Science Operations Phil Edwards 11 July 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.

Slides:



Advertisements
Similar presentations
Science Operations Phil Edwards 11 June 2013 CSIRO ASTRONOMY & SPACE SCIENCE.
Advertisements

Future CABB Data Reduction Mark Wieringa | Science Data Processing | Australia Telescope National Facility ATUC - 11 th June 2013 CSIRO ASTRONOMY AND SPACE.
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Science Operations Phil Edwards Head of Science Operations CSIRO ATNF.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
CABB Observations Preparations and Observing Mark Wieringa.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
ATNF Scientific Software – an overview Mark Wieringa – ATNF/Operations/SCA.
Mopra Operations Balt Indermuehle 13 June ATNF Mopra Operations What’s new at Mopra Telescope Operating Alerting Device Gotta love the TOAD! Mopra.
Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
Academic and Research Technology (A&RT)
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Implementation/Acceptance Testing CSE Week 8 / 1 CSE9020 Case Study Week 8 Implementation and Acceptance Testing.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
The SOC Pilot Project: MALT-90 Jessica Chapman CASS Observatory Operations Research Program Leader 9 September 2010 MALT90 Project – Presented and edited.
Science Operations Philip Edwards Head of Science Operations 26 May 2010.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Wideband Imaging and Measurements ASTRONOMY AND SPACE SCIENCE Jamie Stevens | ATCA Senior Systems Scientist / ATCA Lead Scientist 2 October 2014.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Engineering Operations: Parkes Development Projects Erik Lensson, SMIEEE, mSMPTE Head, Engineering Operations 29 October 2009.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
Data Handling and Reduction Jamie Stevens May
CHEP'07 September D0 data reprocessing on OSG Authors Andrew Baranovski (Fermilab) for B. Abbot, M. Diesburg, G. Garzoglio, T. Kurca, P. Mhashilkar.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
Science Operations Philip Edwards Head of Science Operations 29 October 2009.
ATUC meeting Director’s Report Brian Boyle November 2007.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
Academia Sinica National Taiwan University AMiBA System Performance Kai-yang Lin 1,2 and AMiBA Team 1,2,3 1 Institute of Astronomy and Astrophysics, Academia.
1 Computing Challenges for the Square Kilometre Array Mathai Joseph & Harrick Vin Tata Research Development & Design Centre Pune, India CHEP Mumbai 16.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Operations Philip Edwards Head of Science Operations 28 October 2008.
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
1 KFPA Critical Design Review – Fri., Jan. 30, 2009 KFPA Data Pipeline Bob Garwood- NRAO-CV.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Spectrometer: Overview and Products Roberta Paladini NHSC/IPAC.
ASKAP Update David DeBoer ASKAP Project Director 26 May 2010.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Graeme Carrad Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 28 June 2011 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback.
CABB support and ATCA flux calibration Jamie Stevens ATCA Senior System Scientist 26 May 2010.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
The CSIRO ASKAP Science Data Archive Progress and Plans
NRAO VLA Archive Survey
Science Operations Phil Edwards | Head of Science Operations
Rick Perley National Radio Astronomy Observatory
ATCA/Mopra report Phil Edwards ATUC meeting 6 November 2007
A Draft Funding Model for the SKA
Australia Telescope Users Committee Technologies Report – October 2011
Presentation transcript:

Science Operations Phil Edwards 11 July 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE

Visitor Services Group Computing Infrastructure Scientific Computing & Archives Telescope Operations & Science Services Parkes ATCA Mopra Tidbinbilla Long Baseline Array Outline Sci Ops | Page 2

Marsfield Lodge upgrades kitchen repainted and refloored all bedrooms repainted external window shutters on all rooms quieter bathroom fans installed soundproofing membrane added to all adjoining bedroom walls sealed doors for all bedrooms (yet to be completed) matting on walkways for noise reduction Consideration of Marsfield Lodge priority for SOC users Successful annual meeting of VSG in May Visitor Services Group Sci Ops | Page 3

Rearrangement of disk storage at Marsfield Parkes network upgrade completed Narrabri “temporary” fibre repair work still in effect Linux High-Availability, two server clusters for on-line observing servers New observing machines & 30” monitors for ATCA & Mopra SOC preparations Computing Infrastructure Sci Ops | Page 4

Parkes RAPT project underway pySPOT operational Improved compressor monitoring & alarms Pulsar data archive moved to disk ATCA: 16cm (“L/S”) and 4cm (“C/X”) attenuator control added Mopra: MoniCA alerts implemented, including Genset control ATOA: MALT data & CMZ data products added ASKAP integration into operations: wiki, source code repositories, build systems, ASKAPsoft use for CABB data, look at use of ASKAPsoft components for CAOBS replacement Scientific Computing & Archives Sci Ops | Page 5

ATCA datasets, esp. multi-zoom-band observations, are big! The Marsfield machines hydra, draco, & serpens are available to all users for data reduction Diskspace can be reserved for large datasets Miriad support for large (>8GB) scratch files and large image cubes has improved spectral coordinate handling updated to WCS standards (and WCSLIB: v released) Recent Miriad changes are described in updates on ATCA forum ATCA Data Reduction Sci Ops | Page 6

Is there a standard procedure for dealing with the wide 1.1—3.1 GHz BW and getting good quality information on the radio structure, spectral index and polarisation? Careful choice of tvchan range when observing is important for valid Tsys measurements, but it is possible to recover from bad Tsys. Pgflag has been upgraded to include an automatic flagger based on the 'SumThreshold' algorithm used by LOFAR. This algorithm is quite effective at quickly removing RFI at 16cm. A polarisation calibration memo is nearing completion. A better determination of the 16cm beam shape is in progress. Discussion, debate, and tips at RFI characterisation and subtraction under investigation ATCA 16cm data reduction Sci Ops | Page 7

APR semesters2009 MP2010 MP2011 MP2012 MP2012 CA2012 PK Astronomy71%63%60%69%64%70% Maintenance10% 5%18%17% Unallocated14%22%23%19%12% 7% VLBI 5% 7% 6% Telescope Operations & Science Services Sci Ops | Page 8 Figures are allocations as initially scheduled and do not take into account subsequent allocations of Director’s (“green”) time. s to all ATCA, Parkes, Mopra & LBA users with recent updates New (user friendly) ATCA sensitivity calculator

Reduced number of receiver changes planned in 2012OCT. Proposers advised MB20, 10/50, and H-OH receivers are expected will be available in the 2012 OCT semester, with the availability of other receivers driven by proposal pressure. Highly graded proposals requesting a receiver that is not installed in the focus cabin in 2012 OCT will be reconsidered for scheduling in the 2013 APR semester with the same grade, without the need to resubmit the proposal. Teams will be notified after the scheduling process is complete, if this applies to their proposal. “ATUC encourages CASS to be mindful of the effects of minimal receiver changes on LBA requirements.” Parkes Sci Ops | Page 9

Scheduling for 12APR better accommodates changes to the 1MHz zoom mode and DA training 64 MHz CABB mode has 1 zoom per IF. Call for proposals advises multi-zoom mode expected by beginning of 2012OCT Many recent improvements to CABB usability WVRs installed – commissioning and integration continuing Flux density calibration checks with EVLA & WMAP indicate flux density scales agree to < 5% ATCA & Miriad user guides – are print or html versions more widely used? The current currency requirements for remote observing are not sufficient… ATCA Sci Ops | Page 10

It is clear the current requirements are not sufficient, which has led to the suggestion of a points-based qualification system. An example might be that 100 points are needed to qualify, and: Been DA in the last 6 months:+100 points Been DA 6 – 12 months ago: +80 points Observed from Narrabri in last 6 months: +30 points per observation Observed from Narrabri in last 6 – 12 months:+20 points per observation Observed remotely in last 6 months:+10 points per observation Observed remotely in last 6 – 12 months: + 5 points per observation Completed observer feedback form:+10 points Submitted (non-trivial) Fault Report:+10 points Contributed to ATCA forum: +10 points Submitted rem obs request < 2 weeks in advance:- 10 points Qualifying for ATCA remote observing Sci Ops | Page 11

EVLA Comparing the New Scale to ATCA Calibration of the Jan 2012 data is ongoing. We show below the comparison from Dec The ATCA-VLA scales appear to be the same to within the errors, except perhaps at 28 GHz.

The Mopra call for expressions of interest, released in November 2011, solicited interest in operating the Mopra beyond October “ATUC urges CASS to determine all PhD students who will be adversely affected by the closure of Mopra and ensure that these students and their supervisors are fully aware of the imminent closure so that they can make alternate plans.” Mopra Sci Ops | Page 13

Presentation title | Presenter name | Page 14

The 70-m will be unavailable for 7 months from the middle of November 2012 due to maintenance downtime A new 4-channel K-band receiver and down-converter system has been installed on the 70m. This system supports two simultaneous beams per polarisation (four beams in total) between 21 GHz and 25 GHz. Development of on-the-fly mapping for spectral line observations is ongoing. Currently, a pipeline has been set up to utilize python scripted ASAP/gridzilla/miriad to generate maps from spectral line fits of grids of pointed observations. Tidbinbilla usage in 2011 was 260hr single dish, 160hr vacation student & Honours projects, 150hr LBA observations. Tidbinbilla Sci Ops | Page 15

Record number of LBA proposals in 2012APR, oversubscription correspondingly high Mopra 6cm/3cm (“C/X”) band receiver removed in May 2012 to enable ATCA 4cm upgrade to proceed with 6 antennas available at all times “ATUC urges CASS to continue supporting VLBI observations with Mopra.” The Mopra call for Expressions of Interest noted that “CSIRO wishes to retain a level of access to Mopra for the Long Baseline Array (LBA) as part of any new operating arrangement” RadioAstron satellite launched in July 2011, with CSIRO RadioPhysics supplied 18cm receiver on-board. Fringe-test observations with LBA elements in April and May 2012 Long Baseline Array Sci Ops | Page 16

Observing time (in hrs) by year and band cm cm cm cm cm total

Thank you CASS/ATNF Phil Edwards Head of Science Operations t wwww.atnf.csiro.au CSIRO ASTRONOMY & SPACE SCIENCE