Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.

Slides:



Advertisements
Similar presentations
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
The TIMING System … …as used in the PS accelerators.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
19 Nov 01 – V Chohan LHC Beam Instrumentation Review1 Beam Intensity Measurements  Requirements  What we Intend to do  DC-BCT Type, Limits, Improvements.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Simulations and Software CBM Collaboration Meeting, GSI, 17 October 2008 Volker Friese Simulations Software Computing.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Digital Signal Analysis for BPMs The Project –Measure beam trajectories and orbits in.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
Real time performance estimates of the LHC BPM and BLM system SL/BI.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
BeamCal Electronics Status FCAL Collaboration Meeting LAL-Orsay, October 5 th, 2007 Gunther Haller, Dietrich Freytag, Martin Breidenbach and Angel Abusleme.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Thesis: Introduction Study for a failsafe trigger generation system for the Large Hadron Collider beam dump kicker magnets prepared by Martin Rampl.
Context of CERN-LAPP collaboration HS,
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
New Coil Drivers Time Line Alberto Gennai I.N.F.N. Pisa.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
O. Kester, NuSTAR annual meeting, 27/02/2013
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
14.4. Readout systems for innovative calorimeters
Digital Signal processing in Beam Diagnostics Lecture 2
Status of the ECL DAQ subsystems
PANDA Muon Group Meeting, Protvino 7 June 2011 G
LIU Wire Scanner Milestones June 2017
The ELENA BPM System. Status and Plans.
P. Forck, P. Kowina, M. Schwickert, R. Singh
M. Mehler1), H. Klingbeil1), B. Zipfel2)
ERL BPM System Mike Billing, Mark Palmer
Elettra – Sincrotrone Trieste S.C.p.A.
Presentation transcript:

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position Monitors Ulrich Raich CERN AB/BI

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 The problem Big number of Beam Position Monitors around the ring Sum and difference signals sampled at high frequency (125 MHz) asynchronous to the revolution frequency Signals numerically integrated on the fly, which needs algorithms implemented in big FPGAs –Synchronization to the bunch frequency –Generation of integration gates and baseline correction Big memories for storage of all trajectories during an acceleration cycle

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Position calculation

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Hardware The analogue front-end of the PS BPMs have been improved (to be capable of measuring Pb ion trajectories) A new analogue to digital converter card has been developed by ITech The Libera memory subsystem has been improved using DDRAM instead of SRAM chips Firmware is about to be implemented Milestone Hardware ready and approved: April 2006 is ok

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Definition and test of Algorithms (1) Sum and Difference Signals are sampled from Beam Position Monitors at high sampling frequency (125 MHz) In 2004 already data have been taken at CERN and GSI using fast ADCs in a PC and using a prototype version of the future data acquisition module First versions of algorithms have been designed and implemented as offline signal treatment (C program and matlab program) The algorithms have been tested on the previously acquired data. Several deficiencies have been detected and corrected

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Definition and test of Algorithms (2) The algorithms have been partially implemented in VHDL (this lead to the several modifications in the algorithms) Full implementation is being started now Integration with ADC and memory drivers is to be done

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Work Force Andreas Galatis(GSI), Gregorgz Kasprowicz (CERN) PhD students (engineering) Maxim Stuckert (CERN) student (for 6 months) Kevin Lang (GSI), Jeroen Belleman (CERN) engineering Tomasz Karcnik (ITECH) engineering Andreas Peters, Ulrich Raich engineering and administration J. Dietrich Jülich, A. Zoubir (TU Darmstadt) observers + discussions

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Publications DIPAC 2005 Lyon European Beam Instrumentation Conference –Contributed Talk:J. Belleman A New Trajectory Measurement System for the CERN Proton Synchrotron –Poster A. Galatis Digital Beam Position Measurement at GSI- SIS and CERN PS 2 CERN internal reports

Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Workplan Collaboration Meeting mid-May in Slovenia, done Collaboration meeting CERN Nov 2005, done Until October 2005: Refinement of Algorithms, implementation Algorithms improved, implementation started 2-3 months delay End 2005: Another measurement session using online signal treatment Will be done in 2006 as early as algorithm implementation and integration will be ready CERN: Installation of new analogue front-ends (almost done) CERN Tender for acquisition of 50 digital treatment boxes Market survey has been done, Tender document is almost ready 2006: Definition of data layout in memory, interfacing to the accelerator control system still possible Installation and commissioning for final PS system (start in 2007)