Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
Advertisements

U.S. EPA Region 9’s New Response Action Levels 02 October 2014 Derral Van Winkle, P.G. NAVFAC Southwest, Environmental Restoration Program Manager.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
BoRit Superfund Site Timeline
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
August 2006 Polychlorinated Biphenyl Air and Bulk Sampling Results New Bedford High School New Bedford, Massachusetts Presented by: TRC Environmental Corporation.
ASSESSMENT OF EXISTING CONDITIONS ROBINSON SCHOOL WINDOW REPLACEMENT 5/2/ Robinson School: Assessment of Existing Conditions.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
Neponset River Capen Street Investigation Milton, MA Executive Office of Energy and Environmental Affairs (EOEEA) Department of Environmental Protection.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
INDOOR AIR QUALITY ASSESSMENT. Why is preliminary assessment required ? To understand the current indoor air quality problems To develop a database on.
Indoor Environmental Quality: Investigating the Problem
Keith Middle School/New Bedford High School Public Information Plan Meeting May 3, 2007 T HE S CIENCE C OLLABORATIVE NORTH SHORE.
Technical Considerations on the Quantifiability of Wood Smoke Health Impacts Regional Technical Forum November 18, 2014.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Status of the Data Collection Completed – State and Agency Surveys – Indoor Air Quality Study – Bulk Fuels Study – Large Multi-family Buildings Study In.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Discerning Background Sources from Vapor Intrusion Jeffrey Kurtz, Ph.D. and David Folkes, PE EnviroGroup Limited Denver Boston Albuquerque Seattle Colorado.
Three Kings Quarry 19 August 2013 – Site Liaison Group Meeting Site Monitoring Report 1.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
New Bedford High School & Adjacent Properties Status of Off-Site Environmental Investigations - Public Meeting July 12, 2006.
Parker Street Waste Site Public Information Plan (PIP) Meeting Wednesday – September 22, 2010.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
C O A L I T I O N Corner Radon: Health Hazard and Disclosure Issue Coalition Corner: Business training tools for HR staff, real estate licensees and other.
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
Parker Street Waste Site Public Information Plan (PIP) Meeting Wednesday – April 14, 2010.
David M. Sullivan, LSP, CHMM TRC Environmental Corporation Lowell, Massachusetts Parker Street Waste Site Public Information Plan (PIP) Meeting Milestone.
David M. Sullivan, LSP, CHMM TRC Environmental Corporation Lowell, Massachusetts Parker Street Waste Site Public Information Plan (PIP) Milestone Report.
SAINT FRANCIS HIGH SCHOOL Case Study Continuous Gas Monitoring Sacramento County Environmental Management Department.
TRC Investigation, Monitoring, and Remediation Status Report City of New Bedford Department of Environmental Stewardship T HE S CIENCE C OLLABORATIVE NORTH.
Parker Street Waste Site Public Information Plan (PIP) Meeting Wednesday – January 19, 2011.
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
Parker Street Waste Site Public Information Plan (PIP) Meeting Tuesday – August 18, 2009 New Bedford High School Campus Bethel AME Property Keith Middle.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Federal Aviation Administration 0 Composite Wing Tank Flammability November 20, Composite and Aluminum Wing Tank Flammability Comparison Testing.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Melissa Boggs California Department of Fish and Wildlife, Office of Spill Prevention and Response.
Formaldehyde Emission Modeling in Manufactured Homes Jacqueline Bayer 1, Dr. Patrick Gurian 2, and Dr. Jin Wen 2 1 BS/MS Student, Dept. of Civil, Architectural,
Building Survey and Bulk Material Sampling Techniques, Analysis of PCB Analytical Data For Building Materials, and Design of PCB Investigation Programs.
An Overview DCC Annual Retreat February 20, 2012.
Proposed Plan for No Further Action
Saxe Middle School Renovation
Chemical Metals Industries, Inc. (CMI)
Welcome.
Using the HAPSITE® as a Vapor Intrusion Investigation Tool
At facilities with subsurface contamination, what other chemicals may your workers be breathing? Matt Raithel.
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Connecticut Remediation Standard Regulations: Volatilization Criteria
Mount Vernon Community School
Thomas Prince School 170 Sterling Road Princeton, MA 01541
Evaluation and Control of Beryllium Exposure in Shipyards Risk Management Panel Project NSRP Subcontract No March 12-14, 2019 Charleston, SC.
Brownfield Corrective Action with Revised RRS
Chemical Metals Industries, Inc. (CMI)
Mount Vernon Community School
Community Practice Asset Management.
Presentation transcript:

TRC Investigation/Remediation Status New Bedford High School Vent Remediation Keith Middle School Air Monitoring City of New Bedford Department of Environmental Stewardship April 30, 2008 T HE S CIENCE C OLLABORATIVE NORTH SHORE April 30, 2008

Agenda  Vent Remediation Status at New Bedford High School (NBHS)  TRC Investigation/Remediation Status  TRC Air Monitoring at Keith Middle School (KMS)  Questions & Answers D. Sullivan, LSP, CHMM D. Vorhees, Sc.D.

NBHS Interior Remediation Status  Remediation Initiated – July 2007  Remediation Completed – August 2007  HVAC Repairs/Balance – February 2008  PCB Air Sampling – February 2008

PCBs > Indoor Air Action Levels Notes on Process ResponseStatus Visual Inspection (sources)Done Re-samplingDone Verbal Report to School/CityDone Interviews with personnelDone Consultation with laboratoryDone Supplemental Assessment Plan Submitted to City

Accomplishments All Ducts Cleaned* 20 HVAC Units Cleaned 250 Univent Heaters Cleaned 4000 Locker Bottoms Cleaned All HVAC Filters Replaced *Unless New

Accomplishments (cont.)  All fixed horizontal surfaces over eight feet (except newly painted).  207 Wipe Samples - 3 detections all below stds.  Significant interior PCB burden reduction.  Removal completed on schedule.  Air monitoring conducted following remediation (removal) and HVAC balancing.

Hallway Heating Unit and Ventilation System BEFORE AFTER

Discoveries  20 out of 120 Roof Top Exhaust Vents not working.  Over 40% of perimeter univents not working.  Contributed to mixed results from 2007 post-remedial air monitoring.

HVAC Status Air Handling System Repairs  Roof top exhaust fans replaced and operational  Unit ventilators restored to working order  Air handling system balanced

First Floor Air Sampling Locations February 2008 New Bedford High School Approximate TRC Sample Location Background Sample Location BG A-112-1(outside)

New Bedford High School Approximate TRC Sample Location A Second Floor Air Sampling Locations February 2008

New Bedford High School Approximate TRC Sample Location Third Floor Air Sampling Locations February 2008

Comparison of TRC NBHS Indoor Air Results August 2006, August 2007, and February 2008

NBHS Indoor Air Results - Min, Max, and Average (ug/m3) 2006, 2007, and 2008

PCB Indoor Air Monitoring Results for NBHS February 2008  Concentration Range:  ND, ug/m 3 to 0.13 ug/m 3  Locations Above Threshold for Further Investigation (0.05 ug/m 3 ): 2  Room A ug/m 3  Room A-212/ ug/m 3  Locations Above Acceptable Long-Term Average Exposure Concentration (0.3 ug/m 3 )  None  Eight interior non-detect results!

Working Hypotheses Elevated PCB Air Levels  Other PCB Source Contributions  Numerous low concentration sources  Preliminary bulk/air correlation  B-240 vs. A  Inadequate Ventilation During Testing  Old, malfunctioning exhaust/unit vents

Possible Correlation 2007 Bulk and Air Results MediumB-240A High Conc. Correlation Floor Tile Mastic 10.1 ppm 0.2 ppm B-240 Window Glazing 14.9 ppm 2.1 ppm B-240 Baseboard Mastic 4.5 ppm 2.0 ppm B-240 Old Paint 0.2 ppm 8.3 ppm Recent Paint 2.9 ppm 1.6 ppm B-240 Steel Beam Paint 6.4 ppm 4.3 ppm B-240 Air Result ug/m ug/m 3 B-240 Concentration Units: Bulk results in mg/Kg (ppm), Air Results in ug/m3

NBHS Interior Path Forward – Characterization and Planning  Characterize and map PCB sources  Proposed plan submitted to City  Anticipate EPA wanting further sampling regardless of Feb results  Formulate Additional Remedy  Based on PCB source mapping and other input (EPA)  Provide regular updates to school and public

 Source Removal  Manage in place  Encapsulation NBHS Interior Path Forward - Remediation

Encapsulation  Encapsulation uses impermeable epoxy paints, sealants, coatings  Innovative application for PCBs  Not EPA approved or tested  Will require pre and post flux chamber evaluations and other testing to demonstrate effectiveness to EPA

Manage in Place  Operations and maintenance of building materials  Maintenance of air handling systems, routine cleaning, lubricating  Periodic inspection of confirmed building materials, flaking paint  Remove when convenient during renovation (like asbestos)  Program of regular air monitoring  Teacher/parent buy-in  Staff training

TRC Soil Investigation  Initiated Fall/Winter 2007  Additional Work in March 2008  Back On-Site May 2008

 Previous Sampling  BETA - Residential Grid  BETA - Walsh Field  TRC - 94 soil boring residential survey to date  Analyses  PCBs (Aroclors/Homologs)  VOCs, PAHs, Metals, VPH  DBF, TPH (BETA) BETA Residential BETA Walsh Field TRC Residential PCBs PCB Homologs 0026 PAHs Metals VOCs 4504 VPH 002 Investigation Quantities Comparison

AMS Model 9100 New England Geotech  Track Mounted Geoprobe Rig  Compact (34 Inches Wide)  Access Tight Spaces/Bldg. Interiors  Propane Fuel  Low Impact

Model 6620DT New England Geotech  Track Mounted Geoprobe Rig  Suitable for Rugged Terrain  Plywood reduces impacts to lawns or other surfaces

Model 540 M Dolly Rig New England Geotech  Ideal for accessing tight areas where track rigs cannot manuever  Due to steep slopes and narrow openings, TRC has used this rig at several properties in New Bedford

Geoprobe Holes New England Geotech Note Leaves for Scale  Two-Inch diameter hole  Backfilled with remaining samples materials  Compacted  Top off with clean sand and similar surface material

NBHS/Area Time Line  Data Collection & Remedial Planning 2008  Prepare for/Initiate Public Bidding 2008/2009  Initiate Targeted Remedies 2009 (sooner if possible)

NBHS/Area Investigation Anticipated Remedial Elements/Options  Material removal  Clean soil cover  Excavation and consolidation with clean cover  Activity and use limitations (AULs)

Keith Middle School Monitoring Update  TRC Monitoring since March 2007  PCBs – Indoor Air/Vents  VOCs – Indoor Air/Vents

= Air Sampling Location N Hathaway Boulevard Building A Building B Gymnasium Cafeteria Kitchen B-3 Aud Faculty Dining C-3 Faculty Dining Courtyard A-3 Hallway Building C Background KMS Indoor Air Sampling - Locations

Background Sampling In Progress Hi-Vol Sampling Unit

Foundation Vent Stack Sampling Locations

Vent Sampling In Progress Low-Vol Sampling Pump (PCBs) SUMMA Canister (VOCs) Passive Vent Stack “PUF” Media

Total PCBs in Indoor Air Trends August December 2007

Vent Stack - PCBs Trends March December 2007

KMS Air Monitoring PCBs  PCBs KMS indoor air equivalent or < background air  PCBs well below EPA Action Level (0.050 ug/m3)  PCBs Present in Vent Samples Periodically (Background)

VOCs in Building A Indoor Air Trends August 2006 – December 2007

VOCs in Building B Indoor Air Trends August 2006 – December 2007

VOCs in Building C Indoor Air Trends August 2006 – December 2007

Risk Evaluation for Indoor Air Keith Middle School  Some compounds detected above AAL/TELs*  AAL/TELs are outdated  Risk evaluation shows no risk above MassDEP criteria  TRC to recommend updated comparison criteria based on more current toxicology *AAL-Allowable Ambient Limit TEL – Threshold Effect Exposure Limit

VOC Vent Stack Trends (VS-1) August 2006 – December 2007

VOC Vent Stack Trends (VS-4) August 2006 – December 2007

VOC Measurements Summary of Findings Keith Middle School  VOCs Present in Vents Consistently  VOCs in Vents  Generally decreasing in concentration over time  Also reflects compounds in soil gas (indicates system performing as designed)  VOCs KMS Indoor Air  Background concentrations (off-gassing of building materials)  Also attributable to maintenance activities