SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT - 2014 July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.

Slides:



Advertisements
Similar presentations
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Lecture 1. Balanced Three-phase Systems From Network to Single-phase Equivalent Circuit Power plant TransformerSwitching station LineLoad Three-phase.
Lesson 8 Symmetrical Components
Fault Analysis As per ANSI standard NO.ANSI/IEEEStd S. A. Soman Department of Electrical Engineering IIT Bombay Powai Mumbai
Resource Data Needed For Dynamic Simulations
Carol Chessmore Oncor 2013 DWG Vice Chair 2014 DWG Chair - Pending ROS Approval January 9, 2014 ERCOT ROS Meeting Austin, TX.
Chapter 4 Synchronous Generators
Two-pole,3-phase,wye-connected,salient-pole synchronous machine
Today’s Topics 1- The per unit system 2-Transformer Voltage Regulation
Activities of IEEE Power System Relaying Committee WG-24: Modification of Commercial Fault Calculation Programs for Wind Turbine Generators WG Chair: Sukumar.
EE 369 POWER SYSTEM ANALYSIS
© 2012 Siemens Industry, Inc. All rights reserved. Answers for infrastructure. ERCOT RARF Workshop Siemens PTI Procedures Alicia Dortch Nelson J Bacalao.
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Example 1 A 9375 kVA, 13,800 kV, 60 Hz, two pole, Y-connected synchronous generator is delivering rated current at rated voltage and unity PF. Find the.
Network Modeling Group Modeling Off Nominal Transformers in NMMS By Nitika Mago, Model Administration.
Symmetrical Faults Instructor: MOHAMMAD ABDUL BASEER
Current Contribution from Wind Plant for a System Fault Working Group C17 May 2010 Meeting.
PSS/E Version 33 Dynamic Conversion
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Some practice problems At end of the module G1 student text are some problems. I suggest that you work on problems 1, 4, 6, and 7. This will provide you.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
CIM for Planning and CIM for Dynamic Models - Project Report Terry Saxton Xtensible Solutions CIM User Group Vasteras, Sweden June.
Electric network faults seen by a wind farm – analysis of measurement data Sanna Uski, Seppo Hänninen, Bettina Lemström.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Announcements Please read Chapter 3; start on Chapter 6
RARF DATA for TYPES 3 & 4 WTGs Fault Current Contribution for Current Limited Resources Ed Geer, P.E. Network Model Engineer, Sr. SPWG Meeting July 17,
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
TPIT using Model On Demand Jay Teixeira Manager Model Administration Regional Planning Group 5/21/13.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
1 Department of Electrical & Communication Engineering CHAPTER 1 Per Unit Calculations 1.Power System Representation Power Component SymbolPower ComponentSymbol.
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
ECE 576 – Power System Dynamics and Stability
WGR Equivalent Modeling Keith Smith Network Model Engineer RARF Workshop III August 29, 2013.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 Update to NATF on Resource Registration Feb 2, 2010.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Lecture II Objective: Representation of sequence components
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
I have run across some modeling inconsistencies between the 2013 and 2014 posted short circuit cases. Attached are screenshot examples, the differences.
Reliability and Operations Subcommittee Report 2/2/2012.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 19 Fault Analysis, Grounding, Symmetrical Components Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration.
Data Requirements For Calculating Geomagnetically Induced Currents ROS Meeting March 3, 2016 Michael Juricek PGDTF Chairman 1.
GANDHINAGAR INSTITUTE OF TECHNOLOGY Electrical Power System
Impact of Distributed Generation on Fault Induced Transients: A Case Study Sukumar Brahma Adly Girgis Clemson University Electric Power Research Association.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye University of Illinois at Urbana-Champaign 1 Lecture 23: Small Signal.
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
ECE 476 Power System Analysis
Qiuli Yu, Jay Teixeira, and Ed Geer
Exercise 7 Power systems.
WECC Short Circuit Analysis
WECC Short Circuit Analysis
Exercise Session 11 Power systems.
Exercise 9 Power systems.
Presentation transcript:

SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT

2 Topics Case Building Process for Current Year and Future Year Cases o Current Year Case Process o Future Year Case Process o Software Requirement/Update Case Development and Achievement in 2014 o Generator Synchronization with SSWG o Sequence Impedance o Grounding Impedance o Voltage Profile o Current Limit Wind Farm Modeling—WTG Equivalent Circuit Jul 17, 2014

3 Case Building Process – Current Year Time Span o From Mid-December (Previous Year) to Mid-April (Current Year) o Total 6 Passes – Pass 0, 1-4, and Final Pass o Two Weeks for TSP to Submit Change Files o One Week for ERCOT to Develop Short Circuit Model Base Case o Future Year Final Pass created last year o Example: 2015 CY base case = SPWG_2015_FY_UPDATED_ _FINAL July 17, 2014

4 Case Building Process – Future Year Time Span o From Mid-April (Current Year) to Mid-July (Current Year) o Total 6 Passes – Pass 0,1-4, and Final Pass o One Week for TSP to Submit Change Files o One Week for ERCOT to Develop Short Circuit Model Base Case o Current Year Final Pass created in current year o Example: 2016 FY base case = SPWG_2015_CY_UPDATED_04xx2015_FINAL July 17, 2014

5 Summary – Base Cases for CY and FY This Year’s Base Case Base Case to be Used for Creating the New Base Case When the Base Case is Created 2015_CY SPWG_2015_FY_Updated_ _Final.DXT Last Year (2014) 2016_FY SPWG_2015_CY_Updated_xxxx2015_Final.DXT This Year (2015) 2017_FY SPWG_2015_CY_Updated_xxxx2015_Final.DXT This Year (2015) 2018_FY SPWG_2015_CY_Updated_xxxx2015_Final.DXT This Year (2015) 2019_FY SPWG_2015_CY_Updated_xxxx2015_Final.DXT This Year (2015) 2020_FYSPWG_2015_CY_Updated_xxxx2015_Final.DXTThis Year (2015) July 17, 2014

6 Summary – Change Files for FY Cases 2015 FY 2016 FY 2016 CHF 2015 FY 2017 FY 2017 CHF 2015 FY 2018 FY 2018 CHF 2015 FY 2019 FY 2019 CHF 2015 CY 2016 CHF 2016 FY 2015 CY 2017 CHF 2017 FY Cases Built Last Year July 17, 2014

7 Software Requirement and update ERCOT and TSPs: o PSSE v33 o ASPEN OneLiner V12.4 ERCOT: o RARF Database o MODFileBuilder v33 July 17, 2014

8 Case Development and Achievement in 2014 Add generators to synchronize with SSWG cases o Grandview, PH1, PH2, WindThorst, Stephens Ranch, Spinning Spur Wind 3, Long Horn, RenTech Project, Hereford,…… o Most new gens are wind farms o Some gens with incomplete RARF data have not been modeled Sequence Impedance Data (P.U.) o Come from RARF submitted by REs o Some verification rules: X”<X’<X R 0 &X 0 may be for WTG o Process: Query out from RARF database and manually copy/paste to PSSE file Jul 17, 2014 Direct Axis Subtransient Reactance (Saturated) X" Direct Axis Transient Reactance (Saturated) X' Positive Sequence resistance R 1 Positive Sequence reactance X 1 Negative Sequence resistance R 2 Negative Sequence reactance X 2 Zero Sequence resistance R 0 Zero Sequence reactance X 0

9 Case Development and Achievement in 2014 (continue…) July 17, 2014

10 Case Development and Achievement in 2014 (continue…) Voltage Profile o Voltage profile is the Vsched (pu) in the Machine Tab in PSSE o Come from SSWG base case (PSSE raw file) o Process: Manually copy from SSWG base case and paste into SPWG PSSE file July 17, 2014 Bus NumberBus NameId Area Num Area NameCodeVSched (pu) 1007AAAA11XXXX BBBB11XXXX CCCC11XXXX DDDD11XXXX EEEE11XXXX FFFF11XXXX GGGG1901YYYY HHHH11XXXX IIIIF6ZZZZ JJJJEQ14QQQQ KKKKN27RRRR21

11 Case Development and Achievement in 2014 (continue…) July 17, 2014

12 Wind Farm Modeling—WTG at Different kV Currently WTG are modeled at different kV levels in SPWG: o kV o kV o 34.5 kV July 17, 2014

13 Wind Farm Modeling—WTG Equivalent Circuit (Future Work) Equivalent Circuit and Parameters (One Feeder): Individual WTG will be aggregated per feeders Topology and Parameters – RARF Hope to complete December of 2014, depending on RARF data submission July 17, 2014

14 Possible Methods for WTG Equivalent Circuit Development Method 1 – Fault Current Simulation Using PowerWorld July 17, 2014 Fault Current Magnitude: p.u. Fault Current Angle: degrees

15 Possible Methods for WTG Equivalent Circuit Development Method 2 – Equivalent impedance calculation based on Wind Farm topology and collector system parameters July 17, 2014

16 Possible Methods for WTG Equivalent Circuit Development Method 3 – Use equivalent network function in PSSE/PowerWorld? Any Comments? July 17, 2014

17 Questions July 17, 2014