RPC Digitization Marcello Maggi/INFN-Bari Raffaello Trentadue/INFN and Dip. Bari.

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Giuseppe Roselli (CMS-RPC) Università degli Studi di Bari – INFN RPC Efficiency with Track Reconstruction Giuseppe Roselli.
27 Oct. 2000TGC Simulation video meeting1 Trigger Simulation Hisaya Kurashige KOBE Univ.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
Paolo Meridiani - INFN Roma11 ECAL perfomance: lessons learned and future plans P. Meridiani & C. Seez Physics Days 17/01/2007.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
CommonDet For Calorimetry New Features Grouping DAQ readouts done for HCAL DetLayers for track navigation not done, should be easy.needed? ECAL implementation.
RPC timing in simulation Current Situation MC Geant4 RPCSensitiveDetector.cxx Or RPCSensitiveDetectorCosmics.cxx RPC_Digitization RPC_digit_To_RDO RPC_RDO_To_Prep:
Overview We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger trackfinder data through an XDAQ Event Builder.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
Paolo Meridiani – INFN Roma 1 1 Ecal Trigger Software in CMSSW P. Meridiani Ecal Trigger Workshop 28/04/2006.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
SSD offline status Offline week CERN, 7 July 2008 Enrico Fragiacomo on behalf of ALICE SSD.
Commissioning data are taken with individual chambers TP data autotriggered Cosmic rays data  ( different configuration) Different cosmic track angle.
An FPGA implementation of real-time QRS detection H.K.Chatterjee Dept. of ECE Camellia School of Engineering & Technology Kolkata India R.Gupta, J.N.Bera,
Mokka and integration of the geometry AIDA kick-off meeting WP2 session: Common software tools 17 February 2011 – CERN Paulo Mora de Freitas and Gabriel.
ALICE Offline week, CERN 21 February 2005 I. Hrivnacova 1 New geometry framework in MUON I.Hrivnacova IPN, Orsay ALICE Offline week, CERN 21 February 2005.
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
TriDAS Equipment database Equipment database is partially built (Oracle). Currently consists of 2 separate databases.  DB I – database containing.
Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.
CHEP06, Mumbai-India, Feb 2006V. Daniel Elvira 1 The CMS Simulation Validation Suite V. Daniel Elvira (Fermilab) for the CMS Collaboration.
Magnetic Field Issues for Simulation and Reconstruction N. Amapane, N. Neumeister Workshop on LHC Physics with High-p T Muons in CMS Bologna, April 9-12,
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Cosmic Rays for ATLAS Commissioning Commissioning Meeting ATLAS Physics Workshop Athens May 2003 Halo+Cosmics group: M.Boonekamp, F.Gianotti, R.McPherson,
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
CMS WEEK – MARCH06 REVIEW OF MB4 COMMISSIONING DATA Giorgia Mila
Status of RPC trigger analysis and Muon Trigger efficiencies for W-> μν study By Archana Sharma, Suman B. Beri Panjab University Chandigarh India-CMS Meeting.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
TOF code status report : raw data data visualization geometry A. De Caro for the TOF group.
GAUDI Muon Software  Algorithms : Muon Digitization MuonL0Trigger MuonIdentification  Detector Description Database  Transient Detector Store  Detector.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Trigger LVL1/LVL2 Makers. CERN, december 2001 Gabriella Cataldi-INFN Lecce Trigger (Level 2) Makers: MooiPatTrackSegmentMaker MooiPatTrackMaker MooTrigClusters.
Javier Castillo 1 Muon Embedding Status & Open Issues PWG3 - CERN - 15/02/2011.
Object Oriented reconstruction of the CMS muon chambers CHEP February, Padova Annalina Vitelli - INFN Torino.
RPC Simulation software Raffaello Trentadue. RPC Digi producer RPC Digitizer RPC Synchronizer RPC Simulation model Average model Parametrized model Parametrized.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
LAV Simulation Emanuele Leonardi INFN Roma Photon Veto meeting 08/02/2011.
TeV Muon Reconstruction Vladimir Palichik JINR, Dubna NEC’2007 Varna, September 10-17, 2007.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
1 Plans for the Muon Trigger CSC Note. 2 Muon Trigger CSC Studies General performance studies and trigger rate evalution for the full slice Evaluation.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
Current Status of the Tracking Trigger Software Andrew W. Rose.
TOTEM Collaboration Meeting 13/12/06 Fabrizio Ferro-INFN-Ge 1 T1 SW status.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
POOL Based CMS Framework Bill Tanenbaum US-CMS/Fermilab 04/June/2003.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Comparison of algorithms for hit reconstruction in the DTs: Test of calibration procedures for t trig and drift velocity on Test Beam data Test of calibration.
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
Pixel DQM Status & Plans
Status of RPC software in CMSSW
DQM for the RPC subdetector
MUC simulation and reconstruction
Practice Geometry Practice
Characterization of Wired-OR prototype board
For More Details:
Presentation transcript:

RPC Digitization Marcello Maggi/INFN-Bari Raffaello Trentadue/INFN and Dip. Bari

RPC Digis status (ORCA…) Recently ORCA digitizer was improved to describe the average behavior of the RPC in comparison with real performance as extracted in the cosmic stands (never committed, but used internally for the RPC group) RPC L1 Trigger emulation performance was then studied in detailed

New RPC Digitizer design MRpcEmulatorBasicAverageDetailed Digi() MRpcDigitizer Digi() Geometry Service MRpcGeoInterf Number of strip() StripLength() DeadArea() Performance Service Basic: orca like Average: default Detailed: chamber by chamber simul

Work in progress (CMSSW…) Lower Level DetUnit changed. Geometry xml files just released by Pawel, and beeing reviewed by Pedro. RPC Geometry classes and DetUnitId start being committed New Digitizer depends on this and it has been redesigned. Skeleton exists but has to be committed

Plans and Time Scale next week: Finalize Geometry Commit RPCDigitizer skeleton Near future: Implement the digitization Port the auxilary classes from ORCA