LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.

Slides:



Advertisements
Similar presentations
TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Fire Detection and Fire Fighting in ALICE Smoke detection in UX cavern and Counting Rooms in PX Alarms sent to.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
BUILDING SECURITY ALARM SYSTEM. BUILDING SECURITY ALARM SYSTEM Any electrical or mechanical device which is designed or used for the detection of an unauthorized.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
DSS Advisory Board Christoph Schäfer Rack Safety System.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
André Augustinus 16 September 2002 Safety issues.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
Operation & Maintenance in ST-MA presented by Rui Nunes.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
Associated detection/extinction systems D. Swoboda.
All information relating to safety training and awareness can be found at this address:
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
EN-CV interventions during YETS
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
INFRASTRUCTURE CHANGES AND UPGRADES Presented by: Fernando Baltasar dos Santos Pedrosa in the name of the four LHC experiments.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
External Data and DIP Oliver Holme 18 th January 2008.
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Fire Detection Equipment and Systems in Dubai
Safety Systems for ALICE
News from Integration WG
Helium spill in LHC tunnel
M.Tavlet, H.Taureg - ALICE
HL Consolidation Day Analysis of needs from BE-ICS
Where to buy fire alarm & security systems in Canada
COOLING & VENTILATION INFRASTRUCTURE
Presentation transcript:

LHC Fire & Gas Detection Rui Nunes ST/AA/AS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection –Oxygen Deficiency Detection –Evacuation Systems In accordance to User Requirements

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 User Requirements TIS –Requests Detection for the PROTECTION OF PEOPLE Owners of Buildings –Request Detection for the PROTECTION OF EQUIPMENT

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Surface Sites CERN Sites Divided into Safety Zones

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 PA1 ATLAS LHC Surface Sites Strategy CERN Sites Divided into Safety Zones 1 Fire Panel / Zone 1 Gas Panel / Zone

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Surface Sites

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 1 - ATLAS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 18

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 2 - ALICE

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Points 32 & 33

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 4

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 5 - CMS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 6

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 7

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Point 8 - LHCb

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 What happened to the old equipment? Removal/renewal of all detection equipment –Adapt to new use of installations –Reduce maintenance costs  Replace with less and better Remove obsolete/useless –Improve performance Reduce spurious alarms  –To achieve this, we need Input from users (TIS, ST, Experim, etc)

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Underground

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Experiments Experimental Apparatus –Need for specific devices Experimental Cavern –Need for generalized detection Service Caverns –Need for generalized detection –Need for specific devices (e.g. racks)

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Experiments - ATLAS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 ATLAS Experiment Detect Smoke, Flammable Gas and Oxygen Deficiency inside the Detector –FAGIA WG (Fire And Gas Inside Atlas) –Collaboration between ATLAS Safety (G. Benincasa, M. Hatch) ST/AA/AS (R. Nunes) EST/LEA (J. Nebout) TIS (C. Nuttall, J. Elorza)

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Experiments - ATLAS Preliminary Proposal from ATLAS –332 tubes –178 smoke detectors –122 gas detectors

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Experiments - ATLAS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 ATLAS Service Cavern Smoke Detection –Cavern Environment –Specific Racks Gas/O 2 Detection

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 CMS Experiment Specific Detection inside the Detector Generalised Detection for Caverns –Collaboration between CMS GLIMOS (R. Schmidt) CMS DCS (W. Funk) L3 GLIMOS (J. Pothier) ST/AA/AS (R. Nunes) TIS (F. Szoncso)

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Experiments - CMS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Experiments - CMS

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Machine Fire Detection –Agreed in specific locations UJ: 14,16,33,56 UA: 23,27,43,47,63,67,83,87 RR: 13,17,53,57,73,77 RE: all (12,18,22,28,32,38,42,48,52,58,62,68,72,78,82,88) –Differing opinions from TIS and LHC for tunnel Gas Detection –Awaiting decision for generalized O 2 deficiency detection from LHC

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Machine (1)

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 LHC Machine (2)

Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Contracts Fire Supply Contract B1133/ST –Surface Gas Supply Contract –Surface and underground Special Contracts for Experiment Specific needs