PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.

Slides:



Advertisements
Similar presentations
EELE 461/561 – Digital System Design
Advertisements

Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
SPACE PRODUCT ASSURANCE
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status of the ATLAS MM project
One Way Circuits Limited Printed Circuit Board Manufacturer A Guide To Manufacturing Multilayer PCBs Use Left and Right Cursor keys to navigate ESC to.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Printed Circuit Board Design
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Your PCB partner.
RD51 22/11/2011 RD51 22/11/2011 Your PCB partner RD51 22/11/2011.
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
PCB layout issues PCB alignment and spacing MMM meeting, 22/01/2014G. Sekhniaidze/ J. Wotschack1.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CERN PCB workshop activities
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Situation with industry Rui de Oliveira RD51 CERN October
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Situation with industry
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
MM detector construction One or several modules per sector considerations.
IPC Conductor Width and Thickness The width and thickness of conductors on the finished printed board shall be determined on the basis of the.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Low Mass Rui de Oliveira (CERN) July
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Resistive protections Rui de Oliveira 09/12/15
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
Micromegas for the ATLAS upgrade (MAMMA) Status report
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Low Mass Alice Pixel Bus Rui de Oliveira TE/MPE/EM 6/9/20161Rui de Oliveira Alice worshop.
Electron transparency studies with an exchangeable mesh Micromegas chamber Fabian Kuger 1,2 Paolo Iengo 2, Rui de Oliveira 2, Givi Sekhniaidze 2, Joerg.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Rev:A ( check-->19 pages document)
ob-fpc: Flexible printed circuits for the alice tracker
MicroMegas Mechanical Meeting --- Cern April 2014
Presentation transcript:

PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack

PCB specification document  Review of specs by Rui de Oliveira  Update concerning the accuracy on the cutting of the edges  Pressure for glueing can be reduced from 30 kg/cm 2 to 15 kg/cm 2 (tests done at CERN show no problem)  Interconnected lines (shorts)  Interrupted lines (resulting in partly dead strips)  Questions  How many defects of each type can we accept?  Shall we specify limits for these defects in the specs for the PCB producers and, if yes, which? PCB WG status, 25/03/2014Joerg Wotschack

PCB + readout strips PCB: -2250mmx 500mm ???? -single side -0.5mm thick +/- 10% -Starting copper foil : 17um thick copper + 17um or 35um copper protection -Final copper thickness 17um -Pattern absolute accuracy: +/-30um referring to the GERBER file in the 50cm side +/-120um referring to the GERBER file in the 2m side -120um minimum line and space, +/-20% general accuracy -NI/Au or Ag plating on connector fingers -Cutting absolute position accuracy : +/-50um referring to the copper pattern on the 50cm side +/-200um referring to the copper pattern on the 2m side -Cutting relative accuracy : (not referred to the pattern) +/-50um in all directions -Drilling absolute position accuracy : +/-50um referring to the copper pattern on the 50cm side +/-200um referring to the copper pattern on the 2m side -drilling relative accuracy : (not referred to the pattern) +/-50um in all directions 3Rev:B ( check-->19 pages document) Base material, when used, shall be flame retardant rated UL 94V-0 laminate glass fiber epoxy and conform to L94 according to IPC-4101/94. Copper shall be type H with pits and dent, class B. When procuring base material the following are required: minimum TG 170°C, minimum TD(5%) 350°C, minimum T min, maximum Z-axis thermal expansion coefficient above TG 280PPM/°C (alternatively Z-axis thermal expansion coefficient between °C of 3.5% maximum is acceptable) Fabrication and inspection shall be according to IPC-6011 and IPC-6012, class 2 Acceptance of finished printed boards shall be in accordance with IPC-A-600, class 2

How to deal with defects  We have observed some defects in the readout strips (metallic) in a number of boards delivered by ELTOS for the MMSW chambers (as presented by Fabian Kuger, e.g., in the Würzburg Meeting)  Defects are  Interconnected lines (shorts)  Interrupted lines (resulting in partly dead strips)  Questions  How many defects of each type can we accept?  Shall we specify limits for these defects in the specs for the PCB producers and, if yes, which? PCB WG status, 25/03/2014Joerg Wotschack

PCB WG status, 25/03/2014 QC on PCBs Besides systematic dimension deviations local defects on the PCBs are a QC issue: Defect: Interconnected strips Repaired lines are straight, width variations are small Damaged strip, huge width variationStrip is broken  dead channel

Considerations for the discussion  Tracks from the IP have inclinations between 7 and 35 degrees  Typical cluster sizes (track projection onto readout strips) are 10 – 28 mm or 3(4) to 8(10) strips.  A missing or interconnected strip will lead to a missing or wrong strip signal and thus to a larger position error  Comparable effects are created by the pillars (1% inefficiency)  Proposal: accept defects at a similar level as the inefficiency created by the pillars  ≤10 interconnected lines (shorts) as long as they are distributed; minimum distance between defects: 10 strips  ≤ 10 interrupted lines/PCB (1024 channels) as long as they are distributed; minimum distance between defects: 10 strips  The sum of interconnects and shorts: ≤10/PCB; minimum distance between defects: 10 strips PCB WG status, 25/03/2014Joerg Wotschack

What about spares?  How many PCBs of each type do we want to order? Minimum is 64 PCBs of each type  To cope with defects  To allow for selection of PCBs  To allow for accidents during panel construction  Is it cheaper to accept defects and to produce 10–20% more boards?  Option on re-processing after full delivery PCB WG status, 25/03/2014Joerg Wotschack

Test glueing status  End of last year we decided to ask industry for tests for Kapton foil glueing and pillar deposition over the (almost) full size PCBs (0.5 x 2.16 m)  Labs agreed to take responsibility for getting these tests done  Saclay deals with ELVIA  Frascati with ELTOS  US with Triangle Lab (tbc)  Goal is to have results by beginning of May PCB WG status, 25/03/2014Joerg Wotschack

Next steps  PCB layout version 0 exists (Givi)  Try to get agreement on general features today  Next steps  Integration with mechanics and FE board layout (AZ) and possibly other electronics boards until 15 April  Final checks with PCB lab until end April  Drawings ready for Module-0 ordering by 1 May  Need to order ≈100 PCBs for Module-0s  Order in three industries (ELTOS, ELVIA, Triangle Lab) ? PCB WG status, 25/03/2014Joerg Wotschack