DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Walls crates cables gas chambers electronics CERN adb.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Start Counter Construction Update Eric Pooser 08/21/2014.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Technical Support Activities in PH-ADO-PO
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting December 2008 Monastir, Tunisia.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SBS Magnet and Infrastructure Status Robin Wines July 2015.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
CLAS12 Drift Chamber Prototyping
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
CDMS II Shielding To Installation To Construction From Design.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
ELENA installation progress F. Butin / ELENA collaboration.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
University of Wisconsin
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Hall A Compton Electron detector overview
CLAS12 First Experiment Workshop Report
LLRF and Beam-based Longitudinal Feedback Readiness
Pierluigi Paolucci - I.N.F.N. Naples
UK CMS Oversight Committee Mtg
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Teleconference ACS – FREIA 19th June 2017
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
2015 January February March April May June July August September
Presentation transcript:

DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand

Mechanical Design Support Stand and Cart (Nov 2009), – Rail/Bearing modification at JLab – Assembly Jan 2010? – Cable tray and legs?? Calorimeter Frame – Fabricated at LPC PMT / Crystal mounting – pieces at LPC – Soldering required 100 pieces. Black Box (January 2010) CH shielding LED frame Blue Light frame Cable Tray specification

Mechanical Assembly Dec 2009 – Feb 2010 JLab Dec 2009 – Bearing/Rail modification Jan 2010, – Fabricate Stand, Cart – Purchase clean room supplies – Purchase Tedlar, Tyvek, Optical Grease – Purchase Oscilloscope? HV? Feb 2010, – Install DVCS stand in Test Lab Support piece? Install Cart on stand empty patch panel – Assemble and wrap crystals Clean room or Test Lab tent. – Mount Calorimeter frame and Cable Tray LPC Dec 2009 – IGUS cable Tray specs – Prototype crystal solder – One ARS card to JLab Jan 2010 – Mechanical supports for Translation cards – Solder 100 crystal assemblies 50+ hours? – Ship Calo support to JLab – Ship PMs & bases to JLab keep a dozen at LPC? – Purchase Cable Tray pieces – Study of Logic Unit, Clock-FanOut Feb 2010 – LED Controller design – Ship first translation cards – Mission Guy SAVINEL?

Mechanical Assembly March 2010 – May 2010 JLab March 2010 – Assemble Crystals in Calo – Cosmic Ray Paddles – Test HV and Signal Cables – HV, Signal cables in cable tray to patch panel – (PREX starts 11 March 09) April 2010 – Survey, Fiducialization of Calo – fabricate & install Low Voltage, ADC cables – Install DC ADC, HV, Low Voltage supply – Cabling Trigger-ARS – Cabling Patch Panel to DAQ – DAQ – EPICS – LED Matrix May 2010 – Debug DAQ – Cosmic Ray and LED Data – Initial Calibrations – Vacuum Chamber, Beam Pipe (JLab) 25 May 2010 – End of PRex LPC March 2010 – Envois pour JLab PM Translation Cards Blue LED Cards Logic Card Full Trigger Full ARS – Mission M. Brossard for Compton? April 2010 – Missions Christian FAYARD, Magali MAGNE, (Michel BROSSARD?, Eric SAHUC?). May 2010 – Spare Trigger mother-card – Spare VME Control Card

Mechanical Assembly June 2010 – August 2010 JLab June 2010 – Makis Petratos experiment? – Install Vacuum Chamber – Transfer to Hall A Disassemble Calorimeter Survey, Alignment, in situ. Installation of ARS, Trigger in HRS Cabling from Patch Panel to HRS – HV, ADC install on floor beyond HRS-right. Recable – J. Roche, mi-juin July 2010 – Cosmic DAQ – LED DAQ – Timing Calo – HRS with 3 rd Cosmic Paddle – Full DAQ : validation forced to true. Random HRS-cosmics Calorimeter-cosmic Aug 2010 – Continue LPC June-July 2010 – Logic Card July 2010 – Mission M. Magne (3 semaines) August 2010

Mechanical Assembly September - December 2010 JLab September 2010 – Commissioning with Beam – Compton also? 14 Sep – 23 Nov. – Data Taking 24 – 28 November – Thanksgiving Holiday 29 Nov - 07 Dec. – Data Taking 08 – 22 December – De-install, storage for 12 GeV June 2013 – DVCS with first 11 GeV beam? LPC Septembre 2010 – Missions Magali MAGNE, (Michel BROSSARD?).

Technical Support Request to JLab Dec 2009 – Modify bearing/rail design on DVCS stand & cart Jan 2010 – Fabricate DVCS stand & cart – procure 1 “electronics rack” for patch panel – procure electronics rack for trigger/ARS crates – procure storage shelving for 230 crystal assemblies 1.5 kg/assembly, 3x3x40 cm 3 /assembly, 340 kg net – fabricate shims for PbF2 crystals Feb 2010 (net 1-2 man-week of JLab labor required) – Install DVCS stand, cart, patch panel rack in Test Lab. – Install (2) electronics racks – Transfer all cables (not old black box assembly) from Warwick – Ethernet Connection in Test-Lab – Test and repair of signal cables, HV cables (1 week) March 2010 – HV Chassis (220 channels needed for exp) – VME crate and slow VME ADC – Repair of Vacuum chamber and beam line – EPICS programming for HV, slow ADC – Beamtime for commissioning Compton eDet – Install Cables & connectors (1 week) April 2010 – Survey, Fiducialization – CODA support May 2010 June 2010 – Install Vacuum Chamber ( 1 week ) – Install DVCS Stand in Hall (1 week) – Install HV / Slow ADC in Hall – EPICS support – Install cables from Calo to HRS (1 week) – Survey and Alignment of Calo and Stand (1 week) July 2010 – Install ARS/Trigger in HRS-left hut (1 week) – CODA support – PbGlass Calo in HRS-Left – Cosmic Scintillator on Calo & HRS August 2010 – EPICS – CODA

Personnel Schedule at JLab Very provisional JanFebMarAprMayJunJulAugSepOctNovDec Hyde Munoz Camsonne Roche Mazouz Albataineh Fuchey Itard Asenath Gasser1111 ?