Weaknesses of the LHC Machine Protection System Bernhard Holzer, CERN BE-ABP... what a MPS should do: 2 major tasks * protect the machine in case of hardware.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system.
12/03/2013MPP Workshop Annecy Update on Beam Failure Scenarios Jan Uythoven Thanks to: T.Baer, R.Schmidt, J.Wenninger, D.Wollmann, M.Zerlauth, other MPP.
PAC June LHC Machine Protection Rüdiger Schmidt R.Assmann, E.Carlier, B.Dehning, R.Denz, B.Goddard, E.B.Holzer, V.Kain, B.Puccio, B.Todd, J.Uythoven,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Concept & architecture of the machine protection systems for FCC
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Introduction: FCC beam dumping system
SPS extraction, transfer lines, injection
The LHC - Status Is COLD Is almost fully commissioned
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Vacuum System Failures at HERA
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Joint Meeting SPS Upgrade Study Group and SPS Task Force
J. Wenninger, A. Macpherson BE-OP
Initial Experience with the Machine Protection System for LHC
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine Protection Xu Hongliang.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
M. Zerlauth, I. Romera 0v1.
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Machine Protection System Commissioning plans
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
The LHC Beam Interlock System
LHC Morning Meeting - G. Arduini
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Friday 15th February - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Feedbacks & Stabilization Getting them going
HI2011 Commissioning Status
Presentation transcript:

Weaknesses of the LHC Machine Protection System Bernhard Holzer, CERN BE-ABP... what a MPS should do: 2 major tasks * protect the machine in case of hardware / software failure * protect the machine in case of... " the experts " Personal Definition: I consider a quench already as something that should be avoided

- wrong sextupole polarity in the yellow ring (systematically) due to cpu problem of the machine physicists - BPM signals between the two rings interchanged... again systematically - wrong BPM polarity at single BPM's - dead BPM... indicating still an oribt offset of some mm --> orbit correction algorithm tries to "compensate" and in the end there are indeed 10 mm real offset. - vacuum valves are indicated as open... but in reality are closed... a nice beam dump - aluminum foil inside the vacuum chamber... they just forgot to take it out - horizontal orbit correctors distort significantly the beam momentum on the first turn - Luminosity with 110 Bunches is not higher than with 55 bunches... injection kicker diluted the transverse beam emittance 1.) Practical Applications of Murphy's Law:... just some examples from RHIC: stories that you normally don't hear in EPAC reports

2.) What are we talking about ??? Experience from HERA: the Machine Protection System has to handle a large number of "events"... larger than I myself expected... reasons spread over all hardware components beam current beam loss alarms, very fast beam loss alamrs ( < 5ms) and quenches in the first HERA run years per week.

2.) Where do the problems come from... just a number of most prominent examples: BPM's BLM's Power Converters RF (...can lead not only to dc current but to fast losses) Vacuum Experiments (!) Operateurs (!) Weakness of the MPS: clear enough: we should not forget any component but the MPS is only watertight if the hardware is perfect the logic of the software is ok if the protection system is redundant !!

Simple Example: the BPM's (... sorry Rhodry) Example RHIC / HERA local offset in a BPM during Lumi-Run: Δx ≈ 16 mm leading to several quenches at injection and flat top BPM's are the backbone of the machine diagnostics system but they can be dead, show the wrong polarity, develop an offset and this can change spontaneously MPS might recognise a dangerous orbit ---> trigger the dump Orbit correction loop might compensate via local steering ---> BLM alarm / quench

Special situation: 90° lattice cite of the logbook 180 deg-bump check: WR 579 CX -5A WR 626 CX +13A WR 673 CX -5A Lapidar Example: the BPM's 90°

3.) What can go wrong ? a rough statistics of 20 years HERA Injection: too early (during magnet cycle) too late (during accleration) into a filled bucket (timing problem) with kicker/septum off with magnet at transferline off after wrongly applied injection correction... why ??? with closed collimators with closed vacuum valve with wrong magnet polarity (after maintenance day) Acceleration: failure of persistent current compensation errors in ramp correction tables tune jump during polarity switch of a quadrupole collimators too close to the beam head tail problems (chromaticity correction) magnet failures Luminosity: aperture limitations due to RF fingers beam quality issues: beam beam spoils the emittance (up to beam losses at the aperture limit) orbit correction loop: coil at limit or off dedicated beam orbit steering coasting beam (rf problems) failure at dump kicker failure of dump timing system collimator control defect (radiation problem) error in BLM / BPM signal processing (server) vacuum valve closes during luminosity run Nota bene: each of these errors lead to a beam loss alarm or quench

4.) Nice example, because it was unexpected: strong development of dc current (coasting beam) due to rf noise sudden jump of the rf timing by 18 ° dc current develops after a while sudden jump of the rf timing by several bunch positions dump kicker gap filled DC beam contribution broken connection between rf pre amplifier & main driver in the tunnel..."excellent" noise amplification... driving DC contribution... spoiling several luminosity runs accumulating up to 20 % DC contribution... scraping... did not solve the problem... problem for the dump gap

5.) Detection of Beam Losses Example HERA-p loss pattern around the storage ring beam losses seen by a single BLM failure of standard magnet (dipole /quadrupole) beam losses seen by a single BLM failure of a critical power converter --> very fast losses --> quench cannot be avoided --> and eventually damage of components Problem: MPS was not redundant in special cases a single system (eg. the BLMs) is not sufficient for the machine protection. Solution... in special cases: FMCM direct & fast link between power converter & dump system

6.) Possible Weakness of the LHC Machine Protection System... ? Analysis of fast beam losses (A. Gómez) Phase space deformation in case of failure of RQ4.LR7 Short Summary of the studies: quench in sc. arc dipoles: τ loss = ms BLM system reacts in time, QPS is not fast enough quench in sc. arc quadrupoles: τ loss =200 ms BLM & QPS react in time failure of nc. quadrupoles: τ det = 6 ms τ damage = 6.4 ms failure of nc. dipole: τ damage = 2 ms → FMCM installed

Possible Weakness of the LHC MPS: Analysis of fast beam losses (A. Gómez) worst case: nc. dipole magnets: RD1.LR1 / LR5 simulaion of beam losses due to failure of RD1 damage level reached after 25 turns τ BLM react. ≈ τ damage FMCM intsalled... but redundancy does not really exist... does it make sense to contemplate about a fast AC beam current monitor in LHC ??? experience is excellent: combination of fast FMCM and AC-BM installed at HERA in 2003/2004

7.) Possible Weakness of ANY Machine Protection System... ?... the human beings HERA run year 2007 number of beam dumps and the reasons for it rf (4 systems) water cooling power converters cryo systems... and the operators

7.) Possible Weakness of ANY Machine Protection System... ?... the human beings especially problematic: the Monday morning effect, in other words: the experts * are actions that are dangerous really inhibited by the MPS ??? * is it possible to trigger actions from outside the CCC ??? eg. wire scanner / collimator from the office eg. power converters actions on site at the local controller Examples: correct bump but wrong IP --> BLM alarm local change of magnet currents --> BLM alarm wrong files in the sequencer --> spoils the machine run for a day !!! (still today I could kill the person) firing the wires for demonstration from the office only the expert can retract the collimators without warning... and he did * is it possible to stop actions of the control system ? Can the operator or the MPS stop / inhibit orbit corrections / bumps / sequences in case of trouble Does / Should the MPS communicate with the control system ??

UPS TimingSoftware Interlocks LHC Beam Interlock System Powering Interlock System BLMs aperture BPMs for Beam Dump LHC Experiments Collimators / Absorbers NC Magnet Interlocks Vacuum System RF + Damper Beam Energy Tracking Access Safety System Quench Protection Power Converters Discharge Switches dI/dt beam current Beam Dumping System AUG DCCT Dipole Current 1 DCCT Dipole Current 2 RF turn clock Cryogenics Beam Dump Trigger Beam Current Monitors Current BLMs arc BPMs for dx/dt + dy/dt dI/dt magnet current Energy SPS Extraction Interlocks Injection Kickers Safe LHC Parameters Energy essential circuits auxiliary circuits Screens SafeBeam Flag Energy TL collimators Software Interlocks Operators 8.) An Evident Weakness of the Machine Protection System... ?... its complexity

140 "user systems" can trigger the alarm, each containing sometimes 1000 single devices infinite number of possible alarms need systematic checks establish procedures for testing, masking, book keeping... "issue tracking" needs a lot of self disciplin 8.) An Evident Weakness of the Machine Protection System... ?... its complexity some bad HERA examples 1994 One Mega Quench (beam induced) the head of the machine disabled the BLM system because of too many false alarms too many false alarms... will be ignored

8.) An Evident Weakness of the HERA Machine Protection System... ?... its complexity stable luminosity run in 2005 nice background situation, good lifetime, everybody is happy... and the alarm system would like to dump the beam. the real problem: alarms are masked and ignored

9.) For the Fun of it: Weakness of the HERA Machine Protection System... ?... its experiments provocative statement: there are a number of secondary collimator jaws and as primary collimators there are the FPS stations Beam Interlock System LHC Experiments Software Interlocks Operators Does the MPS control / inhibit the experimets ??

10.) Résumé: What we should avoid... but what happened in other machines

10.) Résumé: The LHC MPS, just some keywords for the coffee break t.q.m.m. 5 mm grove in the HERA proton collimator detected in 2003 after many years of operation. * complexity: establish procedures for testing, masking, book keeping needs a lot of self disciplin * redundancy: how many independent alarms do you get in case of failure ( AC Monitor ? ) * don't forget the human beings: they need information & training * avoid fake alarms What we should avoid... but what happened in other machines