Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.

Slides:



Advertisements
Similar presentations
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Requirements from the experiments D. Macina (EN/MEF) Conceptual Design Review LHC Phase II Collimation, CERN April Many thanks for input and discussion.
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
Background Simulations for the LHCb Beam Condition Monitor Overview: ● The LHCb Beam Condition Monitor (BCM) – Purpose, Design and Function – Implementation.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
With a lot of help from Reine Versteegen, John Jowett, Richard Jacobson, Burkhard Schmidt, Gilda Scioli, Werner Herr CERN-LHC * IP5 IP1 IP8 Spectrometer.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
Simulation comparisons to BLM data E.Skordis On behalf of the FLUKA team Tracking for Collimation Workshop 30/10/2015 E. Skordis1.
Karsten Eggert / PENN State - p. 1 Karsten Eggert CERN / PH Proton Detection at IP3 Enlarge the acceptance for diffractive protons to lower  p/p ~ 10.
The integration of 420 m detectors into the LHC
LHC forward detectors EN/MEF roles & responsibilities MEF group meeting, 24 th November 2010 A. L. Perrot- EN/MEF-LE.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
First collisions in LHC
Fabio Follin Delphine Jacquet For the LHC operation team
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
Impact of running with LHCf and early Totem 90 m optics
First data from TOTEM experiment at LHC
Machine-Experiment Interface
Emmanuel Tsesmelis TS/LEA 26 January 2007
The Status of the LHC Machine and the Experiments
Safe mode transmission
Spectrometer Operation in IP2 & 8
Disabling Rules.
Remote setting of LHC BLM thresholds?
Summary of Week 16 G. Arduini, J. Wenninger
Equipment of experiments directly interfering with the beam operation
Beam Dump and Injection Inhibits
Wednesday 03/11 – The Plan Finish electron-cloud program:
Luminometer Integration at IR2
90m "proper" VdM scans in the 90m/10m optics
Interlocking of LHC experiments
Beam Interlocks for Detectors and Movable Devices
Tuesday – Morning and Evening
LHC LUMINOSITY (RATE) MONITORS
HI2011 Commissioning Status
Presentation transcript:

Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their fundamental input to this talk Workshop Chamonix XV: January 2006

General considerations Hardware, software and procedures are implemented according to our PRESENTLY BEST knowledge of what the operation of the machine and experimental devices will look like However, the real challenge in the operation of these devices will become clear only when the machine will be operational Therefore, it is very important to keep flexibility in the actual implementation of the hardware, software and procedures

Overview: magnets TOTEM / CMS ALICELHCb ATLAS DIPOLE SolenoidBarrel Toroid L3 Solenoid CMSCMS LHCbLHCb ATLAS ALICEALICE Solenoid EC Toroid

Magnets operation Dipoles will distort the beam orbit and their effect has to be compensated locally with dedicated compensation magnets. Therefore, their operation is tightly related to beam operation –All experimental dipoles will be operated by the machine and ramped with energy Solenoids create couplings and orbit distortions that, in some cases, may have to be compensated during beam operation: –ATLAS and CMS solenoids (and toroids) will be operated by the experiments themselves (at least during the first years of operation) –ALICE proposes that the machine operates all its magnets (the solenoid in addition to the dipole) The status of all magnets will be monitored in the CCC (information sent via the DIP protocol) Beam interlocks may be implemented if needed A procedure on the magnets operation needs to be established and agreed between the experiments and the machine

Overview: movable detectors TOTEM / CMS ALICELHCb ATLAS LHCb ATLAS ALICE ZDC Roman Pot TOTEM Roman Pot VELO

ALICE ZDC Located at 116 m from IP2 Used during HI runs to measure: –centrality of the collision –absolute luminosity ZP may be used during pp runs to study diffractive physics IP2 ZN ZP

Injection The ZDC is at garage position Collisions established (or before, i.e. during ADJUST mode) 1) the ZDC are positioned at the theoretical beam level 2) vertical fine adjustment may be needed to center the two calorimeters at the beam level ZDC operation Garage position (20 cm below the beam level) Injection: to protect the calorimeters from possible beam losses Whenever data taking is not needed to minimise the absorbed dose Data taking position (at beam level)

Interaction with the LHC machine during operation (1) LHC vacuum chamber (located outside vacuum chamber => no direct interaction with the beam) anticollision switches top cover ZP ZN ~ 3 mm

Interaction with the LHC machine during operation (2) The technology has been chosen recently ZN only used in HI runs ~10-20 % I just in front of ZN does not spoil the energy measurement. The effect on the measurement of the impact position of the particles is presently under study The compatibility with the ZN depends on the amount of converter necessary for the luminosity monitor. If NOT compatible: –Place converter on movable support –Use ZN to monitor luminosity (and to bring beams into collision) D2 TCTH ZN ZP Luminosity Monitor Luminosity monitor IP2

ZDC operation ALICE has agreed to be responsible for the positioning of the ZDC during beam operation The LHC machine is fully responsible for the zone where the ZDC is located Interaction with the Luminosity Monitor operation only during HI run: if Luminosity Monitor’s absorber not compatible with ZN, we have backup solutions compatible with both the ZN and the LHC machine operation

VErtex LOcator Pile up VETO Modules Interaction region VELO is located in the LHCb cavern VELO consists of two halves which move in the horizontal plane to reach the final position, i.e. 5 mm from beam axis ( ~ 70 σ from beam axis at  * = 10 m) Technically, VELO is able to touch the beam VELO has a fast precise standalone tracking system and it is able to locate vertices with a precision of ~ 10 μm in the transverse plane in a fraction of a second

VELO: operation VELO will be operated by the LHCb collaboration At injection VELO is in the open position (3.5 cm from beam axis) For the VELO operation, LHCb will use an online monitoring which is able to reconstruct the collision vertices (and therefore the luminous region) with very high precision In general, VELO will not move if there are no collisions It takes about 5 minutes to go back from the data taking position to the garage position Radiation monitors located close to VELO are under study. Their effectiveness in detecting dangerous situations during collisions (like beam too close/scraping the VELO vacuum shield) has still to be demonstrated When in UNSTABLE BEAM Mode, the operator should always keep in mind that VELO is not in the GARAGE. On the other hand, since the repositioning of VELO will introduce some dead time in the data taking, future experience will tell if it is really necessary to move VELO when in UNSTABLE BEAM Mode

Roman Pots Located in the IR5 (IR1) tunnel The pot will approach the beam at a distance of ~ 10  to measure elastic and diffractive protons TOTEM XRP station consists of 4 pots moving in the vertical plane and two pots moving in the horizontal plane ATLAS XRP station consists of 4 pots moving in the vertical plane TOTEM XRP station

Roman Pot: operation (TOTEM) Injection: RP is in the open position (4 cm from beam axis) Stable beam: RP starts to move: –Initial information on the beam position is given by the BPMs integrated & located close to the RP stations –The pots move by <= 35 mm (resolvers and LVDT) watching the signal from BLM (their effectiveness still to be demonstrated, even if very useful at the SPS test) –The vertical pots are centered around the beam axis using the on-line data from the detectors located inside the pots and equalizing the data-rate. Additional information from the positioning system will be used too –10 σ distance is carefully reached watching BLM (real distance will be dictated by the machine running conditions) –Then the horizontal pot is moved in using a similar procedure –Once data taking is started, a MOVEMENT_INHIBIT will be switched on (TOTEM proposal under discussion with the MPWG) –Roman Pot commissioning will be initially done without detectors (BLM calibration) and later with detectors (radiation monitor and scaler rates vs BLM)

Roman Pot: safety The nominal distance from beam axis is 10 σ. Technically, the RP is able to touch the beam Therefore, safety is a very important issue: –The Collimator Control System has to ensure that the Roman pots are always in the shadow of the collimators for safety reasons => the Collimation Control System and the Roman Pots Control System have to be integrated/linked together –Experiments agree to operate RP from the CCC (good communication between the CCC and the experiments fundamental) –Initial contact between the Collimator Control Group and the experiments held in October However, no big progress since then…

Conclusions and remarks Magnets: all dipoles and ALICE solenoid operated by the machine. ATLAS and CMS magnets operated by the experiments. Detailed procedures on their operation to be agreed in the coming year ALICE ZDC: operation for data taking done from the ALICE Control Room. However, machine is fully responsible for the zone where the ZDC is located VELO: operated by the LHCb Control Room. Effectiveness of the radiation monitors under study Roman Pot: –Operated from the CCC –Functional specifications on their operation has been prepared by TOTEM and presently under discussion –A major work has still to be done on the integration of the RP Control System with the Collimation Control System