Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.

Slides:



Advertisements
Similar presentations
4-1 Application Workshop. 4-2 Module Objectives Apply the concepts learned to a freeway lane closure Case 1. Without a back up Case 2. With a back up.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
GDOT’s Metro Atlanta Ramp Meters
1. We can’t promise all green lights… …but we can minimize the number of red lights, stops and delays.
I-80 Corridor System Management Plan Alameda County Transportation Commission ACTAC Meeting September 7, 2010.
Virginia Department of Education
TRANSPORTATION SOLUTIONS: GETTING THE MOST BANG FOR YOUR BUCK! GPA Fall Conference 2013 Garth Lynch, PE, AICP HNTB Corporation October 10, 2013.
Transportation Engineering
INTERSTATE DRIVING Information Processing: Complex Risk Environments
Ramp Metering Pilot Project May 11th, 2010 E. Jason Sims, P.E. Kansas City Scout TMC Manager.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Regional Arterial Operation Traffic Responsive Control in Bellevue Washington State Intelligent Transportation Society 2008 ITS WA Annual Meeting Session.
Archived Data User Services (ADUS). ITS Produce Data The (sensor) data are used for to help take transportation management actions –Traffic control systems.
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
Congestion Reduction Using Intelligent Transportation Systems Ben Sperry University of Evansville University of Evansville MESCON March 25, 2006.
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
lesson 2.2 TRAFFIC SIGNALS
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
INTERSTATE DRIVING. Characteristics of Expressways Expressways/Controlled-Access Highways – vehicles can only enter and exit at interchanges. Expressways.
Expressway Driving. Characteristics of Expressway Driving Roadway Speed Interchanges No cross traffic Median Tollbooths Entrance/exit ramps Limited access.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Driving on Expressways.  An expressway is a limited-access or controlled-access highway-pg 222  Expressways have fewer collisions for five main reasons-pg.
Safe Driving Rules & Regulations.  25 MPH = School zones, business or residential districts  35 MPH = Suburban business and residential districts 
Unit 2: Signs, Signals, and Roadway Markings
November 15, 2005 Dr. Robert Bertini Dr. Sue Ahn Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System.
Ramp Metering – New experiences in NRW. 1.) Initial situation and first experiencies 2.) Ramp Metering in context of CENTRICO 3.) Actual problems and.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Limited Access Highways Driver Risk Prevention Curriculum State of New Hampshire Departments of Education and Safety Division of Program Support State.
Ch 11 Driving on Expressways Characteristics of Expressway Driving.
How would a truck get through? Any suggestions?. No parking allows access.
Brian Kary Minnesota Department of Transportation.
Section 4 (Day 3) Information Processing: Complex Risk Environments.
Road Markings Chapter 4. Roadway markings What do the LINES ON THE ROAD WAY indicate? Tell you which direction traffic is flowing.
Virginia Department of Education
Expressway Driving Legacy High School Drivers Education.
Information Processing: Complex Risk Environments Topic 1 -- Characteristics of Expressways Topic 2 (Lesson 2) -- Entering, Changing Lanes, and Exiting.
(is it necessary?) By: Tim Torrini per. two Ramp meters are the “stop and go signals located at the entrance ramps of freeways to regulate the amount.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
Virginia Department of Education
School Zone, Business or Residential Districts 25mph Non- posted rural roadways 50 mph Interstate highways 65 mph.
Traffic Lights Green Light- GO – You can proceed only if the intersection is clear. When approaching a green light, check traffic to the left, right, and.
Noah likes ramp meters And you should too Introducing Ramp Meters Ramp metering - the process of facilitating traffic flow on freeways by regulating.
Traffic Signals NV Driver Education Curriculum Unit 2: Signs, Signals, and Roadway Markings Presentation 2 of 3.
Brian Kary Minnesota Department of Transportation.
2.2- Traffic Signals. Traffic Lights Green Light- GO – You can proceed only if the intersection is clear. When approaching a green light, check traffic.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
 Every sign’s shape and color have special meaning  Regulatory Signs: Signs that set limits, or give commands.  Example: stop sign, Yield, One Way,
 Signs that set limits or give commands are regulatory signs. Regulatory sings control traffic.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
When Being Passed Monitor passing vehicle’s position Move to lane position 3 to increase space cushion Do not increase speed—decelerate if necessary Once.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
Intelligent Transport System (ITS) - A way forward? Gopinath Menon, Singapore 2016.
Ch. 7 Intersections.
Intelligent Transportation System
Bicycle Lanes for the City of Boston
(Expressway Traffic Management System)
EXPRESSWAY.
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
MODULE 2: TSMO Strategies
lesson 2.3 ROADWAY MARKINGS
lesson 2.2 TRAFFIC SIGNALS
MODULE 2: TSMO Strategies
Presentation transcript:

Company LOGO Ramp Meters

Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic signs, cameras, website, and 511 system “Traffic lights” on interstate entrance ramps designed to control traffic flow onto the interstate Proven to relieve traffic congestion in over 20 U.S. cities for over 20 years

Company LOGO PPI Project Delivery Why Ramp Meters?

Company LOGO PPI Project Delivery Why Ramp Meters?

Company LOGO PPI Project Delivery Why Ramp Meters? Without metering, groups of closely-spaced vehicles (sometimes at a time) all enter the Interstate together. At the merge point, they force their way into travel lanes, causing congestion- especially in the right lanes. In already heavy traffic, there is a total breakdown of free-flow near the on-ramps. This has a ripple effect for many miles. Even with no incidents, heavy on-ramp traffic causes congestion that builds and lasts through the rush-hour.

Company LOGO PPI Project Delivery How Do Ramp Meters Work? Similar to traffic signals with red and green lights Most effective when turned on prior to the onset of rush-hour Cycle from red to green every 3-5 seconds, allowing one vehicle at a time to merge onto the freeway. Yellow is not used, except on the very first cycle

Company LOGO PPI Project Delivery Benefits of Ramp Meters Reduced congestion on the Interstate Faster overall travel times Reduced merging accidents Reduced fuel consumption Reduced vehicle emissions

Company LOGO PPI Project Delivery 4 on I-75 NB between Midtown and W Paces Ferry (1996) 4 on the Downtown Connector SB (2005) 130+ turned on during last 9 months About 30 more meters will be phased in within the next 6 months, concluding the program Current Ramp Meter Locations

Company LOGO Two-lane Ramp Meter Design On two-lane ramps, the meter operates in a ‘left- lane’, ‘right-lane’, ‘left lane’ manner. PREPARE TO STOP

Company LOGO PPI Project Delivery What if...? If too many cars start to back up on the ramp, automated sensors detect this and adjust the cycle to allow vehicles to move through faster. If cameras show ramp traffic impeding surface street flow, the meters can be turned off completely. There will be a short learning curve period in the first few days for each corridor as the public adapts and GDOT makes necessary adjustments. There is no “magic bullet” solution to eliminate congestion. Ramp meters are just one of several tools that can help fight it.

Company LOGO Fears / Actual Outcome  “The public won’t understand what to do at ramp meters”  Fairly intensive PR campaign in advance of turn-on  Motorists understand concept of red/stop; green/go  “There will be lots of accidents on the ramp”  Did not occur  “Prepare to stop” signs warn approaching traffic

Company LOGO Fears / Actual Outcome  “Ramp meters won’t help”  Meters have “de-congested” several perennially congested segments of freeway  Duration of congestion is reduced  “They’ll just shift the problem from the freeway to the surface streets”  Most of the storage of vehicles occurs on the ramps, not the surface streets  In cases where traffic spilled onto surface streets, special “flush” patterns were developed to temporarily turn meters off

Company LOGO Results Summary  Travel Time Reductions ranged from:  50 to 358 seconds  7.9 – 34.8 %  # of stop reductions ranged from:  0.7 to 5.3 (one corridor had a 0.7 increase)  Total Delay Reductions ranged from:  13.7 to 276 seconds  11.4 to 81.8 %

Company LOGO Results Summary, cont.  Emissions data also collected  Hydrocarbon (g) reductions ranged from:  4.6 to 31.4 %  Oxides of Nitrogen (g) reductions ranged from:  4.8 to 38 %  One corridor increased 5.8%  Carbon Monixide (g) reductions ranged from:  0.8 to 14.9 %  Two corridors had increases (0.8% and 13.3%)

Company LOGO Duration of congestion  NaviGAtor detection data studied for 3 weeks before and after ramp meters

Company LOGO Duration of congestion Figure 19. Duration of Congestion: Wednesday (PM Peak – I-285 Westbound)

Company LOGO Duration of congestion Figure 6. Duration of Congestion: Friday (AM Peak – I-285 Eastbound)

Company LOGO