THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Advertisements

GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Mission Success Starts With Safety Michael J. Sampson, Program Manager, Workmanship and EEE Parts Assurance NASA GSFC, Greenbelt, MD Code 306, Systems.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
1 Coupon Evaluation for GSFC Flight PWBs presented by Diane Kolos Materials Engineering Branch NASA Goddard Space Flight Center November 14, 2007.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
THEMIS IDPU PDRPCB- 1 UCB, October 16, 2003 IDPU Power Control Board (PCB) Peter Berg University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Electric Field and Waves Instrument (EFW)
THEMIS Mission Assurance
ISUAL Product Assurance
Boom Electronics Board (BEB)
Preliminary Design Review
Radiation Belt Storm Probes Electric Field and Waves Instrument
University of California - Berkeley
BRIAN KLATT MISSION ASSURANCE MANAGER
Presentation transcript:

THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley

THEMIS Instrument PDRParts- 2 UCB, October 15-16, 2003 Overview Parts & Materials Overview Requirements Parts Quantities Quick Overview Parts List Data Bases, Lists Parts, Long-Lead Items

THEMIS Instrument PDRParts- 3 UCB, October 15-16, 2003 Requirements GSFC 311-INST-001 Instructions for EEE Parts Selection, Screening, Qualification Minimum EEE Parts Criteria for Level 3 = Moderate level of risk, as permitted by cost constrains Parts in compliance with 311-INST-001, Level 3 (Grade 3) requirements and Standard parts Use of GSFC PPL 21 (GSFC Preferred Parts List), design permitting Particle Impact Noise Detection (PIND), per MIL-STD-750 and MIL- STD883, required for cavity devises Impose on manufacture, if possible When needed, have DESC approved test facility perform testing Customer Source Inspection (CSI) and/or Destructive Physical Analysis (DPA) for complex or known problem devices

THEMIS Instrument PDRParts- 4 UCB, October 15-16, 2003 Requirements (continued) Non-standard EEE parts will require at a minimum: Plastic Encapsulated Microcircuits (PEM) Selection, Screening, and Qualification (NASA/TP , PEM-INST-001) DPA, Preconditioning, Highly Accelerated Stress Test (HAST), and CSAM (Center for Surface Analysis of Materials) Testing Radiation Testing Total Ionizing Dose (TID) Requirement is 66Krads (si) - Review existing test data from GSFC, JPL, and manufacturer - Review NASA “where used” historical data Parts can be used, if data and or orbit requirements equal or exceed THEMIS requirements Cobalt 60, TID testing will be performed as needed Single Event Effects (SEE) use existing data or historical use (similarity) - Whenever possible designers will use latchup immune devices

THEMIS Instrument PDRParts- 5 UCB, October 15-16, 2003 Parts & Material Quantities Quick Overview SCM, EFI, BMD, BEB, DFB, FGE/PCB, DCB/ETC, LVPS, SST, ESA, Backplane: 5 Flight + 1 Flight Spare EFI Preamps: 6 Flight per SC+ 4 Flight Spares (40 Total) Spin Plane Boom (SPB): 4 Flight per SC+ 4 Flight Spares (28 Total) Axial Boom (AXB): 2 Flight + 2 Flight Spares (14 Total)

THEMIS Instrument PDRParts- 6 UCB, October 15-16, 2003 EEE Parts List - I UCB/SSL QA will maintain an EEE Parts Identification List (PIL) The PIL will contain: Manufacturer’s generic part number Military Part Number or SCD number Manufacturer(s) Where used (unique assembly) / Quantity Quantity used Quantity ordered Lot/Date Code Radiation Status (TID/SEL) Alert Status Comments

THEMIS Instrument PDRParts- 7 UCB, October 15-16, 2003 EEE Parts List – II (continued) Parts will be procured to an approved Parts List. -Schedule permitting, will procure common buy. -Procurement of devices will be based upon design engineer’s confidence-of-use factor of 70%. -Unique, high-dollar items will be based on a 90%-100% confidence level. -Minimum Attrition / Spares factor of 20%-30% will be applied to flight procurement quantities. Non-standard devices will have more spares. -Schedule and cost permitting, engineering test units (ETU) will use flight qualified parts, especially, where minimum buy quantities are imposed. ETU and Flight unit -Procurement will run concurrently

THEMIS Instrument PDRParts- 8 UCB, October 15-16, 2003 EEE Parts List – III (continued) Flowdown Performance Assurance Implementation Plan (PAIP) requirements on subcontractors Parts Control Board (PCB) PCB members are: Themis QA, Design Engineer, and Themis Project manager, or representative PCB shall review EEE part for: -Testing, Screening, and Qualification Failures -Alerts (e.g., GIDEP) -Review Non-Standard Parts Requirements

THEMIS Instrument PDRParts- 9 UCB, October 15-16, 2003 Data Bases & Lists Material DB List is posted on Apollo

THEMIS Instrument PDRParts- 10 UCB, October 15-16, 2003 Data Bases & Lists Data Base on FTP Apollo: MS Excel DB, THM_All_Parts_Rev20.xls

THEMIS Instrument PDRParts- 11 UCB, October 15-16, 2003 Data Bases & Lists Summary Parts Lists Individual Board Parts Lists

THEMIS Instrument PDRParts- 12 UCB, October 15-16, 2003 Long-Lead EEE Parts 1 Main List, 102 Active Parts, 11 TID,SEE Test Parts

THEMIS Instrument PDRParts- 13 UCB, October 15-16, 2003 Long-Lead EEE Parts (continued) Amptek A121, ESA, on order A225F, SST, pending A250F, ETC, pending 2.Honeywell HX6228, SRAM, DFB, DCB, ETC, SST, on order 3. 3D-Plus PROMETHEE1, Preamp, SCM, on order PROMETHEE2, V-regulator, SCM, on order MMSD S-C-1S, SRAM, DCB, on order