FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

FAIR Synchrotrons SIS100/300
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors United States Particle Accelerator School – Accelerator Fundamentals.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
Installation of the T600 at Fermilab CSN2, September 22,
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
1 1/15 Status of the Nuclotron-NICA G.Trubnikov MAC, June 7, 2011.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
ELENA installation progress F. Butin / ELENA collaboration.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Report Technical Director Storage-Ring-Installation Completed
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
Powering LHC magnets version 30/3/2007.
ELENA installation and commissioning status
Hosting Orsay Walid KAABI
Powering the LHC Magnets
Business opportunities related to CERN electrical network
Rüdiger Schmidt and Karl Hubert Mess
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Machine Protection Xu Hongliang.
Proton Beam Diagnostics
Petra Schütt Operateurs-Schulung
CLIC damping rings working plan towards the CDR
Hardware Commissioning
Presentation transcript:

FAIR PROJECT COST BOOK

FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities 269 Meuro

FAIR Baseline costbook (1) Conceptual design Preliminary engineering design Vendor inquire R&D studies Expert estimates Technical and cost advisory committees Scientific and Technical Issues working group International Steering Committee

FAIR Baseline costbook (2) Civil construction and infrastructure BUNG Beratende Ingenieure Heidelberg Accelerator 5000 subtasks detailed design and costs Experiments Program Advisory Committees

1. Civil construction and infrastructure Peripheral supply systems Electric power supply systems Structural facilities Radiation protection

Peripheral supply systems Water Cooling Systems Air conditioning and ventilation systems Generation and distribution of compressed air Heating

Electric power supply systems 20 kV power supply system Clean power (2MVA Transformer, distribution) Power supply 10 units of 50kVA Emergency power supply Cables Communication systems Lighting

Structural facilities General site installation Groundwater lowering Recultivation Additional building costs (design, expertises) 52 buildings

Radiation protection Experiment access Radiation protection interlock Dose monitoring Activation monitoring Laboratory equipment

2. Accelerators TECHNICAL SYSTEMS Magnets Power Converters RF Systems Injection/Extraction Beam Diagnostics Vacuum Particle Sources Electron Cooling Stochastic Cooling Insertions/ Collimators Cryogenics Common Systems

MAGNETS Dipole Quadrupole – 998 Sextupole – 256 Octupole – 38 Steering magnets – 411 Correctors – 118 Superconducting busbars

POWER CONVERTERS Dipole Power Converters – 137 Qudropole Power Converters – 537 Hexapole Power Converters – 69 Octupole Power Converters – 74 Quench Heaters – 420 Steerars -1146

RF SYSTEMS Klystron – 7 Circulator – 7 Water load – 7 500W solid state driver – 7 Tube amplifier – 2 Power lines – 9 Tank from stainless steal – 15 Copper plating – 16 Acceleration system - 28

INJECTION / EXTRACTION Extraction kickers – 11 Injection kickers – 14 Knock out system – 1 Transfer kicker – 6 Injection extraction – 8 Transfer kickers – 6 Emergency kickers - 13

BEAM DIAGNOSTICS Resonant transformer – 33 Pulse transformer – 19 Cryo current comparator – 6 Particle detector combination – 23 Beam position monitor – 56 SEM grid – 54 Multi wire gas detector – 32 Current grid – 32 DC transformer – 4 AC transformer – 4

VACUUM Pumps – 1906 Vacuum chambers – Valves – 802 Bakeout system – 3316

PARTICLE SOURCES Duoplasmatron – 1 Power supplies – 1 Capacitor – 1 Gas regulator – 1 Extractor – 1 PS – 3 HV transformer – 1 Local controls – 1 Terminal cage – 1 Lifting ramp – 1 Faraday room – 1 Local safety - 1

ELECTRON COOLING Electron gun/Collector – 1 High Voltage system – 1 Magnet system – 1 Vacuum system – 2 HV ps + accel. drift tube – 1 HV equipments + magnets – 1 Drift tube – 1 Toroids – 1 Return solenoid – 1 Electric and controls - 1

STOCHASTIC COOLING PU for Accumulation – 1 PU for transverse cooling – 2 Kicker tank – 3 Low noise amplifier – 1 Power amplifiers – 30 Cryogenics pickup tanks – 3 Warm corrector tanks – 3

INSERTIONS / COLLIMATORS Halo collimation system – 5 Charge collimation system – 96 Degrader and ion catcher – 13 Production target – 41 Emergency dumb – 1 Target – 6 Antiproton collection - 5

CRYOGENICS Cryogenics transfer lines – 1980 Warm gas infrastructure – 1080 Empty cryostats – 1291 Helium distribution – 550 Helium jumper lines - 150

COMMON SYSTEMS Cable – AC cable – Voltage signal cable – Cryogenics plant – 3 Cryogenics distribution system – 1 Alignments – 10 Optical fiber – 8000 Twisted pair – Electronic personal dosimeter – 120 Mobile contamination monitor - 10

3. Experiments Detectors Fast electronics Data acquisition Computing Mechanics Infrastructure