Verigy V93000 Service Training NIST Traceable Calibration.

Slides:



Advertisements
Similar presentations
Training Guide. `
Advertisements

Week 7 Session 1 Reading 3 Pin Configurations and Wiring Terminology.
C01 - ORiNOCO AS-2000 Networks course overview ORiNOCO AS-2000 Networks Course Overview.
Mr C Johnston ICT Teacher
EVOLUTION® Hands-On Demo This guide is meant to help lead a hands-on demo or presentation. The items listed are a suggestion for things to review, please.
Page 1 - © Richard L. Goldman Networking Topology ©Richard L. Goldman January 8, 2002.
Verigy V93000 Service Training
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Planning and Cabling Networks Network Fundamentals – Chapter 10.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 11: Monitoring Server Performance.
Preparing … First of all, recycle monitor power using AC power switch. Connect serial cable between your PC and monitor. (RS-232 Connector). Refer to Appendix.
Hardware & Software Needed For LAN and WAN
Topics 1.Taking the Lock into use – physical serialization 2.Detailed setup options 3.Using mobile broadband 4.Taking the Key into use.
Network Done by: Athra sultan.
What is a Computer Network? Two or more computers which are connected together.
Duties of a system administrator. A system administrator's responsibilities typically include:
This is the way an organisation distributes the data across its network. It uses different types of networks to communicate the information across it.
And how they are used. Hubs send data to all of the devices that are plugged into them. They have no ability to send packets to the correct ports. Cost~$35.
Networking Feb. 6, 2008 by Larry Finger. Networking Hardware Glossary RJ45 – Official name for 8-pin connector Cat 5, 5E or 6 - Cable suitable for “high”-speed.
1 Project # 2 Steve Klesper Tom Ondick Garry Meadows Aaron Hurt Tim Wade.
NETWORK Topologies An Introduction.
Verigy V93000 Service Training
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 43 – The Network Interface Card (NIC)
Verigy V93000 Service Training
Server is ‘host’ Clients do not communicate with each other.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Component 9 – Networking and Health Information Exchange Unit 2-2 Network Media and Hardware Communication Devices This material was developed by Duke.
Understanding Network Architecture Access Methods How Networks Send Data Ethernet Token Ring AppleTalk and ArcNet 1.
Networks. What is a network? two or more computers linked together.
Verigy V93000 Service Training
HNC COMPUTING - Network Concepts 1 Network Concepts Devices Introduction into Network Devices.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
3/5/2002e-business and Information Systems1 Computer Networking Computer System Computer Hardware Computer Software Computer Networking.
Networking and Health Information Exchange Unit 2b Network Media and Hardware Communication Devices Component 9/Unit 2b1 Health IT Workforce Curriculum.
Verigy V93000 Service Training
Mr C Johnston ICT Teacher BTEC IT Unit 05 - Lesson 02 Network Devices.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Basic Computer Knowledge. Outline Notes 1 Notes 2 Assessment.
3.3 Data Networks. Overview Identify the main differences between LAN and WAN. Identify the advantages of using a network over stand-alone computers.
Networks. What is a computer network? A network is two or more computers that are linked together so that they are able to share resources.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Connecting to the Network Introduction to Networking Concepts.
Communications & Computer Networks Resource Notes - Network Hardware
Advanced Eligible Services Helping You Succeed Schools and Libraries Division Washington, DC Newark Atlanta Chicago Orlando Los Angeles Portland.
 A hub is a central connecting device in a network.  Each node is connected directly to the hub.  They receive a data packet from one node and send.
The world leader in serving science Noran System 7.
Section 13: Troubleshooting the Network CSIS 479R Fall 1999 “Network +” George D. Hickman, CNI, CNE.
NETWORKING COMPONENTS lLTEC 4550 JGuadalupe. HUB -THIS IS A HARDWARE DEVICE THAT IS USED TO NETWORK MULTIPLE COMPUTERS TOGETHER. IT IS A CENTRAL CONNECTION.
IC-CAP Modeling Configuration Agilent Technologies November 01, 2005 Page 1 Agilent IC-CAP Modeling Configuration - Block Diagram ( GHz) GPIB.
Planning and Cabling Networks Network Fundamentals.
ASSIGNMENT 3 - NETWORKING COMPONENTS BY JONATHAN MESA.
Chapter 7 - The Local Area Network Arrives Introduction Motivation (mainframes & minicomputers with terminals) Interchangeable Media (removable disks and.
Elements of an ICT networks COMMUNICATION DEVICES: 1.Network interface card 2.Hub 3.Switch 4.Router STANDARDS AND PROCEDURES: 1.Enable devices to communicate.
CompTIA A+ Certification Exam
Chapter Objectives In this chapter, you will learn:
Installation-Troubleshooting-Maintenance
Onno W. Purbo Wireless 2.4GHz 11Mbps Onno W. Purbo
Planning and Cabling Networks
Agilent IC-CAP Modeling Configuration - CV Measurement Block Diagram
RF Generator Auto Test System
Equipment Preparation
Multimedia Training Kit
Planning and Cabling Networks
Planning and Cabling Networks
Planning and Cabling Networks
Equipment Preparation
Summary Project goals related to the Census Selection of a Methodology
Communications & Computer Networks Resource Notes - Network Hardware
Planning and Cabling Networks
Planning and Cabling Networks
Presentation transcript:

Verigy V93000 Service Training NIST Traceable Calibration

Verigy Restricted Maintenance Page 2 Connecting the LAN/GPIB converter The E5810A LAN/GPIB converter (from your NIST tracecal kit) can be connected in two ways: 1.Connect it directly to the linux controller LAN card using a crossover LAN cable 2.Connect it to a LAN hub or switch using a LAN patch cable In case on the test system no LAN/GPIB converter was ever installed please consult the Installation Guide for the Agilent93000 system. In there the configuration of the LAN card of the controller, the LAN/GPIB converter and the software is described in detail.

Verigy Restricted Maintenance Page 3 Connecting the Counter 53131A#010 The counter is connected to the 10 MHz OUT BNC connector on the connector panel of the TH

Verigy Restricted Maintenance Page 4 Execution Times The execution times were influenced by the following changes: + removal of TES test (- 2 hours) + removal of unnecessary measurement ranges/points not used in auto cal as references (~25%) − introduction of LAN to GPIB gateway added overhead Execution times: 512 pin system:~4 h 1024 pin system:~8 h

Verigy Restricted Maintenance Page 5 Basecal/Tracecal Strategy NIST traceable calibration base calibration exchange hardware PASSED FAILED Diagnostic and auto calibration NIST traceable Calibration for exchanged HW FAILED PASSED auto calibration <= 6 months test system is now NIST traceable calibrated The flow chart shows when to exchange hardware for systems that have seen a tracecal/basecal in the last 6 months.

Verigy Restricted Maintenance Page 6 Basecal/Tracecal Strategy NIST traceable calibration base calibration PASSEDFAILED auto calibration NIST traceable calibration FAILED auto calibration exchange hardware Diagnostic and auto calibration NIST traceable Calibration for exchanged HW FAILED > 6 months test system has met last x months specification PASSED test system is now NIST traceable calibrated The flow chart shows when to exchange hardware for systems that have not seen a tracecal/basecal in the last 6 months.