Historical Warranty Repair Cost: A Measure Of Long-Term Roof System Performance James L. Hoff Firestone Building Products.

Slides:



Advertisements
Similar presentations
Wetsuit Roofing and Waterproofing
Advertisements

ROOF SLOPES.
Unit III Module 6 - Developing Age Exploration Tasks
Building Owners Roofing System Inspection and Maintenance.
Foundations of Real Estate Management
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Foundations of Real Estate Management BOMA International Module 4: Building Operations II Roofing Systems ®
Liquid Rubber is the world’s only EPDM rubber in liquid form. Liquid Rubber provides a seamless, single coat roof coating that can be applied up to 6.
Module INS-01Module TAP01 COMMERCIAL ROOFING Tapered Insulation Systems.
Firestone Building Products EPDM Training. Membrane Attachment.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Design Aspects of the Arboretum Green Roof Green Roof Symposium.
INSTALLATION PRESENTATION. April 2002: Barnabus Energy (OTC BB: BBSE) formed as oil & gas development group. December 2005: Signed agreements to acquire.
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
Economic Analysis of Future Offshore Oil & Gas Development: Beaufort Sea, Chukchi Sea, and North Aleutian Basin A study to describe and quantify potential.
The Greening of the Rooftop Module 7 Green Roofing: High Performance Roofs.
Reviewing & Analyzing Schedule
Backcasting Time Series During 2008 SNA / ANZSIC 06 Implementation Michael Davies, Division Head, Macroeconomic Statistics Division, Australian Bureau.
The Greening of the Rooftop Module 5 Why Roof Green?
Department of Facilities Management Maintenance & Operations.
Equivalent Uniform Annual Cost: A New Approach to Roof Life Cycle Analysis James L. Hoff, DBA Firestone Building Products Canadian Roofing Symposium Calgary,
Introduction To Single-Ply. 2 Objectives Objectives When you complete this unit, you will be able to:  Explain what single-ply roofing is.  Describe.
Dr. James L. Hoff, DBA INTRODUCTION TO LOW- SLOPE ROOFING.
2 V2T Roof System. Let the wind work for your roof. Generic Presentation. Updated 01/08/2015 The V2T Roof System uses the power of the wind to hold the.
Squares, Area, and Perimeter Test #7. Question 1 Area = 25cm 2 What is the perimeter?
Firestone Building Products. is: UltraPly™ TPO membrane in the field of the roof. RubberGard EcoWhite™ EPDM, or RubberGard™ EPDM (black), for wall flashing.
SUSTAINABLE BUILDINGS: ADDRESSING LONG-TERM BUILDING ENVELOPE DURABILITY Dr. James L. Hoff Center for Environmental Innovation in Roofing / TEGNOS Research,
Commissioning Market Research November 19, Market Research Five Research Questions 1.What are the odds that any new, un-commissioned building will.
Getting a CLUE! Understanding CLUE Reports and CLUE Scores.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Products & Accessories Details System Highlights Hands On
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
A History of Risk and Return
BUNCOMBE COUNTY SCHOOLS ROOFING STATUS REPORT Presented to the Board of Education October 4, 2007.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Life Cycle Assessment and the Building Envelope: Balancing Durability & Environmental Impact Dr. James L. Hoff Center for Environmental Innovation in.
The Greening of the Rooftop Why Roof Green? Dr. James L. Hoff Research Director Center for Environmental Innovation in Roofing Washington, DC.
New Heat Mitigation and Water Retention Concepts to Expand Green Roofing Demand Greening Rooftops for Sustainable Communities June 4, 2009 Atlanta, GA.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
LiquiGard ™ Firestone Building Products. LiquiGard ™ About Firestone LiquiGard™ is a tough, liquid applied, two-part polyurethane adhesive. It forms a.
TPO Membrane attachment and Base Tie-In Adhered System System Design Adapts Easily To Unusual Roof Profiles or Slopes System Design Is Easy To "Beef.
We’re Fixing Your Leaks Across the South East!!
The Greening of the Rooftop Module 9 Other Green Roofing Options.
The Greening of the Rooftop Module 5 Why Roof Green?
Firestone Building Products
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Edward Colligon Doug Watson Brett Reisker Opeyemi Ositelu Hong Jie Chen.
Scheduling CTC-370. Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must.
Firestone Building Products EPDM Training – Termination and Miscellaneous.
(Ethylene Tetrafluoroethylene)
TYPES OF WATERPROOFING MEMBRANES
Steve Handschuh Automotive Aftermarket Suppliers Association National Automotive Service Task Force General Meeting Las Vegas Nevada November 03, 2009.
Proactive Roof Asset Managemet Vince Patterson Operations Manager – Roof Maintenance & Leak Repair Department Chamberlin Roofing & Waterproofing.
Cold Fluid Applied Reinforced Roofing. Agilast Cool Roof Systems Highly durable Water based Waterproof Reinforced with tough polyester fabrics/chopped.
Garland’s White-Knight® Plus/ White-Stallion® Plus System
Overview WMU – Case Study Software Demonstration Best Practices
Firestone Metal Warranties
Liquid Flashing: Garland’s Tuff-Flash™ System
© 2016 Global Market Insights. All Rights Reserved Asia Pacific Waterproofing Membrane Market To Surpass 800 Million Sq. Mtrs. By 2024.
StressPly® SA FR Mineral System
Roof Repair Specialists in Oklahoma City
Area Unit Conversion Worksheet
Find the surface area of a sphere
This is 1 minecraft block it is 1 unit long and 1 unit wide

Counting to 100 Counting by ones
This is 1 minecraft block it is 1 unit long and 1 unit wide
What is Social Studies?.
EXHIBIT 1 Hypothetical and Actual Business Cycles
Presentation transcript:

Historical Warranty Repair Cost: A Measure Of Long-Term Roof System Performance James L. Hoff Firestone Building Products

Roof System Performance: Where To Measure When To Measure How To Measure What To Measure

Roof System Performance: Where To Measure Laboratory Field

Roof System Performance: When To Measure Short-Term versus Long-Term One-Time versus Periodic

Roof System Performance: How To Measure Anecdotal Approach Statistical Approach

Roof System Performance: What To Measure Frequency Of Incident Economic Impact

Roof System Performance: The Ideal Measure Based On Field Observation Long-Term Approach Statistically Significant Based On Economics

In-Service Performance Information. Long-Term Focus Large, Statistically Significant Population Cost-Based Measurement Roof System Performance: The Warranty Data Base As A Useful Tool

EPDM, APP & SBS Roofing Systems Installed From 1982 To Present Over 20,000 Roofs / 2 Billion Square Feet Roof System Performance: The Warranty Data Base Used In This Study:

Detailed System Information Detailed Service History Roof System Performance: The Warranty Data Base Used In This Study:

Frequency Of Roof Repair Service Relative Repair Cost Over Time Relative Repair Cost Of Different Systems & Components. Roof System Performance: The Warranty Data Base Can Be Used To Measure:

Historical Repair Cost: Cost / Square Meter / Service Year Actual Spending Indexed To A Base Year Actual Spending Divided By Total Surface Area Actual Spending During A Specified Service Year

Repair Costs By Service Year: 1984 EPDM Roofs ( Indexed Cost Per Square Meter ) Year Maintenance Performed Year Service Performed

Year Maintenance Performed Year Service Performed Repair Costs By Service Year: 1985 EPDM Roofs ( Indexed Cost Per Square Meter )

Year Service Performed Repair Costs By Service Year: 1986 EPDM Roofs ( Indexed Cost Per Square Meter )

ActualProjected Year Service Performed Repair Costs By Service Year: 1987 EPDM Roofs ( Indexed Cost Per Square Meter )

ActualProjected Year Service Performed Repair Costs By Service Year: 1988 EPDM Roofs ( Indexed Cost Per Square Meter )

ActualProjected Year Service Performed Repair Costs By Service Year: 1989 EPDM Roofs ( Indexed Cost Per Square Meter )

ActualProjected Year Service Performed Repair Costs By Service Year: 1990 EPDM Roofs ( Indexed Cost Per Square Meter )

ActualProjected Year Service Performed Repair Costs By Service Year: 1991 EPDM Roofs ( Indexed Cost Per Square Meter )

Repair Costs By Service Year: EPDM Roofs ( Indexed Cost Per Square Meter ) Roofs1985 Roofs 1986 Roofs1987 Roofs 1988 Roofs 1989 Roofs 1990 Roofs 1991 Roofs Year Of Service

Year Roof Installed EPDM Roof Repair Costs: First Five Years Of Service ( Indexed Cost Per Square Meter ) 1987 Roofs = 1.00

EPDM Actual / Projected Repair Costs: First Ten Years Of Service ( Indexed Cost Per Square Meter ) Actual Year Roof Warranted Roofs = 1.00 Projected

EPDM Repair Costs By System Type: First Five Years Of Service ( Indexed Cost Per Square Meter ) Year Roof Installed Ballasted Adhered Mech. Attached Average For All Systems = 1.00

New / Re-Roof / Re-Cover: First Five Years Of Service ( Indexed Cost Per Square Meter ) Year Roof Warranted New Construction Re-Roof Recover ( Tear-Off ) 1987 Average For All Roofs =

EPDM Repair Costs By Component: First Five Years Of Service ( Indexed Cost Per Square Meter ) Year Roof Warranted Seams Perimeters Other Total For All Components =

EPDM Roof System Performance Improvements To Component Technology: Pres. Butyl-Based Splice Adhesive Uncured EPDM Flashings Tape Laminates Improved Perimeter Details Seam Tape & High-Solids Primer

1993 % Roofs With Call-Backs In First Two Years: % Lower 46% Lower Year Roof Warranted Adhesive Seams Tape Seams

EPDM Repair Costs By Contractor Status: First Five Years Of Service ( Indexed Cost Per Square Meter ) 1987 Average For All Contractors = 1.00

Modified Bitumen Repair Costs

EPDM / Modified Bitumen Repair Costs: First Five Years Of Service ( Indexed Cost Per Square Meter ) Year Roof Warranted

APP / SBS Repair Costs First Five Years Of Service ( Indexed Cost Per Square Meter ) Year Roof Warranted

Roof System Performance: Modified Bitumen Repair Costs Systems In Data Base Are Predominantly 1-Ply Systems. Repair Costs Are Predominantly Related To Seams.