Process Benchmarking Drives WWTP Maintenance Optimization within the National Water and Wastewater Benchmarking Initiative Presented by: David Main 84.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

Targets for the individual and the organisation By Rachel, Claire, Kirsten and Natalie.
1 © Life Cycle Engineering 2011 The Misguided Application of the Planner/Scheduler Tim Kister Senior Planner/Scheduler Life Cycle Engineering Carolinas.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Chapter 2 The Software Process
How to Successfully Implement & Use a CMMS Yorick de Tassigny, FMP, SFP John Rimer, CFM.
Management: Analysis and Decision Making
Balanced Scorecard Metrics Workshop UC Berkeley Business and Administrative Services March, 2001.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Chapter 7 Controlling - To Ensure Results
Capability Maturity Model (CMM) in SW design
The Australian/New Zealand Standard on Risk Management
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Clarity Educational Community Metrics that Matter Derek Phair & Eric Van Blarcum | May 4-6, 2015.
Integrating work flows of five utilities utilizing Oracle’s WAM
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
Capability Maturity Model
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Copyright 2012 John Wiley & Sons, Inc. Chapter 11 Project Control.
Chapter : Software Process
Reaching Goals: Plans and Controls
Systems Analysis and Design in a Changing World, 6th Edition
Sustainability and Total Cost of Ownership Strategies for Higher Education.
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16,
Chapter 2 The process Process, Methods, and Tools
N By: Md Rezaul Huda Reza n
Business Planning for a Successful Project Jason Karszes, Jeff Perry, Cathy Wickswat, Kyle Getty, Joan Petzen.
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Building the case for change Workforce Academy. Building blocks of change establishing the case for change assessing readiness for change building sponsorship.
Why PS 3150? Gordon Sparks, Ph.D.,P.Eng Gordon Sparks, Ph.D.,P.Eng.
11-1 PROJECT CONTROL Project Control Defined Types of Control Systems Need for Balance in Control Systems Control of Creative Efforts Changes and Change.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Chapter 2 Process: A Generic View
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
IPMA Executive Conference Value of IT September 22, 2005.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
WEEK TWO, Session 2 Information Gathering. Helpdesk metrics must be reprioritized from measuring internal efficiencies to evaluating customer retention.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
© OECD/IEA 2011 Energy Efficiency in Central Asia: Challenges and Opportunities VII KAZENERGY EURASIAN FORUM World in Transition Shaping Sustainable Energy.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
TDRp Implementation Challenges David Vance, Executive Director Peggy Parskey, Assistant Director October 23, 2014.
Software Project Management Lecture # 9. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
11 May 2005 The Benefits & Challenges of Enterprise Portfolio Management Michael S. Belk, MEM, CEI, CEM, MCP Manager IT Projects International Paper Company.
Continual Service Improvement Methods & Techniques.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
A Framework for Evaluating Coalitions Engaged in Collaboration ADRC National Meeting October 2, 2008 Glenn M. Landers.
Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.
Management, Supervision, and Decision Making Chapter 2.
The Geezers and the Geeks: Passing the Thumb Drive of Energy Efficiency Knowledge Danielle Gidding, Bonneville Power Administration Tom Eckman, Northwest.
Establishment of QIT and WIT 5S Training of Trainers for Training Institutions Training material No. 24.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Capability Maturity Model
Chapter 11 Project Control.
Capability Maturity Model
Presentation transcript:

Process Benchmarking Drives WWTP Maintenance Optimization within the National Water and Wastewater Benchmarking Initiative Presented by: David Main 84 th Annual Water Environment Federation Technical Exhibition and Conference - WEFTEC 2011 October Los Angeles, California, USA

Presentation Outline Performance Assessment Benchmarking in Canada for 12 years. Achieved early success, and we clearly addressed a need Metric Benchmarking Benchmarking is meaningless unless you do something with the results. Process Benchmarking is a vital tool for Performance Improvement Case Study to illustrate the example: Process Improvement in Water Wastewater Treatment Plant Maintenance At the end of the day, it is all about making organizational change, which is very hard to do

Benchmarking Canada’s Water Sector Water and wastewater services are a municipal responsibility. Our utilities are mostly publically owned. Provincial government acts as Regulator. Little direct Federal Government involvement or funding. Water is still plentiful and inexpensive. Generally under valued and priced (but starting to change) Benchmarking began in 1998 due to a lack of industry standard performance indicators and a means to communicate “real” results with stakeholders. Has become a nationally recognized standard and a Best Practice

National Water and Wastewater Benchmarking Initiative: 45 Utilities

Early Key Success Factors Very high level of cooperation amongst utility partners; Open sharing of information and ideas; benchmarking data is not blinded; Willingness to experiment, and pilot new ideas. Change on the fly if necessary; Patience: Prepared to make investment of time and energy.

What We Have Learned While not technically difficult, it IS hard work This is a communication project It actually works! We can now measure progress with numbers and facts Metric Benchmarking on its own of limited use; you need a plan to begin Performance Improvement Breaking the habits of the past is hard, but it MUST start.

7 generic goals that are common to all utilities - Using performance indicators that measure attainment of each goal - About 75 individual performance measures NWWBI Performance Indicator Framework

One of our first Performance Indicators Reactive Maintenance Ratio = Unplanned Maintenance Hours Total Maintenance Hours Measure of Maintenance Efficiency

Results: Meaningless?

Issues Well defined PI but something was missing This issue was the subject of a detailed debate at annual workshop Workshop was attended by “generalists” who were also confused Next Step? Drill down into process Establish a Task Force to conduct Process Improvement Benchmarking

Utility Goal Attainment Metrics Process Improvement Benchmarking Formal Transition to Process Improvement “If is it not formalized, it will stall when the hard work begins”

Performance Improvement from Metric Benchmarking Takes Time 1 st Iteration 2 nd Iteration3 rd Iteration4 th Iteration5 th Iteration Data Collection Data Analysis Process Benchmarking Best Practice Implementation Allocation of Effort

Process Benchmarking Requires Difference Skills from Metric Benchmarking Data Collection Data Analysis Process Benchmarking Best Practice Implementation O&M Staff Process Experts Section Managers Utility Directors Managers Utility Support Services Section Managers Generalists Specialists Metric Benchmarking Process Benchmarking

Process Improvement Task Force Task Force work moves to process specialists: In this case is was Maintenance Engineers and Maintenance Planners Establish Task Force Terms of Reference and Objectives Project Manager develops Workplan to achieve objectives Task Force participants take portions of the work and collaborate on results. Detailed but focused discussion

The Challenge How do we express our maintenance situation to City management to ensure that we are adequately resourced? How can we demonstrate that we are running maintenance efficiently and cost effectively? How can we forecast our future maintenance needs and requirements in specific terms? How will these plants be maintained after the retirement wave has passed?

Begin Addressing the Complete Maintenance Management Picture Forecasting Planning Conducting Reporting and Checking Budgets Resource Requirements PM Planning Crew Scheduling Job Scoping WO Planning/Estimates WO Charge Details Inventory Charges WO Actuals Attainment and Variance Reports Annual Report Annual Maintenance Plan “Action Needed” Report Quantification of all Work

We had long debates on these “basics” Reactive work = Emergency and Urgent work Reactive work causes you to break your schedule Corrective work can be reactive or proactive Preventive Work is always proactive Planning: The act of scoping and planning a Work Order Scheduling: The act of organizing the Work Order to occur at an optimized and preplanned time. Work is Proactive if it is planned and scheduled Account for “Unavailable but Paid Time”: Includes vacation, sick, training etc. Step One: Agree on terminology basics

So, this facility has 23% Reactive Work…so what.

We can now isolate and quantify the problem This WWTP Facility is not completing its PM program. Less than 50% complete in fact Emergency work not a problem, but urgent work loads are much higher than estimated. What is the cause of this urgent work? Losing maintenance staff to capital work Slighter higher volume of unavailable time than estimated. Too much reactive corrective work is resulting in the PM program not being completed –Over a longer term, this is a serious situation

Step 2: Define the Business Process for Conducting Maintenance Process Task Force defined two distinct types of maintenance work; each requiring a well defined work process: –Corrective Maintenance –Preventive Maintenance

Corrective Work Order Process View 1.Initiate work with WO: Asset problem identification 2.Plan the work: Estimate work. Organize the work in advance 3.Schedule work 4.Conduct the Work 5.Close the WO with correct data: Failure code, delay code 6.Evaluate past work with use of failure, delay codes, etc.

Here are the Productivity Improvement Opportunities: Begin applying a standardized Failure Mode on all corrective WOs –Enables the application of asset management by building historical data to support the repair vs replace assessment Begin applying a standardized Work Order delay code on all WO that exceed the estimate by more than 15% –This is how you begin making systematic improvements in maintenance productivity.

Preventive Maintenance Work 1.CMMS generates weekly PMs 2.Schedule the PMs in association with other work 3.Conduct the PMs. New WO required? 4.Close the WO with correct data 5.Report % attainment of PM Program regularly

Conclusion Metric Benchmarking is not enough. Its is only a good start. Process Benchmarking is the key to success. Process Benchmarking is exponentially more complex that Metric Benchmarking: Very few “quick wins” –Required different skills sets –Requires much more data to support Key Resources: –Internal staff who know their job –Best Practice documentation or experts (don’t reinvent the wheel) –Project Manager to keep the progress on track: Process experts tend to get bogged down in details

David Main, AECOM This presentation is available for downloading at: Public Report, Performance Measures Index, and detailed glossaries are available at: Kendal Martens, City of Calgary