Concrete Barrier placed at unauthorized median at Ch.263.800.

Slides:



Advertisements
Similar presentations
Components of Building Construction – Building 101 Basic knowledge of your buildings, how to maintain them and things to look for on your spring walkthrough.
Advertisements

Helping to Save Lives and Protect Infrastructure.
T1. DESIGN OF STEEL BEAMS Steel framed building
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
Art Nowak February 2013 STRUCTURE DESIGN MANUAL 1.
Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
Pavement Markings Quiz Q. 1 & 2. Pavement Markings Quiz Q. 3.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Sylvan Theater Column Restoration Project
Your Company Name Here Subtitle or Logo here. What is Concrete Engraving?
Overview of Routes, Linear Referencing Systems, & Dynamic Segmentation MTC GIS Users Group Meeting February 27, 2003.
Conventional Pavement Structure inches Graded Aggregate Base inches Asphaltic Concrete Paving Prepared Subgrade stress.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
BCT 102 Residential Printreading
4.6 Numerical Integration. The Trapezoidal Rule One method to approximate a definite integral is to use n trapezoids.
Maryland Transportation Authority (MDTA)
Story #2: The Berlin Wall ( )
Composite Pavements National Pooled Fund TPF-5(149) Task 1 Update Mihai Marasteanu.
Introduction to a pit installation
Why DURA-CRETE? DRIVEWAYS BY: YOUR NAME HERE. Agenda/Topics  DURA-CRETE Program History  DURA-CRETE The “Mix”  Installer’s Certification Process 
Roads And Bridges Development Corporation of Kerala LTD
Foundation Prints Unit 12.
Foundation Plan Layout
Road to Prosperity. UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE -PHASE I – PROGRESS REPORT AS ON Upgrdadation of airport seaport.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Types of Bridges Photos by J.S. O’Connor. Steel Multi-Girder.
LTPP Lessons Learned: Kansas SPS-2 July 17, 2013 Abilene, KS Gabe Cimini Database Manager, LTPP NRSC.
ROB at Koratty in lieu of LC No.54 Progress as on
A-Geometry Ch Review. 1. Solve: 2. Find x:.8 x 1.7 x = y y = 52.
VELOPEX EXTRA - X Mk 1V Automatic dental X-ray film Processor
2.2 Geometrical Application of Calculus
Work Progress Photos From 1 ST To 15 TH NOV 2015.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
AMERICAN SAMOA AIP PROJECTS IN HAND ARFF STATION PAGO PAGO ARFF STATION PAGO PAGO HOT FIRE TRAINING FACILITY FOR PAGO PAGO HOT FIRE TRAINING FACILITY FOR.
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
T. Kovács & L.E. Laczák Life-cycle design of concrete bridges The results discussed below are supported by the grant TÁMOP-4.2.2/B-10/ Budapest.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
Construction Methodology for Suramadu Main Bridge.
Call us on Toll-Free. Call Us Now Toll Free.
Toll Free Toll Free.
Call us on Toll-Free Call Us Now Toll Free.
Exterior Maintenance and Cleaning
Pervious Parking lot Matthew Cockerham.
Rongzong Wu, David Jones and John T. Harvey
Appropriate Measures & Extra Mean, Median, Mode, Range Practice
Surface Preparation before laying Hot Mix
Recover Yahoo Mail Password Forgotten Password
وكيفية عمل التقدير النجمي
Minuteman Vocational Technical Regional High School Progress
Course Contents Culverts Bridges Buildings 20 November 2018.
Project Scheduling – Critical Path Method (CPM)
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
ELCITA UPDATE December 2016.
Box and Whisker Plots 50% Step 1 – Order the series.
Box and Whisker Plots 50% Step 1 – Order the series.
Exterior Maintenance and Cleaning
Designed for a Capital experience!
Box and Whisker Plots 50% Step 1 – Order the series.
Untethered kirigami-skinned soft crawlers.
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Concrete Barrier placed at unauthorized median at Ch

Painting of Concrete Barriers at 2 nd Toll Plaza at Ch Concrete Barricade at unauthorized median cut at Ch

Cleaning of Gutter at Tatibandh Circular Junction.

Cleaning of Trapezoidal Drain at Ch LHS.

Asphalt Sealing of Pavement at Ch RHS. 1 st and 2 nd PSC Girder launched at Sarona ROB at Ch

All 9 nos. PSC Girder in place at ROB Sarona at Ch Deck Slab preparation for Sarona ROB at Ch