Options
Gas Performance Assurance
UIG Task Force Progress Report
Project Nexus Workgroup
MOD 232 Proposal, Richard Dutton 16th December2008
XRN 4695 Supporting Document High Level Plan
CSS Update for CoMC 19th September 2018
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Project Nexus Workgroup
UIG Task Force Progress Report
Project Nexus Workgroup
PN UNC Workgroup Settlement Overview
UIG Task Force Progress Report
Project Nexus Workgroup
PN UNC Workgroup (Settlement topic)
UIG Task Force Progress Report
Gas Performance Assurance Framework February 2013
UNC Modification Performance Assurance Framework Incentive Regime
UIG Task Force Progress Report
UIG Task Force Progress Report
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
UIG Task Force Progress Report
UIG Task Force Progress Report
Joint Office UNC Elections
Joint Office UNC Elections
Joint Office UNC Elections
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Gas Performance Assurance Framework 11 th January 2013 Confidential

Gas Settlements, Energy Retail Objective 2 To ensure that gas settlement has accurate allocation, control, self monitoring and governance post Project Nexus so that no commercial advantage can be derived from settlement

Gas Settlements, Energy Retail Update from 11 th January meeting 3 There was general agreement on the benefits and need for a Performance Assurance regime amongst Workgroup attendees Attendees also agreed that quick wins would be advantageous However it was recognised that a framework for a Performance Assurance model could be the initial focus, with issues and controls being introduced on a “merit/materiality” basis ScottishPower agreed to provide more detail on the model that they had outlined and provided for the Workgroup

Gas Settlements, Energy Retail Governance Structure – Foundation Stage 4 Performance Committee Performance Assurance Panel Report on issues Analysis required Reporting by Xoserve Reporting requirements to be established Performance Committee to be set up Performance Assurance Panel to be appointed and constituted Report on issues Consider: Meeting frequency Facilitating meetings Analytical support needed Rationale for agreeing materiality Governance – including interaction with Performance Assurance Panel …… Consider: Funding Meeting frequency Facilitating meetings Decision making powers Rationale for approving materiality Rationale for agreeing priorities Governance How are Panel appointed Who can be on the Panel ….. Consider: Funding Specification of reports Timings of reports Ensuring accuracy Trend analysis….

Gas Settlements, Energy Retail Governance Structure – Initial Stage 5 Performance Committee Performance Assurance Panel Report on issues Analysis required Reporting by Xoserve Reporting requirements to be established Performance Committee to be set up Performance Assurance Panel to be appointed and constituted Report on issues Consider anonymous reports Determine implications on industry process and procedures Are the issues “resolvable”? What is the materiality of the issue? Will the issue be resolved without incentive? (possible MOD in progress or system issue that is scheduled to be fixed, maybe through Nexus) Create report to Panel - issues, materiality, possible target/incentives Receive reports Request additional information as necessary Consider materiality, ability to resolve and prioritise, outlining actions Parties can take to resolve Consider where targets/incentives could be applied Either raise a MOD with Performance target and incentives (where necessary) or develop Working Practice and Procedure Process serials to be developed. For example: AQ Review – AQs of 1kWh, unallocated site statuses Meter read submission – meeting UNC requirements Asset issues – incorrect data Reconciliation – timing out of reconciliation, MOD640 sites Opening Meter Readings RGMA – flow and update issues KEEP THE FOCUS ON ESTABLISHING QUICK WINS

Gas Settlements, Energy Retail Governance Structure – Ultimately??? 6 Performance Committee Performance Assurance Panel Report on issues Analysis required Reporting by Xoserve Report on issues Reporting established and incremented as required Performance Committee receiving frequent reports and reporting to Panel Performance Assurance Panel appointed and monitoring and incentivising Monitoring requirement: Accurate allocation Certainty of costs Retrospective update Meter point reconciliation Rolling AQ Industry wide scaling LDZ input measures Controls: Provide guidance on proven techniques Formulate standards required/expected/necessary Propose targets and incentives via modification/working practice documents Reporting requirement: Initial allocation Meter reading performance AQ update performance Meter point reconciliation Retrospective update iGT CSEP and site reconciliation Reporting of input/output measures and scaling Accuracy of allocation algorithms DETECT MONITOR INCENTIVISE/CONTROL

Gas Settlements, Energy Retail Performance Assurance Panel 7 The Panel would be made up of Independent Industry Experts There would be a tender process to appoint [5] Industry Experts and a consumer representative [Consumer Focus] This process would be run by [Xoserve] as the legal entity who would procure the services of the experts and contract their engagement To allow Xoserve to appoint the [5] Industry Experts, the Performance Assurance Committee will provide a recommendation of the mix of skills and experience necessary to make the Panel an effective advisory body, with impartial experts Industry Experts would be contracted, with the terms of contract including – Confidentiality, Data Protection, Indemnity and Conflict of Interest

Gas Settlements, Energy Retail Performance Committee 8 The Committee will be open to all Parties to the UNC Xoserve will provide reports to the Committee, as requested and determined by the Committee and through requests from the Panel The Committee should also work with Xoserve and the AUGE to facilitate requests from the Panel, where they are trying to assess materiality of an issue The Committee will make a recommendation to Xoserve on the Skills and Experience required of the Performance Assurance Panel to allow them to undertake an appointment process The Committee will also determine the budget for the Committee through majority vote

Gas Settlements, Energy Retail Controls under Performance Assurance 9 A number of reports will be provided by Xoserve to the Committee on a monthly basis, for example: Input measures – frequency, quality and control Output measures (for example meter readings) – frequency, quality and control iGT registrations and data update – frequency, quality and control Site registrations – exceptions and handling Asset information – status, verification and responsibility Data quality (measure of errors) – meter readings, asset information Process serials – AQ update, threshold crossers, dead meters, product switching Accounting of unidentified gas – AUGE continuing role Difference between input and output by LDZ to consider unidentified gas

Gas Settlements, Energy Retail Possible issues to be controlled/resolved 10 Post Nexus a lot of issues could be resolved, but these are possible ongoing elements to be considered: Offtake errors Meter reading submission in line with UNC and Licence requirements CSEP update Shipperless and unregistered sites Incorrect asset information and invalid meter readings AQ update performance and the timing out of reconciliation, prevalence of MOD640 charges, sites not allocated gas and erroneously low AQs Shrinkage and allocation