CEA DSM Irfu Spiral2 Injector diagnostics acquisition based on new hardware Françoise Gougnaud CEA Saclay IRFU - Françoise Gougnaud– Spiral2 Injector Diagnostics.

Slides:



Advertisements
Similar presentations
Dicembre 2009SPES Control System Group Acquisition using VME boards Conforto Nicola.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Eric Lécorché/ Epics meeting 21/10/ Setting the Spiral2 control system for the on-going commissioning.
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Oscilloscope Watch Teardown. Agenda History and General overview Hardware design: – Block diagram and general overview – Choice of the microcontroller.
MEG Experiments Stimulation and Recording Setup Educational Seminar Institute for Biomagnetism and Biosignalanalysis February 8th, 2005.
QuadEM: EPICS Software for Fast Electrometers for Beam Position Monitors Mark Rivers GeoSoilEnviroCARS, Advanced Photon Source University of Chicago.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
A Brief Overview of LabVIEW Data Acquisition (DAQ)
Timers and Interrupts Shivendu Bhushan Summer Camp ‘13.
Report from the Spiral2 control system development
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
The TIMING System … …as used in the PS accelerators.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
APS BPM and power supply applications on micro-IOCs W. Eric Norum
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
EPICS Developments at the Australian Synchrotron DSP EPICS driver for the General Standards 16AIO analog card EPICS driver for the Galil range of motor.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
IRFU COLLABORATION IN SPIRAL2 & LIPAC CONTROL SYSTEMS Françoise Gougnaud On behalf of D. Bogard, J-F. Denis, A. Gomes, J-F. Gournay (now retired), Y. Lussignol.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Rl/ic/ukdmc cPCI - DAQ for NaI Crystals. rl/ic/ukdmc DC MS/s (*) Sampling Rate simultan. on all channels 150 MHz (*) Bandwidth 128 kpoints per.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Fast Fault Finder A Machine Protection Component.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Digital Electronics and Computer Interfacing Tim Mewes 5. Computer Interfacing – DAQ cards.
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
1ICALEPCS, October 15-19, 2007, Knoxville, Tennessee Association Euratom-Cea Ph. Moreau Association EURATOM-CEA Département de Recherches sur la Fusion.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
CEA DSM Irfu July 19th 2013-Françoise Gougnaud - Status of EPICS control for ECCTD 1 Françoise Gougnaud Irfu/SIS.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
Software development Control system of the new IGBT EE switch.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Lécorché Eric, Epics meeting, 15/10/ Setting up the building blocks for the future Spiral2 control system.
ADC 1 Analog to Digital Converter. ADC 2 ADC Features n General Features -Supports 8 or 10-bit resolution Modes, -Track period fully programmable up to.
EE 345S Real-Time Digital Signal Processing Lab Fall 2008 Lab #3 Generating a Sine Wave Using the Hardware & Software Tools for the TI TMS320C6713 DSP.
Renesas Electronics Europe GmbH A © 2010 Renesas Electronics Corporation. All rights reserved. RL78 AD converter.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
Stephanie Allison LCLS IOC Meeting Jul 18, 2008, Jan 21, 2011 Beam Synchronous Acquisition for IOC Engineers Definition/Requirements.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Report on the progress of the 40MHz SEU Test System based on DE2 Board 20 Jan in CPPM Zhao Lei.
Beam Wire Scanner (BWS) serial link requirements and architecture
RF acceleration and transverse damper systems
AHCAL Beam Interface (BIF)
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
SLS Timing Master Timo Korhonen, PSI.
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Status of Fast Controller EPICS Supports for ITER Project
asyn Driver Tutorial Measurement Computing 1608GX-2A0
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
Readout Systems Update
Red Pitaya with EPICS Andraz Pozar EPICS Collaboration Meeting
Presentation transcript:

CEA DSM Irfu Spiral2 Injector diagnostics acquisition based on new hardware Françoise Gougnaud CEA Saclay IRFU - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu Synchronised Intensity measurement Pulsed beam mandatory during the tuning phases Beam intensity of the Injector measurements in 2 ways: –beam destructive measurement with 4 Faraday cups in the LEBT –non-destructive measurements: 1 ACCT/DCCT in LEBT & 1 DCCT in MEBT Horizontal & vertical transverse emittances measured by Allison scanner emittancemeters Objectives of command control Average peak value Beam pulse display Synchronisation of readings between different equipment - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu Main requirements for the electronic boards COTS VME64 (not VME64X) boards Sampling frequency from 200 K Samples/s up to 1 M Samples/s –Requirements very different depending on diagnostics users –Foreseen Bandwidth for the signals from sources : 50 KHz ADCs 14 bits resolution External trigger to synchronize the acquisitions - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu The solution selected (1) New boards from the NEXEYA/ADAS company: –The set ICV108 & ICV178 ICV108 –Controller board –External trigger –RAM buffer of 4 Mbytes, DMA transfer –Numerous modes of running (Flip/Flop, single event, continuous.) –Can synchronise several ICV178 boards - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu The solution selected (2) ICV178 –8 analog inputs –16 bits resolution  /  ADCs –Sampling frequency: 50 KSamples/s up to 1.2 Msamples/s Communication 178 & 108 via the VME I/O lines P2 –For data and timestamps Adas company located close to Saclay Drawback: no software driver - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu ICV108 functionalities used 4 Mbytes RAM dedicated to measurements of acquisition –Flip/Flop and single event mode –IT sent by ICV108 on VMEbus at the end of each acquisition Pattern table of the ICV108 board –Contains the basic pattern to save the data in the RAM –The same pattern repeated throughout the acquisition –The pattern is divided into 10 subpatterns (configurable) –Each subpattern is composed of the number of channels to acquire –The header of each pattern includes a timestamp - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu Acquired data in memory - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of timestamps Channel 0 Channel 1 Channel 2 Channel 3

CEA DSM Irfu Epics device driver software - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of Acq on VME boards ICV178:digitalisation Data transfer via P2 ICV108 IT VmeDmaCPU Dma transfer from RAM to CPU local memory Icv108IntService FillUpWf Reads data & process waveform records Initialisations of the records SIGNAL TRIGGER Icv108 configuration EPICS IOC VxWorks 6.7

CEA DSM Irfu Enhancements of the driver in progress Use Ai device again for average peak value Modify the pattern table live, without rebooting VME Create a waveform in the driver dedicated to abscissa axis –Deducted from timestamps Enhancement sometime in the future –Flip/Flop but continuous mode Many thanks to my colleague Jean-François Denis (IRFU) –who works on the enhancements of the driver –who participated to the integration of this acquisition on both beamlines, at Grenoble and at Saclay. - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu Pulsed beam on the line at Grenoble - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu Pulsed beam on the Deuton source at Saclay - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of

CEA DSM Irfu Necessary in the understanding of the ICV108 board to develop our software ADAS made several specific modifications for our applications –To permit longer delays in the measurement in comparison with the start of the pulse –Modifications of control registers « like the corner shop » Efficient support from ADAS - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of Acq=20ms IT+DMA=440µs

CEA DSM Irfu Next applications based on 108 & 178 On the line at Saclay will be installed:during this summer –An ACCT (1 MSamples/s) & a DCCT –Horizontal and vertical emittancemeters On the line at Grenoble the eight channels will be used on ICV178, not only for diagnostics but also for Hall probe and source parameters Thank you for your attention. - Françoise Gougnaud– Spiral2 Injector Diagnostics acquisition based on new hardware Friday, June the 4th of