Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Navigation solutions powered by Europe SUPPORT TO IWG25 12 th June 2013.
FAA’s Plan for the Future Use of GPS Briefed By: Kanwaljit S. Sandhoo (MITRE/CAASD) 8th European CGSIC/IISC Meeting, Prague December 2-3, 1999.
© 2013 The MITRE Corporation. All rights reserved. Tim Cashin, Dmitri Baraban, Roland Lejeune SBAS IWG #24 Meeting CNES, Toulouse, France January.
0 Chicago, IL March 6 th, 2007 Use Case Requirements, Design and Standards Selection HITSP Use Case Requirements, Design and Standards Selection Date:
Software Quality Assurance Plan
Presented to: Developed by: Presented by: Date: Federal Aviation Administration DFMC Satellite Selection Discussions IWG # 26 Jason Burns Feb 5-7, 2014.
Results of January 2007 Meeting of Working Group on the Questionnaire and Indicators 24 January 2007.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Absolute Receiver Autonomous Integrity Monitoring (ARAIM)
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Chapter 3: The Project Management Process Groups
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
© 2013 The MITRE Corporation. All rights reserved. SBAS IWG #25 Meeting St Petersburg, Russia June 2013 Roland Lejeune RTCA SC-159 Working Group.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
GPS Vulnerability Assessment CGSIC International Sub-Committee Meeting Melbourne, Australia February 10,   CAPT Curt.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
European Commission International Civil Aviation Organization Status of industry standards for GNSS CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May.
1 Lecture 5.2a: SEF Ch 8 SE Outputs Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Protecting GPS Transportation Infrastructure – Action Plan Status Report 43rd CGSIC Meeting Washington, DC March 10, 2004  CDR Peter Keane U.S. Department.
FAA GNSS Evolutionary Architecture Study
Presented to: MPAR Working Group By: Garth Torok, Weather Processors Group, Aviation Weather Directorate Date: 21 June 2007 Federal Aviation Administration.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Software Project Management
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
© 2013 The MITRE Corporation. All rights reserved. SBAS IWG #25 Meeting St Petersburg, Russia June 2013 Roland Lejeune Navigation System Panel (NSP)
1 FRENCH PROPOSAL FOR ESARR6 1 - BACKGROUND - 15/02/00 : Kick-off meeting, Presentation of the CAA/SRG input (SW01), Request from the chairman to comment.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
Present and Future of China Satellite-Based Augmentation System China Satellite Navigation Office February 2014.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
© 2014 The MITRE Corporation. All rights reserved. SBAS IWG #26 Meeting Delhi, India 5-7 February 2014 Roland Lejeune RTCA SC-159 Working Group 2 Summary.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
Presented to: By: Date: Federal Aviation Administration Death Valley National Park Aviation Rulemaking Committee Update NPOAG Lelaina Marin / Pete Ciesla.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Implementing Program Management Standards at Duke Energy.
Innovation, Science and Economic Development Canada (ISED) 600 MHz Repurposing RABC 600 MHz Working Group Meeting Innovation, Science and Economic Development.
1 EU funding for sustainable energy. 2 Standardisation Ivan Konaktchiev Certification Engineer.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Project Management PTM721S
CEOS Response to GEOSS Water Strategy
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
SIP/2012/ASBU/Nairobi-WP/7
Outcome TFCS-11// February Washington DC
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Todd Walter Stanford University
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Presentation transcript:

Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update

2 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Outline Background / Purpose Task Progress Review Discussion areas

3 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Background and Purpose IWG has identified the need for a DFMC Definition Document outlining a requirements concept for Dual Frequency Multi-Constellation (DFMC) SBAS A draft work plan to develop this document was presented at Ottawa 2012 (IWG-23) –Presented again at IWG-24 This work plan status update –Identifies efforts in progress Should assess progress based on presentations –Identifies areas with little to no effort 3

4 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Tasks Operational Concept –Operational Goals and Services –GEO Selection and Transition –Reversionary Modes –Identify Benefits System Requirements –Interchangeable Satellites –Safety Strategy –Avionics Design Constraints Interface Definition –Interface Requirements –Interface Control Document Definition Document

5 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Operational Goals and Services Objectives –Identify minimum target operations and supporting services –Propose service classification schemes for coordination with standards bodies Status –Initial proposed operational targets discussed at IWG 23. Documented in Work Plan Section 2 –Fairly well documented in Definition Document outline Contains no new services or operations beyond current DO-229 –Need to update if there are specific changes for ADS-B or TBO

6 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 GEO Selection and Transition Objectives –Enable SBAS interoperability when transition between different operations, GEO coverage volumes, SBAS service volumes, international airspace and state airspace. Status –Briefing and white paper available on options provided at IWG-26 (Feb 2014) –Requires IWG discussion/guidance on narrowing options Request comments by April 30, 2014 –Can develop specific recommended requirements based on SBAS selection method White paper 2-4 months after decision on selection method

7 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Reversionary Modes Objectives –Identify minimum required avionics modes and supporting navigational services to support preferred fallback strategy and minimum operations. Status –Briefing prepared by MITRE for IWG 24 –ESA brief (IWG 26) and white paper (April/May 2014) Deliverables DescriptionDeliverablePOCDue Date Benefits Analysis of L5 only service and whether to define it as an optional mode ReportEurocontrolStill need to resolve White Paper identifying preferred set of modes for avionics and corresponding SBAS Services White PaperMITREComplete IWG 24 Standard User Algorithms specification/definition, verification and justification, for each individual algorithm. Extract of PROSBAS D2.3.1 Document EC/ESA Internal ESA/EC review April/May 2014 : Input for IWG DFMC Document

8 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Identify Benefits Objectives –Identify benefits for ANSP and avionics manufacturers Status –No definite plan to address –Any interest, commitment from new States Support for SBAS reference stations Approval of SBAS service based on dual-frequency DescriptionDeliverablePOCDue Date Draft Benefits section of Definition Document Draft SectionsTBD Documents results of feasibility analysis. Identifies key risk areas and future work. White PaperTBD

9 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Interchangeable Requirements Objectives –Identify technical issues necessary to support this capability –Derive requirements necessary to mitigate technical issues –Identify and quantify any resulting technical risks associated with this capability and the derived requirements. Status –ESA Position Computation Equations Definition of Inter System Issues (Geodetic References, Time References, Inter System Bias) April/May input for DFMC Definition Document

10 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Objectives –Explain high level safety strategy and clearly identify subsystem safety objectives (e.g. integrity and continuity performance targets) Status –No drastic change from current SBAS standards on approach to safety (e.g. not reallocation of integrity between ground and airborne subsystems) –ESA Protection Level Calculations Brief at IWG-26, April/May input for DFMC Definition Document –Threat list or modification of Safety Strategy effort not underway Propose using threat listed in ARAIM paper (see additional briefing) Safety Strategy DescriptionDeliverablePOCDue Date Safety Strategy of Definition DocumentDraft SectionsIWGTBD Threat ListWhite PaperIWGTBD User Performance Allocations - Airborne and ground subsystem integrity and continuity allocations Extract of PROSBAS D1.3.2 Document EC/ESA Internal ESA/EC review April/May 2014 : Input for IWG DFMC Document Specification, Verification and Justification of the SBAS L1/L5 Standard User performances, both for each individual performance, and for the global Performance Extract of PROSBAS D2.4.1 Document EC/ESA Internal ESA/EC review April/May 2014 : Input for IWG DFMC Document Draft Definition Document sections for airborne and ground subsystem performance requirements Draft SectionsFAATBD

11 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Avionics Design Constraints Objectives –Identify key minimum design constraints which avionics must comply with to enable DFMC concept Status –Briefed Signal Quality Monitoring and recommended correlation requirements (IWG-25, RTCA Oct 2013) –ESA working aviation error budgets DescriptionDeliverablePOCDue Date Airborne and Ground subsystem tracking requirements, RF requirements, etc. Draft SectionsFAARTCA brief Oct 2013

12 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Interface Requirement Objectives –Develop interface requirements Status –Reached consensus on ICD changes –Need to document signal format changes and accompanying requirements E.g. propose redlines to DO-229D, Appendix A which describes current signal specification DescriptionDeliverablePOCDue Date SIS RF DefinitionExtract of PROSBAS D2.1.1 Document Existing eurocae complemen ted by EC / ESA 4 versions : May 2013, Nov 2013, May 2014, Nov 2014 Interface RequirementsDraft SectionsTBD

13 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Interface Control Document Objectives –Develop the message structure for DFMC GEO L1 and L5 SIS Status –Reached consensus on ICD changes – Dec 2013 Briefed at IWG 26 Working on updated ICD –Recall previous SiS, transport layer effort DescriptionDeliverablePOCDue Date SiS Messages DefinitionExtract of PROSBAS D2.2.1 Document EC / ESABeginning 2014 Assessment of Message performances Extract of PROSBAS D2.2.2 Document EC / ESA PROSBAS ION GNSS paper Trade analysis of formatting optionsPresentationsEC/ESA PROSBAS ION GNSS paper Stanford ION GNSS paper Documentation of preferred format, including preliminary IRD and ICD information. Extracts of PROSBAS Documents EC/ESAIWG (mid 2013) Draft Interface Control Document (ICD)Draft ICDEC/ESABeginning 2014 Detailed Interface Control Document (ICD)Interface Control Document TBDUpdate release end 2014, modify through standards process

14 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Definition Document Objectives –Identify required Definition Document content and assign resources –Maintain Definition Document and populate with information when available Status –Initial outline drafted. Briefing prepared by FAA for IWG 24. –Updated expected following white paper receipt April/May 2014 Deliverables DescriptionDeliverab le POCDue Date Draft initial Definition Document outline identifying sections needed to address key DFMC concept issues. DFMC Definition Document Outline FAADec 2012 Incorporate all sections into the Definition Document. Finalize draft for IWG review and approval. DFMC Definition Document FAADec 2014

15 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Discussion Areas Benefits for Dual-Frequency SBAS Benefit of optional L5 ionosphere grid broadcast Safety strategy –Threat list / threat identification –Effort required if desire to support operations more demanding than LPV-200 Interface Requirements Document

16 Federal Aviation Administration DFMC Work Plan February 5-7, 2014 Summary Review progress of work plan Provided updates based on presentation at IWG 26 Identified work plan topics at risk Discussed path forward Please provide comments to

Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration Backup