John D. Bozek AMO Commissioning & Nov. 11-13, 2008 SLAC National Accelerator Laboratory AMO Installation & Commissioning.

Slides:



Advertisements
Similar presentations
Design and Experimental Considerations for Multi-stage Laser Driven Particle Accelerator at 1μm Driving Wavelength Y.Y. Lin( 林元堯), A.C. Chiang (蔣安忠), Y.C.
Advertisements

Imaging x-ray generation and Scattering Tabletop soft x-ray coherent imaging microscopes.
1 Enhancements to the Linac Coherent Light Source.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
John Bozek AMO Proposal June 2-3, The AMO Instrument & Science Drivers John Bozek, LCLS Scientific Program Sample.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
1 A Grating Spectrograph for the LCLS Philip Heimann Advanced Light Source Observe the spontaneous radiation spectrum of the individual undulators Observe.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
1 John D. Bozek 1 AMO Instrument FAC - June 2009 AMO Commissioning Plans John Bozek June 9, 2009.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
John Bozek AMO Proposal June 2-3, The AMO Instrument & Science Drivers John Bozek, LCLS Photon beam parameters.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
Michael Rowen LCLS FAC November 12, 2008 The SXR Instrument The SXR is a instrument for Soft X-ray Materials Research on.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
The DESY Gas Monitor Detector (GMD) at the SXR beamline at LCLS Stefan Moeller, LCLS Kai Tiedtke, Svea Kreis, Fini Jastrow, Andrei Sorokin (DESY) Michael.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Photon Diagnostic Station For TAC IR-FEL Test Facility ILHAN TAPAN* *on behalf of the TAC collaboration Uludag Universitesi, Bursa,16059, TURKEY References.
Alvaro Sanchez Gonzalez Prof. Jon Marangos Prof. Jim Clarke
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Basic Energy Sciences Advisory Committee MeetingLCLS February 26, 2001 J. Hastings Brookhaven National Laboratory LCLS Scientific Program X-Ray Laser Physics:
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Drive-Laser Commissioning Status and Plans
The AMO Instrument & Science Drivers John Bozek, LCLS
Experimental Facilities Planning
Schedule and Priorities 2018 / 2019
LCLS Instrument Development
Revised Commissioning Strategy
LCLS Ultrafast Science Instruments
Diagnosis of a High Harmonic Beam Using
Advanced Research Electron Accelerator Laboratory
Stefan Moeller – XES Manager May 14, 2009
John N. Galayda – Director of LCLS Construction March 30, 2009
X-ray Pump-Probe Instrument
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-ray Pump-Probe Instrument
AMO Early Science Capability
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
Coherent X-ray Imaging Instrument WBS 1.3
Scientific goals of the instrument Status before the CR
Status of ELI Beamlines
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Photon Systems Overview
Presentation transcript:

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory AMO Installation & Commissioning Plan John Bozek, LCLS Location Change Scientific Motivation Design & status Next Steps: Procurement/fabricationAssemblyTestingLaserControls Comissioning plan 1

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory The AMO Instrument Represents work of many people: Team leaders: Lou DiMauro, Nora Berrah, Linda Young, Phil Bucksbaum Engineering: Jean Charles Castagna, Michael Holmes, Michael Kosovsky, Nadine Kurita Controls: Gunther Haller, Amedeo Perazzo, Dave Nelson, Christopher O’Grady,… Laser: Greg Hayes, Bill White LCLS Management: Stefan Moeller, John Arthur With apologies to whomever I’ve forgotten 2

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Location of AMO experiment was changed… 3 AMO on soft x-ray branch eV

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Scientific Goals of the AMO instrumentation Investigate multiphoton and high-field x-ray processes in atoms, molecules and clusters Multi-photon ionization/excitation in atoms/molecules/clusters Accessible intensity on verge of high-field regime Study time-resolved phenomena in atoms, molecules and clusters using ultrafast x-rays Inner-shell side band experiments Photoionization of aligned molecules Temporal evolution of state-prepared systems 4

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory AMO Instrument Components Optics High Field Physics Chamber Gas jet Electron TOFs Ion spectrometers X-ray spectrometers Chamber, shielding, pumping, shutter, etc Diagnostics Chamber Magnetic bottle electron spectrometer Beam screens Pulse energy monitor Pulse picker 5

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory AMO Instrument Design – focusing optics Peak intensity depends on size of beam focus – accessible physics depends on intensity FocusW/cm 2 1mm7× μm7× μm7× μm7× nm7× Interaction region ~140m from source 825 eV  m 825eV  rad Unfocussed beam diameter ~1.1mm Focusing optics ~1m from interaction region

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Experimental station – Pulsed Gas Jet 7 Gas jet chamber X ray beam Turbo pump Skimmer Interaction region

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory High Field Physics – Ion Spectrometers 8 Ion Time of Flight Ion imaging spectrometer Momentum resolving Ion spectrometer

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Experimentation station - ETOF 9 Detector Electrical lens Magnetic shielding Actuators

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory High Field Physics – eTOF Five electron spectrometers arrayed around interaction region 10

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory 11 Positioning stand Gas jet chamber ETOFs Ion TOF Experimental chamber X-ray beam HFP station functions Provide UHV environment for experiment Support 5x ETOF spectrometers Support Ion TOF Support pulsed gas injector Analyze beam focus footprint Provide magnetic field free environment Position the IR at the beam focal point Support diverse diagnostics High field physics station

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory AMO Instrument - Diagnostics Diagnostics in a separate chamber with: Magnetic bottle spectrometer Measures photon wavelength and bandwidth Can also be used to measure temporal overlap of FEL & laser beam Pulse energy monitor Measures pulse energy on each pulse Copy of the XTOD gas monitor Two beam screens Measures position & size of beam Either geometric or coherent interference based 12

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Diagnostics – Magnetic Bottle Single shot electron energy spectrum – measure photon energy and bandwidth 13 Design courtesy of Chris Roedig (Lou DiMauro’s group at OSU).

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory 14 Diagnostics station X ray beam Positioning stand Gas jet chamber Diagnostic chamber Diagnostic station functions Provide UHV environment for experiment Support magnetic bottle spectrometers and magnet positioner Support gas injector Support diverse diagnostics Position the IR in the beam path

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory NEH Laser 15 Experiment Chambers Optical Transport Harmonics Pulse Compressor (Single Grating) Optical Transport Pulse Cleaner Regenerative Amplifier 1kHz, <5 mJ 30W Nd:YLF Pump 527nm 1.2 kHz 30 fs Mode Locked 800 nm 5 W Nd:YVO 4 Pulse Stretcher 30 fs Bandwidth Laser Hall Hutch 1 DIAGNOSTIC SUITE -Spectrometer -Autocorrelator -Frog -Beam Analyzer -Power Meters -Oscilloscopes

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Fabrication & Assembly Installation manager hired to oversee procurement & fabrication phase Adapting tools used in the fabrication & installation of electron beam components Working with SLAC Mechanical Fabrication Department to fabricate and assemble instrumentation Space in one of their vacuum shops for assembly 16

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Commissioning Plan Begin off-line testing of controls once hardware is in place table movements when stands assembled – Jan 2009 Vacuum controls when vacuum system assembled – Feb 2009 Test stands of data acquisition hardware built in G. Haller’s labs 17

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Commissioning Plan Instrumentation to be commissioned off-line as it becomes available: Gas jet testing Movement of nozzle Timing of valve opening Pressure controls Safety and shutdown procedures 18

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Installation in Hutch 1 Each chamber to be moved into hutch fully assembled on stand – May 2008 Locate and mount to floor Connect utilities Water, power, exhaust Cable trays moved in simultaneously and equipment loaded into permanent racks connect & begin powering up systems with off-line check-out 19

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Commissioning Plan Assembled instrumentation installed in Hutch in May Possible to use NEH laser to generate ions & electrons in the spectrometers Start with ion spectrometer Sync laser to gas jet Measure ion charge state as fcn of laser intensity Extend commissioning to electron spectrometers & diagnostics in hutch 20

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Installation/Commissioning of Optics Optics are being built as a stand-alone package at LBNL (N. Kelez) Optical substrates recently ordered with 5 mo delivery time Coated with B4C at LLNL (R. Soufli) Metrology of bender and repeatability at LBNL using LTP Delivered with vacuum system & stand 21

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Commissioning Plan First FEL light in June/July 2008 Carefully illuminate & align components with spontaneous or attenuated FEL radiation Ensure operation of instrumentation without focused light Ion TOF Electron TOF’s Magnetic bottle Pulse energy monitor Beam screens 22

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Commissioning Plan Once instrumentation is operating, start using focusing optics Focal properties of elliptical optics very sensitive to alignment Non-destructive feedback mechanism required Start with imprinting beam into a PMMA film In-vacuum movement of paddle to a microscope with 3um resolution Eventually use ion charge state distribution as measure 23

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory 24 Ne charge state vs Intensity Rohringer & Santra, PRA 76, (2007)

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Installation & Comissioning Jan - May 2009 – Assembly in vac shop Feb - May 2009 – offline testing of controls May 2009 – install into hutch June 2009 – laser based comissioning July 2009 – FEL commissioning August 2009 – Ready for initial User Operations ! 25

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory 26 Outcome of 1 st LCLS call for proposals “Experiments at the AMO beamline” 28 proposals were received – 19 in the field of AMO, 6 for imaging experiments, and 1 for diagnostics, detector and damage studies, respectively. All together 219 scientists are involved in these proposals, many of them in more than one. Australia4Ireland1 China2Italy8 Czech Republic4Japan6 Denmark1Netherlands4 Finland1Poland3 France 1 Sweden 26 Germany70United Kingdom1 India 4 United States 83 In any case, after submission of the proposals LCLS management will seek additional input from the instrument scientists regarding experiment feasibility and from the LCLS safety officer. The whole dossier is then forwarded to the Proposal Review Panel (PRP).

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Risks to success AMO Experiments Late delivery of optics Mirrors on order with 4-6mo delivery (Zeiss) Struggling to get MOU in place with LBNL Started process in May 2008 Lack of experience with gas jet Ideally have operational experience to develop knowledge of available operating parameters Need to determine which parts to have on hand as spares in case of failure (limited by delivery time etc) 27

John D. Bozek AMO Commissioning & Nov , 2008 SLAC National Accelerator Laboratory Risks to success AMO Experiments Schedule pressure Only one experiment operational in first run Need to schedule down time to modify/repair Require some flexibility to accommodate changes required by users for different experiments Also require support – mechanical engineering, controls, data acquisition – to incorporate user supplied hardware 28