Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.

Slides:



Advertisements
Similar presentations
CALICE meeting, Montreal, 10 th May 2006Václav Vrba, Institute of Physics, AS CR ECAL Si sensors status and plans May 2006 V.Vrba.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Portland, October 20, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba* Institute of Physics, AS CR, Prague *for CALICE collaboration Silicon.
ECFA-DESY meeting, Krakow, 16 th September 2001Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics AS CR, Prague Silicon pad sensors.
Silicon Preshower for the CMS: BARC Participation
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Vanel Jean-Charles LLR / IN2P3 NIKHEF 1-4 April 2003 NIKHEF 1-4 April 2003 Technical status of the W-Si project CALICE : CAlorimeter for the LInear Collider.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
St Malo, 13 th April 2002Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon pad sensors for W-Si ECal.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
J-C BRIENT LLR AGENDA CALORIMETRY and other subdetectors session J-C. BRIENT LLR Status report on the W-Si ECAL 30’ V. VRBA IP-ASCR Silicon pad sensors.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
03/12/07 Jon S Kapustinsky LANL Jon S Kapustinsky, LANL Forward Vertex Detector Collaboration Meeting UNM, March 12, 2007 Outline: FVTX Overall Description.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
10 October 2003, FCM, Krakow Michal Tomášek, Institute of Physics AS CR 1 Michal Tomášek, Václav Vrba Institute of Physics, AS CR, Prague Measurements.
Front-End electronics for Future Linear Collider W-Si calorimeter physics prototype B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Performance of the PHENIX NCC Prototype Michael Merkin Skobeltyn Institute of Nuclear Physics Moscow State University.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
JRA3 Institute of Physics ASCR Prague
CALICE Silicon ECal Sensors Status and prospects
FCAL R&D towards a prototype of very compact calorimeter
ECAL EUDET MODULE Summary talk
LumiCal mechanical design, integration with LDC and laser alignment
New Design for Beam Test Structure
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Peter Kodyš, Zdeněk Doležal, Jan Brož,
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 2 CALICE ECal TPC ECal HCa l tungsten coil ModuleModule vertical structure Detector slab }

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 3 Physics prototype – Detector slab (C / W) structure type H Front End electronics Cooling system Aluminum shielding Silicon sensor array sensor pad 1 x 1 cm 2 Vertical cross section

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 4 Detector Slab Dimensions 8,3 mm Aluminum foil : ~0.1 mm PCB : 2.4 mm Si wafer : mm Carbon fiber : 0.15 mm W plate : 1.4 mm

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 5 Gluing of Si wafer Choice of the Glue : –Good conductivity –Polymerization at low temperature (Typ. ~ 40° C) –Time of polymerization Some test : –First : PCB on PCB –Second : with real Si wafer EPO-TEK® EE129-4 : Room temp/16 hr cure: ohm-cm Room temp/20 hr cure: ohm-cm Room temp/72 hr cure: ohm-cm

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 6 A automatic device is use to deposit the conductive glue : X-Y-Z table (400×400×150 mm 3 ) with glue dispensing tool (conductive glue) 270 Gluing and placement (  0.1 mm) of 270 wafers with 6×6 pads About points of glue. Gluing of Si wafer

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 7 PCB and Front End electronics details : Silicon wafer Composite Tungsten PCB Front End electronics Flexible circuit max 4.5 mm Physics prototype – detector slab PCB : - 14 layers - Thickness 2.4 mm

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 8 Physics prototype - sensors Wacker 530  m material, ≈ 6 k  cm Topsil 500  m material, 12 k  cm Two Si sensor vendors : ON Semiconductor, Czech Rep. Elma, Russia ON Semiconductor prototype sensors measured and qualified: New design gds file prepared and submitted to ON Semiconductor :

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 9 Sensors for Physics Prototype One wafer is a Matrix of 6 x 6 pixel of 1 cm 2. Important point : manufacturing must be as simple as possible to be near of what could be the real production for full scale detector in order to : Keep lower price (a minimum of step during processing) Keep lower price (a minimum of step during processing) Low rate of rejected processed wafer Low rate of rejected processed wafer good reliability and large robustness good reliability and large robustness Number of active Wafer needed for the physic prototype : will be produce by Institute of Nuclear Physics - Moscow State University 150 will be produce by Institute of Nuclear Physics - Moscow State University 150 will be produce by Institute of Physics, Academy of Sciences of the Czech Republic - Prague 150 will be produce by Institute of Physics, Academy of Sciences of the Czech Republic - Prague 4” High resistive wafer : ~6 K  cm Thickness : 525 microns  3 % Tile side : Guard ring In Si ~80 e-h pairs / micron  42 ke - /MiP Capacitance : ~25 pF Leakage current : 1 – 5 nA Full depletion bias : ~150 V Nominal operating bias : 200 V

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 10 Cosmic test bench: general view

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 11 Physics prototype – test setup for cosmics Cross-section 1 st X-Y line (scintillating fibers) 2 nd X-Y line (scintillating fibers) 4 silicon wafer tested Detector slab 1 mm - Measurement surface : 128  128 mm - Precision : 0.5 mm

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 12 Physics prototype – test beam setup ECAL general view 3 rd structure (3×1.4mm of W plates) 370 mm 180 mm Silicon wafer 2 nd structure (2×1.4mm of W plates) VME/… HCAL VFE Movable table ECAL Beam monitoring BEAM 1 st structure (1.4mm of W plates) Detector slab 370 mm

Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 13 Critical issues  Integration of mechanics and electronics  Beginning of 2004: slab assemblies for tests with cosmics Outlook and plans  Summer-Autumn 2004: the Physics prototype for e- beam  Summer 2005: common irradiation with HCal with hadron (π,p) beams  cooling