Page 1 ESA ODF Control Board #4 3.-5. Mar. 04 Columbus Flight ODF Status.

Slides:



Advertisements
Similar presentations
Jnan B2C Features Hotel Reservation - B2C Features  Hotel Search on country, city wise  Hotel sort options  Filter search option  Hotel rates  Hotel.
Advertisements

1 Module 9: Submit. Objectives 2 Welcome to the Cayuse424 Submit Training Module. In this module you will learn how to use Cayuse424 to:  Discern the.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne. – Times: –See noticeboard outside.
Strategic Information Initiatives Week 4 Project Planning Frank Coker, MBA, CMC President Information Systems Management, Inc. (a consulting firm – since.
PSU CS 106 Computing Fundamentals II Product Life Cycle & SW Product Life Cycle HM 9/3/2007.
Planning. SDLC Planning Analysis Design Implementation.
1Welcome TNKids Financials Authorizations TNKids Financial System Correcting Home Approval Period for Payment Computer-Based Training EXIT.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Double click on the Internet Explorer Icon on your Desktop. This should take you to the Polytechnic of Namibia Intranet Home site or Click on this link.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
UBSCO-PPMS Maintenance Training Manuals
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Available Tools for planning and Data Processing I. Musso.
Slide: 1EUM/PPS/08/VWG/ October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo.
D. McMahon Generation of Ground ODFs ESA ODF-CB 3-5 March 2004 Gerd Soellner (DLR/Col-CC) Co-author Nathalie Gérard.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
Systems Development Life Cycle
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Product Manager Clothing Individual Equipment Personnel Airdrop Systems Team PROGRAM STATUS UPDATE TO PIA February 2008 The Soldier: America’s Most Deployed.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Develop Project Charter
21C Customer Experience (CE) Programme Progress update and next steps - web call 14th March :00 to 13:00 Caroline Watson Head of 21C Customer Experience.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Programme Board – 100 Day Plan 10 th March 2011 working days left
Preliminary Design Review.  Completed practice launch  New motor selection  Corrected simulations  Improved payload construction  Increased.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 1 Briefing to Multilateral IDAGS TIM12 NASA/JSC, Aug Mikael.
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
3-5 March 2004 ESA ODFCB, 3-5 March 2004 ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 Simon Challis, MSM-EO.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
IBM Maintenance and Technical Support © Copyright IBM Corporation 2007Phil Giddings Feb-09 MAPS Tool ( Maintenance At Product Sale) Education Presentation.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Execute Tailored Procedures (XTP) Status POIWG – July 2015 Lamar Stacy.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
- 1 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS J.D. Schiemann / P. Boisvert ESA/ESTEC MSM-EPO MSFC.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
Directorate of Manned Spaceflight and Microgravity Paolo Ariaudo (ESA MSM-EPO) MSFC/ESA TIM#2, February 22-24, 2004 MSFC/ESA TIM#2 February 24-27,
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Systems Development Life Cycle
Figure 9.8 User Evaluation Form
Software Configuration Management
Global Inventory of Statistical Standards
POC Procedures Working Group (POC-pWG)
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Xoserve IX Refresh Customer Update 03/01/2019.
Editing board meeting Brussels
Issues for preparation and implementation of training sessions
Presentation transcript:

Page 1 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status

Page 2 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status  Preliminary Columbus ODF content for all Books/Files has been defined including procedures for NASA SODF maintained Books/Files: –EMERGENCY Book –WARNING Book –CAUTION Book –Flight 1E Assembly Book  Authoring of flight procedures is proceeding for all Books/files, i.e. DMS, COMMS, ECLSS, TCS, EPDS, MSM, IFM, GND, POC, including inputs for NASA/SODF maintained Books/Files.  Functional validation of COL ODF procedures will be performed on the SITE and partly on the ETM or by desktop review in case of similarity.  Validation of layout and correctness of IFM and MSM procedures will be performed via desktop review. The feasibility of IFM and MSM generic procedures was already verified in the frame of 1-g and 0-g test campaigns.  Validation of multielement procedures will be performed by NASA during joint tests and simulations in the frame of the SODF development cycle.

Page 3 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status ODF Component Flight System / Books Procedure Type COMMS Malfunction Corrective Reference DMS ECLSS EPDS GND IFM MSM POC TCS COL ODF Payloads SODF Generic Set / 1E 1E Flight- Specific Set EMERGENCY WARNING CAUTION Generic Set Malfunction A&C Reference Assembly US Systems A&CNominal Corrective

Page 4 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status

Page 5 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status  The set of procedures contained in the QR/FAR data package are the Columbus C/D Phase procedure delivery and are considered as the Initial Input Publication (L-18) of the 1E ODF cycle.  Subsequent development and maintenance will be performed by the Industrial Operations Team as defined in the ESA ODF Management Plan and controlled by the ESA ODF Control Board.  The development and validation of these procedures is on the critical path with respect to QR-II and training milestones, but not with respect to new Columbus launch date.  In order to meet these milestones priorities for procedure development have to be defined and the concept for Ground ODF procedures has to be determined and agreed.

Page 6 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status MAMJJASONDJF MAMJJASOND QR-II DP Delivery FAR-I DP Delivery PreliminaryBasic Final Content Def. ODF Authoring Update/CR L-18 L-12 L-6 L-3L-1 CoFRInitial Inputs ODF Delivery for COL Launch 3/06 JFM COL Launch (NET) Launch Prep ODF Validation Need Dates P-JMST#2EAC/Training

Page 7 ESA ODF Control Board # Mar. 04 PCS Development Status  Columbus QPM 4. Dez –Agenda Point: PCS Display (US side) Development –Presentation by EADS-ST (G.Hajen), see Annex 8. It was once agreed that NASA is providing ESA/EADS-ST with the documentation. For further progress on this topic ESA will get in contact with the responsible of NASA as the previously agreed steps were not fulfilled by NASA (January 03). –Action ESA AI-APM-Mgmt-4760: To clarify the development progress with NASA. –As soon as a clarification has been provided, industry support will be requested by a Work Order.  Columbus SD&I Feb –Agenda Point 3.5 Differences in NASA/Columbus Display Nomenclature –Mr. Hajen explained the issue based on example (Attachment 3.5). The principle was already discussed at the last QPM where ESA took the action to define the next steps – the action is overdue. ESA will work the action now with Ops/Mikael Wolff.