WPSS Phase 2 – CERN 14/762012. PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process.

Slides:



Advertisements
Similar presentations
Mobile phone based real time solution to track completed / in progress work The programme officer initiates the work by capturing the site image, GPS.
Advertisements

Team 10: SHERPA May 3, Our Team Outline Project Selection Our Project Design Choices Obstacles Our Prototype Future Additions What We Learned Acknowledgements.
Uniworld Wire-less Wireless at Your Fingertips.
Jeopardy Objects Navigation Buttons True/False Parts of a Report Vocabulary Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final.
CERN, Geneve 14 Jun WPSS-PHASE 2 WPSS PH-2 Scheduling.
O. Beltramello – A brief reminder of the project status : Phase1 (July 2011 – March 2012): Development of several system prototypes: - test.
Status Report #4 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
Enterprise Architecture for Delivering Spatial and Tabular Data and Associated Documents to Managers and Field Personnel Bill Slocumb GIS Professional.
Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
Two Broad Categories of Software
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
6. & 7. Teams: Technical Specification / Schedule Project Title Team Member 1 Team Member 2 Team Member 3 Team Member 4 Department of Computer Science.
6. & 7. Team Technical Specifications and Schedule Wayne Dyksen Brian Loomis Department of Computer Science and Engineering Michigan State University Spring.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
Phase Difference = Phase Difference = 0.05.
Microsoft Operations Manager Presented by: Alen Plicanic.
Experiment Management System CSE 423 Aaron Kloc Jordan Harstad Robert Sorensen Robert Trevino Nicolas Tjioe Status Report Presentation Industry Mentor:
Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006.
A complete solution for archiving Domino mails using one Server task for hundreds of Notes users A. Kogan EDV Ltd. & Co. KG
The Platforms enabling Wireless Sensor Networks Hill, Horton, Kling, Krishnamurthy CACM, June 2004.
Status Report #06 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
WP3: Progress Report Serafeim Katsikas & Fasiul Alam 1.
USB & Analog Connection Windows, Mac, Linux Compatibility UVC (USB Video Class) Standard.
Computer Networks, Fifth Edition by Andrew Tanenbaum and David Wetherall, © Pearson Education-Prentice Hall, 2011 The Application Layer Chapter
Retention and Disposition. Are messages public records? At NMU, all messages composed and maintained on University hardware are considered.
Real Security InterSwyft Technical information's.
WSN Done By: 3bdulRa7man Al7arthi Mo7mad AlHudaib Moh7amad Ba7emed Wireless Sensors Network.
Software Framework for Teleoperated Vehicles Team Eye-Create ECE 4007 L01 Karishma Jiva Ali Benquassmi Safayet Ahmed Armaghan Mahmud Khin Lay Nwe.
CDS/ISIS Clearing House Workshop 2003 – Patrick Huby, Davide Storti Recent developments.
Rainforest Project Proof of Concept phase Diagrams, Images.
S-27 / Basics of the Project Schedule / AIA Convention 1998 / 1 S-27 Designing the Project Schedule Phillip G. Bernstein, AIA Cesar Pelli & Associates.
MB race T ech mB 1 Antonio DeMendonca Albert Lopez Lourdes Alvarez Antony Acha 19 September, 2011 mB 1 is a bracelet connected to a cellular phone via.
MB race T ech mB 1 Antonio DeMendonca Albert Lopez Lourdes Alvarez Antony Acha November 14, 2011 mB 1 is a bracelet connected to a cellular phone via Bluetooth.
Campus Locator – Cell Phone Interface (May06-05) Dr. John Lamont Prof. Ralph Patterson III Faculty Advisors Iowa State University Senior Design Client.
MESSAGE ORIENTED MODEL (MOM). Slide 2CITE 4420 Message Oriented Model Message-Oriented Model (MOM)
Escape Systems Mar 01 AIRCREW SYSTEMS ILSMT BRIEFING NACES ADVANCED ELECTRONIC SEQUENCER PROGRAM FUTURE ADVANCED SEQUENCER TECHNOLOGY (FAST)
WPSS Phase 2 Audio/Video Hardware & Software Architecture Christos Papachristou, Dipl-Eng, MSc, PhD.
Straw data transfer Vladimir Tryanin, JINR. 11/14/2015Straw data transfer2 Outline task description, tools for realization, straw data, developed system,
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
Final Class Diagram for C++ Implementation Clickermatic Software Clicker.
February Testing Campaign Summary. Disclaimer This presentation is based on the reports of the testing campaign and focuses on the problems arisen during.
Activity Monitoring Tool MIS 2008/2009 Software Project - Group 1 1/4 Architecture Technical Manager.
Status Report #2 Walking Charger By: Carlos Benitez, Meryem Fennich, Srinath Kota, Jacksario Rosario September 15 st 2010 Description: Battery charger.
Types of Software Chapter 2.
Harris IPPD Project. WinReality Software.
By: Hossein and Hadi Shayesteh Supervisor: Mr. James Connan.
Quad Chart – Format Photograph or artist’s concept of the project end- item. Ideally, this will convey the main idea of the final capability/use of the.
Status Report #8 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
UNIW RLD WIRELESS.  What if you couldWhat if you could  The best in wireless technologyThe best in wireless technology  Features Features  Technical.
1 James N. Bellinger University of Wisconsin-Madison 30 January 2008 DCOPS Software Report.
Project May07-14: Restaurant Automation April 24, 2007.
CSC , Fall, 2013 Project Work. Copyright Fall 2013, Rudra Dutta, NCSU Project Objectives Propose and develop a solution/tool for some specific.
Securely Managing VMS from a Windows Environment 1.
EDUSAFE FINAL CONFERENCE June, 2016
Control System (CS) and Data Acquisition (DAQ) architecture for the radiation background monitoring of a Personnel Safety System in the ATLAS cavern. Adamidi.
OpenCluster Planning Sverre Jarp IT Division CERN October 2002.
Design and Implementation of versatile ebot using raspberry pi
Scrum meeting.
10/month is the present production rate 2 FTE + sporadic contributions
Software Development Life Cycle (SDLC)
Vanderbilt Senior Design Project
FSAE Instrumentation 01/13/09
Get Updated Free Microsoft MB Braindumps | Dumps4download
Scheduler 1.0 By Vipul Sabhaya Udam Dewaraja.
زبان بدن Body Language.
SCADA Communication and Architecture Principles
Project Prototype Demo 1 Grading Rubric
Requirements Management
How New Hardware Has Affected Software Architecture
Presentation transcript:

WPSS Phase 2 – CERN 14/762012

PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milestones WPSS Phase 2 – CERN 14/762012

PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milestones WPSS Phase 2 – CERN 14/762012

PTU Heart Beat Sensor Dosimeter Camera /Leds Speaker/Microphone Batteries Sensors Body Temperature WPSS Phase 2 – CERN 14/762012

Software - DAQ System PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milestones WPSS Phase 2 – CERN 14/762012

PTU Software Language: C Operating System: ISOS Language: C++ Operating System: LINUX Language: C# Operating System: Windows Server 2003 WPSS Phase 2 – CERN 14/762012

Header { "Sender": "PTU123", "Receiver": "Broadcast", "FrameID": "357", "Acknowledge": "False", Messages "Messages": [ { }, { }, { }, { }, { } ] } { "Type":"measurement", "Sensor":"CO2", "Time":"12/3/ :24:30", "Method":"OneShoot", "Value":"123", "Samplerate":"", "Unit":"mm3" } { "Type":"event", "Sensor":"Temperature", "EventType":"Up level", "Time":"12/3/ :25:30", "Value":"12" } { "Type":"error", "ErrorNo":"1254", "Description":"Wrong message", "Time":"12/3/ :25:30", "Criticality":"low" } { "Type":"report", "BatteryLevel":"80", "CameraHandheld":"0", "Time":"12/3/ :25:30", "CameraHelmet":"1", "Audio":"1" } { "Type":"order", "Sensor":"Humidity", "Parameter":"SamplingRate", "Value":"1000" } WPSS Phase 2 – CERN 14/762012

Scheduling - Milestones PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milstones WPSS Phase 2 – CERN 14/762012

Scheduling WPSS Phase 2 – CERN 14/762012

Milestones Milestone TitleTime 1Final Enclosure DesignEnd of Task 1 2PTU 1 IntegrationEnd of Task 8 3PTU 1 Performance EvaluationEnd of Task 9 4Helmet Camera IntegrationEnd of Task 20 5Handheld Camera IntegrationEnd of Task 25 6Final PTU IntegrationEnd of Task 12 7Field TestsEnd of Task 14 WPSS Phase 2 – CERN 14/762012

Meetings Metting TitleTimePlace 1Enclosures ReviewEnd of Task 1Teleconference 2PTU 1 EvaluationDuring Task 9Athens 3Final PTU PresentationDuring Task 13CERN 4Project EvaluationAfter the field testsCERN WPSS Phase 2 – CERN 14/762012